This document provides a bar bending schedule for rebar in a bridge slab. It lists 17 different bar marks with information including bar size, spacing, number of bars, total number, length, total length, weight, and remarks describing the purpose and location of each bar mark. The total weight of rebar is 3,023.39 kg.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
546 views2 pages

Bar Bending Schedule

This document provides a bar bending schedule for rebar in a bridge slab. It lists 17 different bar marks with information including bar size, spacing, number of bars, total number, length, total length, weight, and remarks describing the purpose and location of each bar mark. The total weight of rebar is 3,023.39 kg.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BAR BENDING SCHEDULE FOR SLAB FOR BRIDGE AT KM 1+093

NO.
BAR OF NO. OF TOTAL LENGTH TOTAL WEIGHT
BAR MARK SIZE SPACING BARS MEMBERS NUMBER BENDING SKETCH (MM) LENGTH (KG) REMARKS

Mid section of 8m
01 T12 150 54 1 54 12,000.00 648.00 575.42
span - clear span is 11
m

01a T12 150 54 1 54 12,000.00 648.00 575.42

01 T12 150 27 2 54 6,780.00 366.12 325.11 Edge section of 4 m -


clear span is 11 m

01a T12 150 27 2 54 6,780.00 366.12 325.11

Along the perimeter


of the slab, i.e
11.706m and 12 m
sides

01b T12 3 1 3 51,000.00 153.00 135.86


Hook at intemediate
points to
accommodate the
camber at center of
slab (along 11 m clear
01c T16 300 37 1 37 380.00 14.06 12.49 span)

Chairs at intervals
along the slab

01d T15 80 1 80 1,740.00 139.20 123.61

Foot path section -


02 and 02a T12 150 11 2 22 26,000.00 572.00 507.94 1.5 m span

Midsection - 4.0 m
02 and 02a T12 150 27 2 54 26,200.00 1,414.80 1,256.34 span upto center

1 2 2 2,154.00 4.31 3.83

1 2 2 1,742.00 3.48 3.09 540 mm span on


03 T12 150
footpath

1 2 2 1,329.00 2.66 2.36

11,460 mm span on
03 T12 150 74 2 148 2,230.00 330.04 293.08 footpath

04 T12 200 8 2 16 27,000.00 432.00 383.62 Footpath


01 (exp) T12 150 5 2 10 11,746.00 117.46 104.30

Slab underneath the


expansion joint, along
the skew length of
01 a(exp) T12 150 5 2 10 11,746.00 117.46 104.30 11,707 mm -

Slab underneath the


02 (exp) expansion joint, along
and 02 the length of 12,000
a(exp) T12 200 59 2 118 1,940.00 228.92 203.28 mm

02 bb
(exp) T16 200 59 1 59 1,190.00 70.21 62.35

02 b (exp) T16 200 59 1 59 705.00 41.60 36.94 Expansion joint length

02 c (exp) T12 3 2 6 11,630.00 69.78 61.96 Expansion joint length


TOTAL WEIGHT 3,023.39