Panel Points
Panel Points
Sr.
Observations
No.
Incomer sections :
1.Cables are fouling on Basbur and not in proper
routing (As per standards above 63Amps MCCB
bus bar arrangment to be done )
2.Insulation tape used for cable lugs which need to
2
be changed with heat Slinkable sleeve with proper
color coding Red ,Yellow,Blue , Black )
3.CT mounted with cable tie which need to mounted
with proper support
4: All ACB feeder needs ventilation
Outgoing feeder
1: No connectors segergator
3 2:Insulation tape used for cable lugs which need to
be changed with heat Slinkable sleeve with proper
color coding Red ,Yellow,Blue , Black )
Outgoing feeder
1:No use of cutout
4
2: Horzinatal busbar all bolts and nuts in proper
size
Outgoing feeder
1:Cable tie stickers need to remove
5
2: Controls cables fouling of busbar , need to do in
proper routing
Outgoing feeder
6
1:No Earthing connectivity
Main incomer
7 1:CT's provided at incomer side of the MCCB
2: CT's are fouling to eachbusar
Outgoing feeder
1:No proper cables sleeves in between lugs and
8
cable
2: No seelve for thread rod
Outgoing feeder
1:No busbar end caps
2:CT's are fouling to eachother busbar
9
3: Incoming bus and outgoing busbar are very close
and FRP sheet in between incoming bus bar and
outgoing busbar
Outgoing feeder
10 1:Door in damged of 3 feeders
Outgoing feeder
11 1:Provide FRP sheet for all cutouts
2:Lot of cutting in arylic sheet
Ougoing feeder
1:No phase barrier
13
2: No proper routing for cables
Outgoing feeder
1:No phase barrier and phase segergator
2: Insulation tape used, provide proper heat
slinkable seelve
16
3:No proper routing of cables
4: Power cables and control cables are fouling
5: Above 63Amps MCCB busbar arragement to be
done
Outgoing feeder
1:No selve for MCCB incoming cables
17 2: No phase barrier for all MCCB
3: Power cables are fouling to each phase cables
Outgoing feeder
18
1:Gap between cable and legs
Outgoing feeder
1:No FRP sheet MCCB for outgoing cables
2:No phase barrier
19
3:Above 63Amps MCCB busbar arragement to be
done
Outgoing feeder
1:CT's are over dia and CT's are fouling eachother
20 2: CT's are fouling each other
3: Cable tie need to remove for CT's support ( its
not as per standard)
Outgoing feeder
1:MCCB feeder Incoming cables are fouling on
bubar
21 2: Insulation tape need to remove , heat shinkable
seelve need to provide for in between lugs and
cables
3: Busabar is very close to compartment sheet
Outgoing feeder
22 1:No end caps for busbar
2:Incoming and outgoing busbar no FRP sheet
23 BAKING PANEL
Incoming
1:Control wiring is in MCCB compartment
24 2: Cable tie stickers are not standard
3: CT's are fouling on eachother
4: No proper cable routing
Outgoing feeder
1:No phase barrier and phase segergator
2: Insulation tape used, provide proper heat
25
slinkable seelve
3:No proper routing of cables
4: Power cables and control cables are fouling
Outgoing feeder
1:No selve for MCCB incoming cables
26 2: No phase barrier for all MCCB
3: Power cables are fouling to each phase cables
Outgoing feeder
27
1:Gap between cable and legs
Outgoing feeder
1:No FRP sheet MCCB for outgoing cables
28
2:No phase barrier
Outgoing feeder
1:CT's are over ID and CT's are fouling eachother
29 2: CT's are fouling each other
3: Cable tie need to remove for CT's support ( its
not as per standard)
Outgoing feeder
1:MCCB feeder Incoming cables are fouling on
bubar
30
2: Insulation tape need to remove , heat shinkable
seelve need to provide for in between lugs and
cables
Incoming and outgoing
31
1:No end caps for busbar
Outgoing feeder
1:All MCCB tightness connections are loose
2:No FRP sheet for live parts
33
3:Above 63Amps MCCB busbar arragement to be
done
Outgoing feeder
1:No phase barrier and phase segergator
2: Insulation tape used, provide proper heat
36
slinkable seelve
3:No proper routing of cables
4: Power cables and control cables are fouling
Outgoing feeder
1:No selve for MCCB incoming cables
37 2: No phase barrier for all MCCB
3: Power cables are fouling to each phase cables
Outgoing feeder
38
1:Gap between cable and legs
Outgoing feeder
1:No FRP sheet MCCB for outgoing cables
2:No phase barrier
39
3:Above 63Amps MCCB busbar arragement to be
done
Outgoing feeder
1:CT's are over ID and CT's are fouling eachother
40 2: CT's are fouling each other
3: Cable tie need to remove for CT's support ( its
not as per standard)
Outgoing feeder
1:MCCB feeder Incoming cables are fouling on
bubar
41
2: Insulation tape need to remove , heat shinkable
seelve need to provide for in between lugs and
cables
Outgoing feeder
1:Power cables on MCCB compartmet
2:No FRP sheet for live cables
46 3:Above 63Amps busbar arragement to be done
4: Cable tie stickers need to remove
5: No Phase segergator
6: No sleeve for cables
Outgoing feeder
1:All feeders MCCB arragement not in sequence
2:No FRP sheet for live cables
47 3:Above 63Amps busbar arragement to be done
4: Cable tie stickers need to remove
5: No Phase segergator
6: No sleeve for cables
Outgoing feeder
48 1:MCCB compartment lot of holes
Outgoing feeder
1:NO tightness in MCCB
2:No FRP sheet for live cables
49 3:Above 63Amps busbar arragement to be done
4: Cable tie stickers need to remove
5: No Phase segergator
6: No sleeve for cables
Incoming
1:Control wiring is in MCCB compartment
50 2: Cable tie stickers are not standard
3: CT's are fouling on eachother
4: No proper cable routing
Outgoing feeder
1:No phase barrier and phase segergator
2: Insulation tape used, provide proper heat
51
slinkable seelve
3:No proper routing of cables
4: Power cables and control cables are fouling
Outgoing feeder
1:No selve for MCCB incoming cables
52 2: No phase barrier for all MCCB
3: Power cables are fouling to each phase cables
Outgoing feeder
53
1:Gap between cable and legs
Outgoing feeder
1:No FRP sheet MCCB for outgoing cables
54
2:No phase barrier
Outgoing feeder
1:CT's are over ID and CT's are fouling eachother
55 2: CT's are fouling each other
3: Cable tie need to remove for CT's support ( its
not as per standard)
Outgoing feeder
1:MCCB feeder Incoming cables are fouling on
bubar
56
2: Insulation tape need to remove , heat shinkable
seelve need to provide for in between lugs and
cables
Incoming and outgoing
57
1:No end caps for busbar
Outgoing feeder
1:All MCCB tightness connections are loose
2:No FRP sheet for live parts
58
3:Above 63Amps MCCB busbar arragement to be
done
59 HYGINE PANEL
Incoming
1:No busbar arragement for incomer
2:Above 63Amps MCCB busbar arragement to be
60
done
3: No connector barrier
Outgoing feeder
1:cable chamber compartment is less size, diffculut
to connect the outgoing cables
61
2: No connector barrier
3:Above 63Amps MCCB busbar arragement to be
done
Incoming
1:Control wiring is in MCCB compartment
62 2: Cable tie stickers are not standard
3: CT's are fouling on eachother
4: No proper cable routing
Outgoing feeder
1:No phase barrier and phase segergator
2: Insulation tape used, provide proper heat
63
slinkable seelve
3:No proper routing of cables
4: Power cables and control cables are fouling
Outgoing feeder
1:No selve for MCCB incoming cables
64 2: No phase barrier for all MCCB
3: Power cables are fouling to each phase cables
Outgoing feeder
65
1:Gap between cable and legs
Outgoing feeder
1:No FRP sheet MCCB for outgoing cables
66
2:No phase barrier
Outgoing feeder
1:CT's are over ID and CT's are fouling eachother
67 2: CT's are fouling each other
3: Cable tie need to remove for CT's support ( its
not as per standard)
Outgoing feeder
1:MCCB feeder Incoming cables are fouling on
bubar
68
2: Insulation tape need to remove , heat shinkable
seelve need to provide for in between lugs and
cables
Incoming and outgoing
69
1:No end caps for busbar
Outgoing feeder
1:All MCCB tightness connections are loose
2:No FRP sheet for live parts
70
3:Above 63Amps MCCB busbar arragement to be
done
Incoming
1:Control wiring is in MCCB compartment
74 2: Cable tie stickers are not standard
3: CT's are fouling on eachother
4: No proper cable routing
Outgoing feeder
1:No phase barrier and phase segergator
2: Insulation tape used, provide proper heat
75
slinkable seelve
3:No proper routing of cables
4: Power cables and control cables are fouling
Outgoing feeder
1:No selve for MCCB incoming cables
76 2: No phase barrier for all MCCB
3: Power cables are fouling to each phase cables
Outgoing feeder
77
1:Gap between cable and legs
Outgoing feeder
1:No FRP sheet MCCB for outgoing cables
78
2:No phase barrier
Outgoing feeder
1:CT's are over ID and CT's are fouling eachother
79 2: CT's are fouling each other
3: Cable tie need to remove for CT's support ( its
not as per standard)
Outgoing feeder
1:MCCB feeder Incoming cables are fouling on
bubar
80
2: Insulation tape need to remove , heat shinkable
seelve need to provide for in between lugs and
cables
Outgoing
1:Above 63Amps MCCB busbar arragement to be
84 done
2:No proper routing of power cables
3:No Phase barrier
Compartment
1:Outgoing connectors are fouling no gap in
85 bewteen opposite connectors
2: No connectors barrier
Outgoing
86 1:MCCB outgoing cables are short bend
2: No phase segregator on MCCB
Outgoing
87 1:No selve and in between legs and cables gap
Compartment
88 1:Horizontal busbar is excess
2:Busbar bolts and nuts are not in proper size
Incoming
1:Control wiring is in MCCB compartment
89 2: Cable tie stickers are not standard
3: CT's are fouling on eachother
4: No proper cable routing
Outgoing feeder
1:No phase barrier and phase segergator
2: Insulation tape used, provide proper heat
90
slinkable seelve
3:No proper routing of cables
4: Power cables and control cables are fouling
Outgoing feeder
1:No selve for MCCB incoming cables
91 2: No phase barrier for all MCCB
3: Power cables are fouling to each phase cables
Outgoing feeder
92
1:Gap between cable and legs
Outgoing feeder
1:No FRP sheet MCCB for outgoing cables
93
2:No phase barrier
Outgoing feeder
1:CT's are over ID and CT's are fouling eachother
94 2: CT's are fouling each other
3: Cable tie need to remove for CT's support ( its
not as per standard)
Outgoing feeder
1:MCCB feeder Incoming cables are fouling on
bubar
95
2: Insulation tape need to remove , heat shinkable
seelve need to provide for in between lugs and
cables
Outgoing feeder
1:All MCCB tightness connections are loose
2:No FRP sheet for live parts
97
3:Above 63Amps MCCB busbar arragement to be
done
100
102
103 UPS OUTPUT PANEL
1) No connectors segergator
1) Excess cutout need to close
2) No Acrylic sheet used for live parts
Close
1) CT's need to provide at the incomer
MCCB outgoing side
2) Busbar arragement for 63Amps
MCCB not done
Close
1) No connectors barriers
2) Holes are not closed at connectors
supports
1) Horizontal busbar excess not
removed
1) No FRP sheet for live parts
1. Not Require
2.Shut down require for the same. And also suggest how
we can fix with backlite support
Close
1. CT we can fix any side of MCCB incomer or outgoing,
2. Cable arrangement as per requirement and standard
Close
Close
1. Live part cover please see the photo and on other end
phase barrier provided.
2. Cable arrangement as per requirement and standard.
3. Cable tie sticker also standard which already discussed
in many meetings.
1. Done
2. it not possibel now, as all requirement earlier we have
done, and the drawing details all are we submitted
through handing over doc.
3. Noted