(8 Marks) : Activity Description Optimistic Likely Pessimistic Predecessors
(8 Marks) : Activity Description Optimistic Likely Pessimistic Predecessors
(8 Marks) : Activity Description Optimistic Likely Pessimistic Predecessors
Question 1: (8 marks)
Study the table below listing the Activity Duration estimates and sequencing for
Project Delta; and answer the following questions.
a. Arrive at the estimated duration times for each activity using the Beta
distribution.
b. Draw the network / precedence diagram for the project activities.
c. Identify the critical path(s) with the forward and backward passes.
Question 2: (7 marks)
PGDM Document
SDM IMD 2014-15
Question 3 (8 marks)
An application has to be created named "FPTracker", and as its name implies, it's a
tool that is used to calculate Function Points (FP) counts on other applications. For
instance, a company wants to perform FP counts on their applications, this application
would record the data from the functions in the applications using this tool. As output,
it provides some convenient reports and an analysis of the data to help not making
errors in the FP counts.
PGDM Document
SDM IMD 2014-15
PGDM Document
SDM IMD 2014-15
PGDM Document
SDM IMD 2014-15
REFERENCE TABLES
I. Rate
No. of Outputs x4 x5 x7
No. of Inputs x3 x4 x6
No. of inquiries x3 x4 x6
No. of Files x7 x 10 x 15
No. of Interfaces x5 x7 x 10
Mode a b a b
Organic 2.4 1.05 3.2 1.05
Semi-detached 3.0 1.12 3.0 1.12
PGDM Document
SDM IMD 2014-15
High
Personnel Attributes
Analyst Capability (ACAP) 1.46 1.19 1.00 0.71
Application Experience
(AEXP) 1.29 1.13 1.00 0.91 0.82
Programmer Capability
(PCAP) 1.42 1.17 1.00 0.86 0.7
Virtual Machine Experience
(VEXP) 1.21 1.1 1.00 0.9
Programming Language
Experience (LEXP) 1.14 1.07 1.00 0.95
Project Attributes
Use of Modern Programming
Practices (MODP) 1.24 1.1 1.00 0.91 0.82
Use of Software Tools
(TOOL) 1.23 1.1 1.00 0.91 0.82
Required Development
Schedule (SCED) 1.24 1.08 1.00 1.04 1.1
Product Attributes
Required Software
Reliability (RELY) 0.75 0.88 1.00 1.15 1.4
Product Complexity
(CPLX) 0.7 0.85 1.00 1.15 1.3 1.65
Computer Attributes
Execution Time
Constraint (TIME) 1.00 1.11 1.3 1.66
Virtual Machine
Volatility (VIRT) 0.87 1.00 1.15 1.3
Computer Turnaround
(TURN) 0.87 1.00 1.07 1.15
PGDM Document