Proposed Construction of (Lb+Ub+S+10) Hotel-Cum-Multiplex Building Project AT Mouza - Chandrashekharpur, Bhubaneswar
Proposed Construction of (Lb+Ub+S+10) Hotel-Cum-Multiplex Building Project AT Mouza - Chandrashekharpur, Bhubaneswar
Proposed Construction of (Lb+Ub+S+10) Hotel-Cum-Multiplex Building Project AT Mouza - Chandrashekharpur, Bhubaneswar
OF
PROPOSED CONSTRUCTION OF (LB+UB+S+10) HOTEL-CUM-
MULTIPLEX BUILDING PROJECT
AT
MOUZA- CHANDRASHEKHARPUR, BHUBANESWAR
Promoted by
M/s Risk Software Solutions Pvt. Ltd.
Applicant Name:
Mr.Mohinder Prakash, Director
&
Mr.Anup Kumar Lakhotia,Director
BMC Bhawani Saheed nagar Enclave
Saheed Nagar, Bhubaneswar- 751007
CONTENT
Chapter-I Introduction 03 to 11
Project at a Glance
Sl.No Name of the Company : M/s Risk Software Solution Pvt. Ltd.
01. Constitution : Private Limited Company
Hotel-cum-Multiplex Building Project at
02. Project
mouza- Chandrasekharpur, Bhbaneswar
Regd. Office Address:
M/s Risk Software Solution Pvt. Ltd.
269, GT Road, Liluah, Howrah, Pin-711204
Branch Office
BMC Bhawani Saheed nagar Enclave
03. Location : Saheed Nagar, Bhubaneswar- 751007
Phone : No.:0674-2542707-
Construction Site
Chandrasekharpur , Infront of CIPET
ENGINEERING COLLEGE ,Bhubaneswar,
Odisha.
04. Total Capital Investment : 37.00 crores .
Mr.Mohinder Prakash
(Director)
The Hotel Building Project will be developed by M/s Risk Software Solution Pvt.Ltd.
The site is located at Village Mouza Chandrasekharpur, Bhubaneswar, District-
Khorda, on a land measuring 8096.26 Sq.mt. The project will provide good
infrastructure facilities and state of the art technology and will be developed taking
into account eco-friendly features in order to provide a healthier environment. There
is requirement of environmental clearance from the State Impact Assessment
Authority (SEIAA) as the built up area is 35,942.14 Sq.mt as and the project falls in
item 8(a) of Building and construction project as per the EIA Notification,2006 and
2009 and subsequent amendments theretof of MoEF & CC . The project cost is 35.00
crores.
With a consistently growing middle class and increasing disposable income, the
tourism and hospitality sector is witnessing a healthy growth and accounts for 7.5 per
cent of the country's GDP and 8.78 percent of the total employment in the country.
The Indian tourism and hospitality industry has materialized as one of the key drivers
of growth among the services sectors in India. According to a report by KPMG, the
hospitality sector in India is expected to grow at 16.1 per cent CAGR to reach Rs
2,796.9 thousand crore in 2022.The hospitality sector encompasses a wide variety of
activities within the services sector and is a major job provider both direct and
indirectly. The growth in the hospitality sector and its contributions to the GDP will
continue to be substantially higher than other sectors of the economy on the back of
huge tourism potential in the country. The proposed project is of the latest additions
to contribute to the hospitality and service sector.
Moreover, Bhubaneswar the capital city of Odisha is growing at a faster rate. The
population of the city is growing. Corporate houses and Govt. offices are coming up
in Bhubaneswar. There is a demand for shopping, entertainment and social
gatherings.
Bhubaneswar located in the eastern part of India is one of the popular tourist
destinations. With well known pilgrimage venue, historical temples and sightseeing
places and close to Puri and Konark become main attraction for tourist all over the
world. There is immense demand for hotel accommodations throughout the year.
M/s. Risk Software Solution Pvt. Ltd. will cater the demand for hotel industries,
shopping and entertainment with this project.
1.2.1 STRENGTH OF THE PROJECT
The Developer and its sister concern are all well experienced with proven track
records and market understanding in the hotel development field for last few
years.
The proposed project is located at a very prime location of the city suburbs. Thus
marketing of the project is expected to be very smooth and hassle free.
State of the art structural designs by highly qualified and competent design
engineers to provide a safe and secure habitat to its apartment owners.
Financial strength of the developer had ensured uninterrupted work and timely
completion of the project undertaken by the group. The project is expected to draw
strength from this.
Provisions for most modern and sophisticated safety and security arrangements are
expected to instill confidence amongst the probable customers.
In house internal control system and stringent monitoring system will eliminate
any kind of complacency creeping in among work force. This is expected to
ensure uniformity in the workmanship.
Construction work will be carried out in strict conformity to the building rules and
other applicable provisions of laws & Statutes presently applicable in the country.
11. To carry on the business of tobacconists in all its branches and to sell,
make-up and manufacture tobacco, cigars, cigarettes and snuff.
12. To act as cargo agents, travel agents, ship brokers, charter party contractors,
ship agents, packing forwarding and clearing agent, salvors, wreck
removers, wreck raisers, auctioneers, inspectors and observers of quality
control custom-house agents, commission agents and general sales agents for
any of the air lines, steam-ship companies, railway and transport companies or
any such person.
15. To trade, deal in and undertake manufacturing, of bricks, tiles, pipes, cement,
lime and building construction requisites and to carry on all or any of the
business of builders, contractors, architects, decorators, furnishers and to
acquire, hold, mortgage lease, take on lease, exchange or otherwise deal in
lands, buildings, house, flats, bungalows, shops, here-dita-ments of any tenure
or freehold for residential or businesses purposes.
17. To cultivate, tea, coffee, chinchona and any other such similar product and to
carry on the business of planters in all its branches, to carry on and do
the business of cultivators, winners and buyers of every kind of
vegetable mineral or such other product of soil, dispose of and deal in any
such produce, either in its prepared, manufactured or raw state and either by
wholesale or retail.
19. To carry on the business of purchase and sale of petroleum products, to act
as dealers and distributors for petroleum companies, to run service stations for
the repair and servicing of automobilies and to manufacture or deal in fuel
oils, cutting oils and greases.
20. To carry on the business of iron-founders, makers of scientific, industrial and
surgical instruments, mechanical engineers, and manufacturers of agricultural
implements and other machinery, steel castings and forgings and malleable iron
and steel castings, tools makers, brass founders, metal workers, boiler-
makers, mill wrights, machinists, iron and steel converters, smiths,
builders, painters, mettallurgists, electrical engineers, water supply
engineers, gas makers, farmers, printers, carriers and merchants and to buy,
sell, manufacture, repair, convert, alter, let on hire and deal in machinery,
implements and rolling stock.
33. To sell, breed, import, export, improve, prepare, deal and trade in cattie,
bird, poultry, game, live and dead-stock of every description eggs, pork-pipes
sausages, pickles spices, sauces, jams, jelly, custard, prawn, potted meats,
macaroni, spaghetti table delicacies, bread, biscuit, wine biscuits and such
other ferinaceous goods and products cocoa, confectionery , cakes and buns.
37. To purchase, hold and acquire mines, mining leases, mining rights, mining
claims and metalliferrous lands and explore, work, exercise, develop and turn
to account all sorts of major and major minor minerals working of deposits of
all kinds of minerals and subsoil materials and to crush, win, set, quarry, smelt,
calcine, refine, dress, amalgamate, manipulate and prepare for market ores,
metals, and mineral substances of all kinds and to carry on metallurgical
operations in all its branches and to prepare, process, manufacture, assemble,
fabricate, cast fit, press machine, treat, weld, harden, plate, temper, anneal any
kind of metals and consequential products.
40. To manufacture, buy, sell, import, export, alter, improve, manipulate, prepare
for market, exchange, install, repaire, service, let on hire and deal in all kinds of
surgicals X-ray units, X-ray equipments, telecommunication machines, business
machines, intercoms, teleprinters, dictating, and recording machines, broadcasting
apparatuses, loud-speakers, radios, auto-radio reverberators, tape-players, cassette
tapes, headphones, stereo-complex speakers, radios control equipments, cameras,
binoculars, microscopes, projectors, telescopes, television sets, refrigerators, coolers,
radars, computers and spare parts.
Promoters Background
1. Sri Ashok Kumar Lakhotia along with his two sons Sri Anup Lakhotia and Sri Aditya
Vikram Lakhotia are the promoters of the Bhawani Group.
The group was established in the 1980’s by Sri Ashok Kumar Lakhotia which was later
joined by his two talented sons to handle and manage the group business to take to it
heights and achieve their goals.
The group is a diversified in nature having different business in all fields. They are well
known for the well managed and most modern diagnostic centre consisting of MRI and
CT Scanners.
They have many more business in the field of packaging, Iron and Steel, Aluminium
circles Plastic Tubes and Pipes and above all is well renowned in the field of Real Estate
and development.
They are also having a Banquet Hall named as Lakhotia Palace in the heart of Liluah in
Howrah. The said Banquet hall is well reputed and is given on hire for the marriages and
other social functions.
They have vast goodwill and highly reputed in all its buisness fields mainly in West
Bengal and Orissa. The group is managed by young professional talents to committed to
quality, progress and profit Entrepreneurship, integrity, hard work and commitment
towards people and society is the main object of the group.
Features:
They have completed many big and small project since its incorporation. The main few
projects completed by them are given below:
Utkal Housing Complex : It was a joint venture project with Cuttack Development
Authority over plot No. 1566 P Sector 6 Bidanasi Cuttack on land area 2 acre. the said
complex is comprised of 34 independent Duplex HIG Houses.
Jubilee Tower : A joint venture Project with Cuttack Municipal Corporation over .5 acre
plot No.488 Jublee market, Choudhary bazar , Cuttack.The said project was built up having a
built up area of 55000 Sq. Ft.
Bhawani Enclave Phase I : It was a joint Venture Project with Cuttack Development
Authority over Sector 9 Bidanasi Cuttack on 1.25 acre land area. The said complex is
comprised of 18 independent Duplex HIG Houses.
Bhawani Enclave Phase II : It was a joint Venture project with Cuttack Development
Authority over plot No. IL/B/2 Sector 8 Bidanasi Cuttack on land area 1.75 acre. The said
complex is comprised of 21 independent Duplex HIG Houses.
The Group is having a vast goodwill and has good bureaucrats connections all over Orissa mainly in
Cuttack and Bhubaneswar. And the Orissa Government is having good comfort to work with the
group in all respects and is also highly satisfied with the quality and other aspects of their working
profile. Their previous experiences with the group in the field of work and performances allow them
to work with freedom in any type of project big or small.
Risk Software Solution Private Limited has multiplexes,hotels, built homes and offices in
Bhubaneswar and West Bengal. These projects have been made possible due to our
commitment to quality workmanship, services and business ethics, values to which we
have put the Express Seal of Guarantee.
Top Quality Construction
We use only the best of material and manpower in our construction activities. We build
homes and offices with quality architectural support.
Personalized Service
Our clients come before everything else. Full customer support has kept Express owners
fully satisfied across the country
Clean Clear Dealing
Honest, straight deal, clean and clear paperwork mark Risk Software Solution Private
Limited commitment to proper business ethics. Our aim is to build lasting relationships
with our clients.
Amenities
All projects have one distinguishing feature and that is that they have excellent amenities
such as clubhouse, sports etc.
19
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
1.3.2 Philosophy
Risk Software Solution Private Limited is committed towards conducting its business in
accordance with not only applicable laws, rules and regulations but also with high
standards of business ethics. It believes that its Board of Directors as well as Senior
Management should follow and promote honest and ethical conduct of the business along
with complying with applicable laws, rules and regulations. They must abide by the
policies and procedures so as to ensure its commitment to compliance and create and
maintain a culture of high ethical standards and maintain a work environment that
encourages not only the staff but also the stakeholders to raise their faith in the
management of the Company. The Board of the Company hereby presents the Code of
Conduct with an intention to provide guidance and mechanisms to help foster abidance to
its above-illustrated philosophy on Code of Conduct.
To provide a high quality houses to our customers that will stand on the strong roots of
technical professionalism.
To consistently achieve client satisfaction by providing all construction related services
including design on turnkey basis & assuring timely completion of projects within budget
& with excellent quality.
To give the best possible value for every rupee the customers invest in the houses built by
us.
To fulfill the growing demands of people for dream homes in the Capital City of
Bhubaneswar. We are committed to provide Duplex homes and Apartments at
competitive prices.
We strive hard to meet the customer’s choice, specifications and other requirements by
exploring the best possible options through our professional team of experts.
We believe in Customer First philosophy. Our projects are litigation free and we can
assure our customers to live tension free.
Risk Software Solution Private Limited its employees embrace responsible citizenship
and corporate responsibility. They believe that they are collectively responsible to
substantively contribute to the communities in which they live and work to help develop
their communities. It encourages employee volunteerism, civic, charitable and
community involvement. Utilizing corporate resources, Risk Software Solution Private
Limited: engages in a selected range of charitable and philanthropic activities to honor
and enhance peoples' lives and to offer its talents and its wealth to help improve the
world it shares. It aspires to be a role model business leader.
It committed to safe guarding, protecting and preserving its physical environment for
present and future generations to use and enjoy. It will develop and implement business
20
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
practices consistent with sound environmental management and encourage and influence
others to do the same. It will not engage in activities or develop products that that have
any significant negative impact on the environment.
It responsible stewards of its natural and physical environment and natural resources
including our soil, trees and plants, water, air, wild life and farm animals. It recognizes
that they are essential to the perpetuation of its communities and generations, and commit
to care for and protect them.
1.3.4 Performance
The pursuit of superior performance permeates every Risk Software Solution Private
Limited: activity. It aspires to be distinguished as an exemplary company and an
outstanding corporate citizen. They must therefore never settle for doing less than their
best, while they continue to surpass what already has been achieved.
1.3.5 Management
Genesis of Greatness lies in pursuit of vision and commitment to hard work and human
values.
Risk Software Solution Private Limited: has moved through monumental stages from its
inception, growth, and expansion to deliver quality hotel projects & Real Estate Projects.
The Company is expanding into newer horizons with a missionary zeal and a dynamic
team under the leadership of a strong visionary of member of Board Directors.
Speciality:
Commercial
Residential
21
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
CHAPTER-2
PROJECT & SITE DETAILS
This chapter is an introduction to the site for proposed development with respect to its
location. Reconnaissance survey has been carried out along the site surroundings for better
understanding of the local settings.
M/s. Risk Software Solution Pvt. Ltd. is coming up a multi storied project ‘Hotel Cum
Multiplex’ in Chadrasekharpur in Bhubaneswar, Odisha State. The project envisages
construction of a multi-storied building with LB+UB+G+10 floors over Plot No.-7, Rev Plot
No.65(P), 66(P), 67(P), Khata No. 612 at mouza Chandrasekharpur of Bhubaneswar, Dist –
Khorda, Odisha. Bhubaneswar is the capital city of Odisha. It is a city of Temples, Culture,
Information Technology & Educational hub. The majestic temple of Lord Lingaraj needs no
introduction. Bhubaneswar is one of the planned cities of modern India. The site is around
5 km from centre of Bhubaneswar city, the state capital. The site is well connected with road.
The nearest railway station is Bhubaneswar on SE Railway which is around 9 km. from the
site and the nearest airport is Bhubaneswar which is at distance of 10 Km. The proposed
Hotel Multiplex Building Project, you live here, breathe here, fell happy and enjoy your life
to the fullest. With its beauty, design, and openness and of course living space that gives
your life an elegant class of sophisticated and classic living. The project site is such a
beautiful place that fulfills your every dream and desire. Being located in the most spacious
township of Bhubaneswar, it truly elevated its image beyond the height of glory and pride. It
is an ideal combination of a great location and world class amenities.
22
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 23
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 24
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 25
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
TOPO MAP SHOWING 10 KM BUFFER AREA FROM THE PROPOSED PROJECT SITE
Page 26
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
VICINITY MAP SHOWING 10 KM BUFFER AREA FROM THE PROPOSED PROJECT SITE
Page 27
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
ANNEXURE – IV
DRAINAGE PATTERN OF THE STUDY AREA WITH IN 10 KM RADIUS FROM
PROJECT SITE
Page 28
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
M/s. Risk Software Solution Pvt. Ltd. is coming up a multi storied project ‘Hotel Cum
Multiplex’ in Mouza- Chadrasekharpur, Bhubaneswar, Odisha consisting of 87 shops
and 95 suites/rooms, multiplex in LB+UB+G+10 floors of the proposed commercial/
residential multiplex along with party lawn, party hall, lobby, food court, games area,
ATM, Swimming pool, Spa, Salon, Gym, Restaurants, club and other common facilities.
The Building utilities have been planned in accordance with Standard practice
followed in such types of Proposed Commercial Areas at Bhubaneswar. It is intended to
present in the following, an overall view of the design criteria adopted for the MEP
Services.
This report spells out the brief design concepts to be adopted in this project for various
services relating to Ventilation, Plumbing, Water supply, Fire, Electrical (Internal,
External, including Substation) etc. as follows:
1.0 Ventilation System
2.0 Electrical System
3.0 Plumbing/Sanitary/Water & Waste Water Treatment
4.0 Fire Protection & Sprinkler System.
Page 29
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
AREA STATEMENT
The total plot area of project is estimated 8,096.26 Sqmt m2 (or 2.0 acres). The detailed area
statement is provided below in Table 1
Table 1: Area Statement
Page 30
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
POPULATION DENSITY
WATER REQUIREMENT
During operation phase, water supply will be through borewells. The total water requirement is
approx. 321 KLD, out of which total domestic water requirement is 181 KLD. The fresh water
requirement is approx. 181 KLD. The daily water requirement calculation is given below in Table 3:
Page 31
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 32
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
100%
Horticulture 52 KLD
52 KLD Treated
Waste
Water
HVAC 37 KLD
158 KLD
37 KLD
5 KLD
For other
Miscellaneous
Purposes 18 KLD
18 KLD
Page 33
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Total Water
Recycled water
Requirement- 321
Requirement- 140
KLD
KLD
100%
HVAC 37 KLD
37 KLD Treated
Waste
Water
For DG Set Cooling
5 KLD
158 KLD
5 KLD
18 KLD
Page 34
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Characteristics of Sewage
Page 35
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Moving bed bio-film reactor technology is based on the principle of attached growth process. Raw
sewage will be collected under gravity into the equalization tank after allowing to pass through the
bar screen. Screens will be provided in screen chambers and it will be manually cleaned by going
down to a platform. The bar screen, by removing coarse solids from the sewage help in protecting
the raw sewage pump. Fully submersible centrifugal non-clog sewage handling pump will be
provided in the collection cum equalization tank to pump the collected Sludge to the next MBBR
tanks. Automatic level controller will be provided in the tank to turn the pump off at the low water
level in the tank and to start the pump when water level is high automatically. Air will be introduced
in this tank to prevent any potential foul smell problem & to provide the mixing of wastewater to
avoid the sedimentation of solids in this tank. Air Grid used for aeration purpose will be non-clog.
The sewage collected in equalization tank is pumped the moving bed bioreactor. There will be two
nos. of bioreactors in series for the efficient working and removal of BODs for the required retention
time. The process inside the moving bed bioreactors consists of adding small cylindrical-shaped
polyethylene/polypropylene carrier elements in aerated basins to support bio-film growth. The small
cylinders are provided with a cross inside the cylinder and longitudinal fins on the outside. The
biofilm carriers are maintained in the reactor by the use of a perforated plate with appropriate slot at
the tank outlet. Air agitation or mixers are applied in a manner to continuously circulate the packing.
The packing may fill 25 to 50 percent of the tank volume. Specific surface area of the packing is
about 450- 500m2/m3 of bulk packing volume. The sludge from first bioreactor flows by gravity
through the perforated plate/mesh to the next bioreactor kept in series. Inside the bioreactors, aerobic
bacteria grow in an attached growth from around the moving plastic media inside the reactors. The
bacteria have to reduce BOD & COD of Sludge in the presence of oxygen provided through the air
Page 36
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
grids located at the bottom of the reactors. The Process does not require any return activated sludge
flow or backwashing. From the bio-reactors, the effluent passes by gravity into the clarifier (Tube
Settling Tank). Clarifier will be a hopper bottom sedimentation tank provided with appropriate size
PVC tube deck media. The suspended solids will settle at the bottom of the tank & clear supernatant
will overflow to filter feed tank through outlet launder. The collected sludge at bottom will be
transferred through pumps to sludge holding tank.
The clear supernatant after clarifier will be collected in to filter feed tank. This tank will act as
housing tank for filter feed pumps. The clarified & dis-infected water will be then fed to filtration
unit.
Filtration unit consisting of Dual Media sand filter, activated carbon filter and ultra-filtration system
(optional) will remove the residual impurities such as odor/color, suspended solids, BOD/COD. The
treated water after the filtration unit will be collected in Irrigation cum Flushing water storage tank
from where it is transferred to flushing water tank at terrace & Irrigation System.
Excess sludge from the bottom of the settling tank will be removed and transferred to sludge holding
tank. Air grid will be provided in this tank to avoid conversion into anaerobic conditions, thickening
of sludge and keep sludge in homogenous condition. The digested & thickened sludge will be further
thickened through Sludge Dewatering System (Filter press with screw pump) and disposed-off
periodically through closed tanker or can be reused as manure.
Page 37
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Solid waste would be generated both during construction as well as during operation phase.
Management plans are prepared for both the phases and are given below
Solid waste expected to be generated during construction phase will comprise of excavated materials,
used bags, bricks, concrete, MS rods, tiles, wood etc. App. 30-40 kg of waste will be generated
during construction phase. Solid waste management plan for construction phase is given below
The excavated material such as topsoil and stones will be stacked for reuse during later
Page 38
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
stages of construction
Excavated top soil will be stored in temporary constructed soil bank and will be reused for
landscaping of the proposed project.
Remaining soil will be utilized for refilling / road work / rising of site level at locations/
selling to outside agency for construction of roads etc.
During the operation phase, estimated quantity of the waste shall be approx. 491 kg per day (@
0.5 kg per capita per day for residents, @ 0.15 kg per capita per day for the visitor, 0.25 kg per
capita per day for staff and landscape waste @ 0.2 kg/acre/day).
Following arrangements will be made at the site in accordance to Solid Waste Management
Rules, 2016.
Page 39
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Treatment of waste
Bio-Degradable wastes
1. Bio-degradable waste will be subjected to composting by organic waste converter and
the compost will be used as manure.
2. STP sludge is proposed to be used for horticultural purposes as manure.
3. Horticultural Waste is proposed to be composted and will be used for gardening
purposes.
Recyclable wastes
i. Grass Recycling – The cropped grass will be spread on the green area. It will act as
manure after decomposition.
ii. Recyclable wastes like paper, plastic, metals etc. will be sold off to recyclables.
iii. Used oil from DG Sets will be sold to authorized vendors.
iv. E-waste will be sold to authorized vendors.
Non-Recyclable/Inert wastes
i. Inert waste will be disposed off through local agencies in area responsible for waste
management.
Disposal
Recyclable and non-recyclable wastes will be disposed through Govt. approved agency.
Hence, the Municipal Solid Waste Management will be conducted as per the guidelines
of Solid Waste Management Rules, 2016. A Solid waste management Scheme is depicted
in the following figure for the proposed Project.
Page 40
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
GREEN AREA
Total area measuring 1619.253 sq m i.e. 20 % of the total plot area is proposed to be put under green
cover.
Evergreen trees, ornamental trees, ornamental shrubs are proposed to be planted in green area. Only
native species and some ornamental species with less water requirement will be planted within the
site. Proper aftercare and monitoring of developed green belt will be done. Details of green area are
given in table. Green area will be developed as per CPCB guideline on Green belt, 2000 and urban
standard plantation norms.
Page 41
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Particulars Details
Plantation Area 1619.253
As Per MoEF&CC Guidelines One tree per 80 sqmt. of total area out of which
minimum 50 % to be in the category of evergreen
trees.
Trees Required 8096.26 sq m/80= 102 Trees
Number of Trees Proposed To Be 102
Planted
All the developments are associated with the pollution of one or more environmental component.
Plants are the natural sink of that pollution. Plants help in abatement of the pollution and restore the
degraded environment. Green belt lowers down the air pollution by providing a surface to settle
down or by absorbing the pollutants, attenuate noise level and uses the waste water. Phyto-
remediation is one of the most successful available technologies of restoring the degraded
environment. Green cover will comprise of peripheral green belt, terrace garden, small lawns and
planters. Green belt will be proper maintained and monitored. Species which can be planted at the
site is given in the Table 16.
Page 42
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
CONSTRUCTION MATERIAL
The basic building materials for the construction of the proposed development are cement, sand
stone chip, brick and steel as reinforcement. Through it is too early for estimation of
consumption of building materials in this stage, but a sincere attempt has been made for
preliminary assessment for such consumption; which is presented below.
Consumption of different building materials is assessed as follow:
Item Quantity
Bricks 70,50,000 nos.
Sand 25,800 cum
Stone chips 10,085 cum
Cement 40,200 qntl
Steel 1000 MT
Tile 2,20,600 sft
POWER REQUIREMENT
Power requirement for the project is approx. 1000 KW. 2 nos. transformers of 750 kVA each will be
provided at the site. Source of power will be OSEB. 2 nos. D.G. sets of total capacity 820 kVA
(1 X 500 + 1 X 320 kVA) will be provided for power back up. These sets will be operated through an
‘Auto start, auto load management and auto stop PLC panel and be able to take care of the part load
Page 43
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
conditions depending upon the occupancy and ambient conditions. The DG sets will be located at
service yard outside the building. DG sets are provided with the acoustic enclosures and are open to
air. Stacks will be provided with DG sets so as emissions can be discharged at app. 5 m above the
terrace level as per CPCB norms.
Source Of Power:
The overall maximum demand is approximately 1000 KW at power factor 0.9. It is proposed to
have Grid supply at 33KV from Electricity Supply Company. Supply to the project shall be
brought through Overhead /underground, 33 KV, HT Cables and shall be terminated to the
33 KV H.T metering cum switchgear panel located in the HT Panel room at ground floor near
main entrance.
The water requirement for the proposed project can be divided into two stages:
i) Construction Stage
ii) Operational Stage
It is difficult to assess the daily water requirement of the project construction purpose, as water is
required for a wide range of construction activities in varied quantities. However, for major
construction activities daily requirement will be varies from 20 m3 (average) & 50 m3 (peak
demand) per day. Water consumption for the nonresident labourers will be 60 x @30lpcd = 1800
liters and during peak time 2700 liters. 40 labourers/persons on an average will be residing at the
project site. Considering per capita water requirement as 70 liters per day for their household
activities, daily water requirement under this head will be 2800 liters. Water requirement for dust
suppression which will be about 5 KLD (Avg.) and 8 KLD (Peak).
During construction, required water will be sourced from tankers hired from safe areas / bore
wells.
Page 44
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
WATER TREATMENT:
The following water filtration & bacteriological treatment is proposed to handle parameters
in accordance to that for potable domestic water supply.
i. Filtration: Pressurized through dual media pressure sand filters/Activated carbon filter
The internal traffic generated by visitors shall be regulated and managed through well laid road
and parking system in the multiplex. A car parking of capacity 230 vehicles will provided.
The road system has been designed in accordance with the CBDA, NBC codes/regulations.
Pavement shall be designed in accordance with the IRC / MORTH standards and codes.
Necessary signs and road furniture shall be provided to ensure regulation and smooth flow of
traffic.
Parking space has been provided at Basement Floor area. Provision is made for reserved parking
areas for use by physically challenged persons. The requirement of parking area is provided as
per BDA guidelines. The vehicular traffic movement within the multiplex will be such that it will
not disturb the landscaped areas and organized open spaces. Parking lots are properly demarcated
for two wheelers and four wheelers.
The basement floor parking area allocated as per layout plan is 9952.19 sqmt. Total No. of car
capacity in the parking space provided is 230 nos.
Page 45
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 46
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
CHAPTER-3
ENVIRONMENT MANAGEMENT PLAN
Page 47
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Planning: This includes identification of environmental impacts, legal requirements and setting
environmental objectives.
Implementation: This comprises of resources available to the developers, accountability of
contractors, training of operational staff associated with environmental control facilities and
documentation of measures to be taken.
Measurement & Evaluation: This includes monitoring, counteractive actions and record keeping.
It is suggested that as part of the EMP, a monitoring committee would be formed by M/s Risk
Software Solution Pvt. Ltd. comprising of the site in-charge/coordinator, environmental group
representative and project implementation team representative. The committee’s role would be to
ensure proper operation and management of the EMP including the regulatory compliance.
The components of the environmental management plan, potential impacts arising, out of the project
and remediation measures are summarized below
SUMMARY OF POTENTIAL IMPACTS AND REMEDIAL MEASURES
Sl.No. Environmental Potential Potential Control through Impact Remedial
Components Impacts Source of EMP & Design Evaluation Measures
Impact
1. Ground Water Ground Water Construction Waste water No significant Waste water
Phase will be managed impact as arising from the
Quality Contamination to maximum majority of project is to be
Waste water extent and to labors would disposed
generated from maintain be locally conforming to
temporary labor hygienic deployed CPCB by septic
tents. condition at site tanks/soak pits.
2. Ground Water Ground Water Construction No water No impact Treated water
Phase ponding will be will be supplied
Quality Depletion allowed at site from tankers for
No impact as meeting
ground water construction water
will not be used requirement
Page 48
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Permission
should be taken
from CGWA prior
usage of ground
water
3. Surface Water Surface water Construction Water & Measures will Silt traps and
Quality contamination Phase Sewage be taken to diversion ditches
management will restrict the will be constructed
Contaminated be carried out at run-off from to control surface
surface runoff the site to control site. run-off during site
from site during water pollution development.
construction
activity. Curing will be
done by spraying
water to reduce
runoff.
Toilets will be
provided at the site
to prevent open
defecation and the
sewage will be
disposed through
septic tanks and
soak pits.
Page 49
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
nearby
construction site
for construction
phase.
Regular
maintenance and
servicing of
vehicles.
Developing
Green belt
Page 50
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Provision of ear
muffs to workers
Traffic
Management at
site to prevent
honking
Use of machinery
of modern make,
meeting the noise
standards
Honking will be
prohibited in the
premises
Page 51
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Used oil
generated will be
disposed as per
norms to
authorized vendors
Negligible
impact.
Page 52
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Employment
preferably to be
given to local
people
Implementation
of EMP to prevent
Increased
employment
opportunities
Informatory &
directive Sign
boards will be
provided
Provision of
pedestrian path to
encourage parking
Page 53
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 54
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Greenbelt development
Diesel Generator Set Emission Control Measures
Adequate stack height will be maintained to disperse the air pollutants generated from the operation
of DG set to dilute the pollutants concentration within the immediate vicinity.
Vehicle Emission Controls and Alternatives
During construction, vehicles will be properly maintained to reduce emission.
Footpaths and Pedestrian ways: Adequate footpaths and pedestrian ways would be provided at the
site to encourage non-polluting methods of transportation.
Greenbelt Development
Increased vegetation in the form of greenbelt is one of the preferred methods to mitigate air and
noise pollution. Plants serve as a sink for pollutants, act as a barrier to break the wind speed as well
as allow the dust and other particulates to settle on the leaves. It also helps to reduce the noise level
at large extent.
3.2.2 EMP FOR NOISE ENVIRONMENT
Construction Phase
To mitigate the impacts of noise from construction equipment during the construction phase on the
site, the following measures are recommended for implementation.
Time of Operation: Noisy construction equipment would not be allowed to use at night time.
Job Rotation and Hearing Protection: Workers employed in high noise areas will be employed on
shift basis. Hearing protection such as earplugs/muffs will be provided to those working very close to
the noise generating machinery.
Operation Phase
To mitigate the impacts of noise from diesel generator set during operational phase, the following
measures are recommended:
Adoption of Noise emission control technologies
Greenbelt development
Page 55
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
A detailed storm water management plan will be developed which will consider the possible impacts
from above sources. The plan will incorporate best management practices which will include
following:
Regular inspection and cleaning of storm drains
Clarifiers or oil/separators will be installed in all the parking areas. Oil / grease separators installed
around parking areas and garages will be sized according to peak flow guidelines. Both clarifiers and
oil/water separators will be periodically pumped in order to keep discharges within limits
Covered waste storage areas
Avoid application of pesticides and herbicides before wet season
Conducting routine inspection to ensure cleanliness
Provision of slit traps in storm water drains
Good housekeeping in the above areas
Minimizing Water Consumption
Consumption of fresh water will be minimized by combination of water saving devices and other
domestic water conservation measures. The following section discusses the specific measures, which
shall be implemented:
Consumption/Usage
Use of water efficient plumbing fixtures (dual flushing cisterns, low flow showers, pressure taps
and
faucets). Water efficient plumbing fixtures uses less water with no marked reduction in quality and
service
Leak detection and repair techniques.
Meter water usage: Implies measurement and verification methods.
Monitoring of water uses is a precursor for management.
Horticulture
Usage of STP treated water for horticulture
Promoting Reuse of Water after Treatment
Quantity of sewage generated during operational phase will be app. 181 KLD. Sewage will be
treated through sewage treatment plant of capacity 200 KLD. STP will be provided with MBBR
technology. The treated sewage will be completely re-used for flushing (46 KLD), miscellaneous
uses (18 KLD), HVAC cooling (37 KLD) and greenbelt development (52 KLD). Only 52 KLD
treated water will be excess during monsoon season which may be given to nearby construction sites
or discharged into sewer.
Page 57
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 58
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 59
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Management
During construction stage only local labour will be hired for construction purpose which will provide
employment to local people. Environmental management plan was implemented at the site which
prevented the environmental pollutionin the area and problems to the people in the project site
surroundings.
During operation phase, environment management plan will be implemented to manage sewage,
storm water, emissions and waste from the site. Thus there are no impacts due to the project on
socio-economy. Further the project is one of the best working spaces in the city.
Page 60
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
planting trees
Page 61
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
* Environment monitoring to be carried out twice in year so recurring cost per annum is double that of
onetime cost of environmental monitoring.
Page 62
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
CHAPTER-4
ENERGY CONSERVATION
The buildings shall be designed to achieve maximum solar gain in winter and minimize in
summer combines three strategies via orientation, glazing and thermal mass.
ORIENTATION
Orientation refers to the location of a building and direction to which a building point, crucial for
determining the amount of sun rays a building receives.
1. Surfaces facing south receive sun round the year. The dominant direction of the sun is from
the South, especially in winter. For this reason, solar panels and windows that will capture solar
warming in winter will face as close to South as possible. Solar receipts start to fall noticeably
outside the band South-Southeast to South-Southwest. Surfaces facing Southeast or Southwest
receive 10% less solar energy during the year than surfaces facing due south direction.
The winter sun is low, the summer sun is high. Vertical South facing windows work best for
maximizing solar heating in the winter as they capture the low winter sun.
The high summer sun is a blessing when if comes to designing shading for vertical windows.
Only a small overhang is needed to completely shade a vertical South facing windows in
summer. They receive no direct sun in winter, but they fully face the low evening and morning
sun in summer. West facing rooms are particularly prone to overheating and will need curtains or
shades.
A well functioning eco building will have glazing as possible in vertical windows facing between
South East to South West and as few windows as possible facing North East through to North
West.
GLAZING
Structural glazing (double glazing) to the extent of 30% is used for the facade with the u-value of
3.3 W/ sqm oc and relative heat gain of 257 W/ sqm.
Plain float glass is used for windows. Venetian blinds / frosted stickers are used to suppress full
light / sunrays penetration.
Air Leakage for glazed swinging entrance door will be designed to ensure that the air leakage
does not exceed to 2.0 l/s- m2.
Page 63
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
INSULATION
Roofs are provided with insulation suitable to achieve a maximum of U-factor of overall
assembly of 0.409 W/ m2- oC and minimum R-value of insulation alone of 2.1 m2- oC /W. In
accordance with the climatic zone which is warm and humid.
EXTERIOR FINISH
INTERIORS
Interiors provide filtered sun light, flow of air and visual effects.
Interior partition is done using eco-friendly Autoclaved Aerated Concrete Panels using fly ash
and cement. The product serves as an insulator and acoustic dampener.
DESIGN ASPECTS
The design of the various buildings has taken into consideration the following aspects;
Orientation of the buildings utilizes east lighting and minimal use of west lighting.
North and South of the buildings are provided with good number of windows.
To avoid direct west sun shading devices are provided in the building such as pergolas,
louvers, sunshades and roof over hands.
Stacking of the building helps to create shades on terraces.
Single door corridors to allow lighting.
Providing Open to sky areas to allow light and air.
Adequate set back around the buildings to allow access for natural light and wind.
Page 64
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
(2) The passive protection measures and Passive solar features as described
below:
Page 65
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
CHAPTER-5
RAINWATER HARVESTING
Storm water drainage system will be provided at project site for channelizing storm water and
prevents local flooding. Covered storm water drains will be provided at the site for carrying the storm
water. Storm water from site will be collected and recharged to ground through RWH pits. RWH pits
are designed for peak hourly rainfall for Bhubaneswar, i.e. 10.1 cm. Project site lies in the
Chandrashekhar Mouza. Ground water level in project area is >10.64 m bgl. Hydrologically water
bearing formation in the project area is sand, pebble, gravel etc. in nature. Potential for ground water
recharge is good in area. Stage of ground water develop in the block is 52.11% and falls under safe
category as per CGWB assessment. Project site lies in safe zone but recharging of storm water will
help in flooding during monsoon and also replenishing the ground water aquifers.
Rainwater harvesting is the process of collection and storage of rain. The stored water can be used or
recharged to ground water system. Ground Water recharging is a process whereby ground water
resource is being augmented by artificial means. There are various methods or techniques of ground
water recharging suitable to different hydrogeological conditions.
Rainwater available from the entire project area will be collected and recharged to ground water
system. Depending upon the quality of available rainwater, the following methods will be followed
for recharging.
1. Rainwater to be generated from the roof top areas of the project building will be recharged to
deeper ground water system through injection well at the centre of a filtration cum storage
chamber (Recharging Structure).
2. Rainwater available from the paved and plantation area will be recharged to shallow aquifer
through recharge pits
Page 66
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Rainwater generated from the roofs of the building will be channelized through PVC Pipe which
will be connected to the recharging structure. Rainwater falling on paved, plantation and other area
will be channelized through open/ closed drain to recharge pits to recharge the shallow aquifers.
The volume of rainwater available for harvesting and recharging depends upon two factors i.e.
volume of rainfall in the region and the surface receiving rainfall both its nature and area.
The area receives maximum rainfall during 7 months i.e. May to November. The average annual
rainfall ( 2004-2015) is 1447 mm. The distribution of rainfall over the months is graphically shown
in figures nos. 8.
Year/M Jan Feb M Apr Ma Jun July Aug Sept Oct Nov Dec Total
onth ar y
2004 0 0 0 40 27 124 273 238.3 144.2 221 0 0 1067.5
Page 67
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Av. 5.3 18. 12. 30.5 76.1 177. 323.7 309.6 329.4 144. 16. 4.3 1447.3
5 7 1 0 2
300
250
Rainfall in mm
200
150
100
50
0
J F M A M J J A S O N D
Month
1200
1000
800
600
400
200
0
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Year
Page 68
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
The project spreads over an area of 8096.268 sq.m. Out of the total area roof-top area constitutes
4262.99 sq.m, paved area is 2214.025 sq.m and plantation area is 1619.253 sq.m. Roof top area has
good potential for generation of rainwater which will be available for recharging.
Volume available for harvesting (annual)= Rainfall (m) x Area ( m2)X Runoff co-efficient
The area receives average annual rainfall of 1447 mm (last 12 yrs average). Rainfall available during
monsoon months i.e. May to November will only generate run off and available for harvesting and
recharging. Rainfall during these months is 1360mm.
Again 100% of 1360 mm rainfall will not be available for harvesting as some portion of it will be
lost. This percentage will vary from areas to areas. On the basis of past experience on similar
projects, 90% of it will be taken for roof-top area, 50% for paved and 20% for plantation area. This
percentage of rainfall will be multiplied with the area which will give net water available for
harvesting.
The table no. below shows the volume of rainwater to be generated annually from different area.
annually
Page 69
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
On analyzing the data available and disposition of aquifer system it is proposed that injection well
would be the most suitable recharging structure for this area. An injection well will be constructed
within a storage cum filtration chamber.
An injection well will be constructed and its depth will be around 100m bgl or will be decided during
drilling of the borewell. 4” (102mm) dia. PVC pipe will be lowered in a 9” dia. drilled borehole. The
area around the pipe will be filled up with gravel. Aquifer zones will be tapped by placing 4” dia.
slotted pipe. After construction of the injection well, it was developed with air compressor to clear
the well of all suspended matter.
Filtration/Storage Chamber
A storage/filtration chamber will be constructed around the injection well. The dimension of the
trench is 3.0 m x 3.0 m x 3.0 m. assuming maximum rainfall intensity of 25mm/hr and intake
capacity of injection well to 2.0 lps. The wall of the trench is made of RBC structure as per the
design shown in fig. no.4. The chamber is filled with filtering material i.e. gravel and medium to fine
sand. The chamber is connected to the roof-tops through PVC Pipe. The approximate design of the
recharge structure is shown in fig.11.
On the basis of the volume of rainwater available during maximum intensity of 25mm/hr, it is
proposed to construct 2 nos. of recharging structures. The proposed location of the structures is
shown in the layout plan of the project.
Rainwater being generated from the paved, plantation and other area will be recharged to
shallow/phreatic aquifer system. Since the area is underlain by sandy formation, recharge pits/shafts
will be most suitable recharging structure. The recharge shafts is a vertical excavation through the
earth connecting the water table. The shafts may be either circular or rectangular, lined and with
naked bottom touching at least water table. It is proposed to construct 3 nos.of recharge pits/shafts
with 2.0m(long)x2.0m(width)x3.0m (deep). The bottom 0.5m of the shaft will be filled with coarse
Page 70
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
sand. Surface runoff generated from paved, plantation and other area will be channelized through
drains/covered to the recharge shafts. De-silting pits of small dimension will be constructed at
regular intervals within the drains to arrest silts if any.
Page 71
Hotel-cum- Multiplex Building Project
At Mouza Chandrasekharpur, Bhubaneswar,Dist-Khorda
Page 72