.0 Inspection of Input Materials
.0 Inspection of Input Materials
All the remaining input materials are being inspected by Area Inspector of
DGQA.
MOD vide Order No. 16(2) /2004/ D(QA) dated 31 st March, 2005 has directed
that DGQA shall not inspect input material, including raw material, required by
the manufacturers in the case of Ordnance Factories & DPSU. However, DGQA
will continue to do Quality Audit and surveillance and the manufacturer shall be
duty bound to furnish all the test records and record of other quality checks
carried out by the manufacturer for inspection to the DGQA. Further DGQA
shall not vet indents from OFB & Sample rooms maintained by DGQA shall be
wound up. MOD has also issued clarification vide Order No. 16(2)/04/D (QA)
dated 15th June, 2005 which are relevant for implementing the orders.
1.2 Accordingly, the SOP for input material inspection to be carried out by
Ordnance Factory concerned is enumerated in succeeding paras.
1
1. Self- Certification Category:
This status may be awarded to the firms at the discretion of GM for the item
fulfilling following criteria:
No rejection found in past three years supplies for the particular item.
The firm should have executed minimum three supply orders during past three
years.
Firm is ISO 9001:2000 certified.
Firm is of national and/or International repute i.e. firm must have supplied
/exported their goods to reputed firms.
Turn over should be more than Rs. 2 Crore.
The status of self-certification can be granted only when Sr. GM/ GM is fully
satisfied regarding quality of stores of the Firm. The responsibility for accepting
items on self-certification will be that of Sr. GM/GM and Addl. GM/QC.
2. Inspection at Firm Premises Category:
This status may be awarded to the firms at the discretion of GM for the item
fulfilling following criterion:
Rejection found in past three years supplies for the particular item does not
exceed 5% of total supplies made.
The firm should have executed minimum two supply orders during past three
years.
3. Inspection on Receipt Category:
This status shall be awarded to the firms for the item not falling in above two
categories. In other words Firms with following conditions will be in this category.
Rejection found in past three years supplies for the particular item exceeds 5%
of total supplies made.
New source / Executing Development Order.
Supplying non-critical stores.
The above categorization shall be proposed by a sub-committee and approved by
GM.
2
DETAILED INSPECTION PROCEDURE FOR INPUT
MATERIAL INSPECTION
The Firm shall give Warranty/ Guarantee, pre-inspection report & Test
certificate of Lot tendered and dispatch the stores to consignee end
factory.
The Firm shall forward its Bills for Payment with pre-inspection
report, Test Certificate, a covering declaration as per format given
below and Warranty / Guarantee certificates in place of I-Note and
other necessary documents as per existing payment procedure.
3
1.3 ACTION BY ACCOUNTS OFFICE
We hereby declare that the products …………quantity ………… supplied by our company
…………vide challan No. ………… as per the S.O. no & date are meeting all
requirements laid down in the specification. We here by undertake to replace whole and /
or part consignment as the case may be in the event of its not meeting the requirements /
standards laid down in the supply order.
3. Criterion of inspection
Relevant Product Specification & Drawings
The samples drawal system i.e. whether it will be drawn by
representative of consignee factory or by representative of nearest
available Ordnance factory.
Material or other Tests to be conducted according to the conditions
of Supply Order i.e. NABL accredited LAB where tests will be
conducted.
To avoid delays in testing the samples, Factory will enter in to Rate
contract in advance with NABL accredited Labs wherever
warranted.
Procedure of selection of proof sample.
4. S.O shall clearly stipulate that “GM reserves the right to change the
inspection agency to suit the convenience of the Factory and in the
interest of State”.
5. The copy of Supply orders will be endorsed to respective SQAOs of the
receiving factory and concerned AHSP.
5
2.2 The DGM/Standard Cell on receipt of copy of Supply Order shall
prepare detailed Inspection Criteria and monitoring instructions and
issue to Inspecting Officer.
2.3 The Firm shall intimate to Inspection Officer with a copy to Sample
drawal factory regarding readiness of material for inspection with
following details:
1. Supply order No. & Date
2. Date of readiness of material
3. Item description and item code as per supply order
4. Quantity being tendered with pre-inspection report
5. Quantity within Delivery schedule or not. If not Firm should take DP
Extension from Purchase Officer and submit the copy of DP
amendment letter / quote the reference to the Inspection Officer.
2.4 The Inspection Officer shall depute sample drawal / Inspection team to
the Firm on receipt of inspection call letter from Firm.
The Ordnance Factory representatives shall visit the Firm and take following
actions:
Every factory shall provide individual & distinctive metal seals to
the inspectors considered for the work of inspection / drawal of
samples at Firm’s premises. The Ordnance Factory representative
(inspector) visiting the firm shall carry his assigned metal seal.
Draw requisite number of random samples as per relevant standard
& sampling Plan and seal & bond the bulk.
6
Sealing Procedure for samples: The samples drawn shall be
sealed by both Firm and the OF representative visiting Firm.
Separate sealed packet shall be made if samples are to be handed
over to NABL Accredited Lab for Testing by Quality control
Officer of Near by Ordnance Factory.
7
Submit samples duly sealed by Firm and himself to designated QC
Officer of nearby Factory in case the samples are required to be sent
to NABL Accredited Lab for Testing by designated QC officer.
2.5.2 Action by designated QC Officer of Near-by Ordnance Factory
8
2.5.3 ACTION BY INSPECTION OFFICER
9
The computerized record of person being deputed should be
maintained by the inspection Officer with Supply Order No., Firms
name, Item code, Item Nomenclature, quantity etc.
The firm shall dispatch the accepted stores with seal intact duly
stamped with acceptance mark. The Firm shall forward its Bills for Payment
with I-Note and other documents as per procedure in vogue.
2.7 In case the samples tendered by firm are found rejected, the bulk of the
same should be stamped rejected with rejection stamp suitably to avoid
mixing of such lots in future supply. The firm will be asked to tender fresh lot
as per procedure in vogue.
11
Relevant Product Specification & Drawings
Material or other Tests to be conducted according to the conditions
of Supply Order i.e. NABL accredited LAB where tests will be
conducted.
To avoid delays in testing the samples, Factory will enter in to Rate
contract in advance with NABL accredited Labs wherever
warranted.
Procedure of selection of proof sample (if required).
4. S.O shall clearly stipulate that “GM reserves the right to change the
inspection agency to suit the convenience of the Factory and in the
interest of State”.
5. The copy of Supply orders will be endorsed to respective SQAOs of the
receiving factory and concerned AHSP.
3.5 In case the lot tendered by firm is found rejected, the bulk of the same
should be stamped rejected with rejection stamp suitably to avoid
mixing of such lots in future supply. The firm will be asked to tender
fresh lot as per procedure in vogue.
4.2 The inspection note for inter factory transfers shall be issued by
quality Control Wing of the factory.
4.3 DGQA will issue certificate of having carried out control point
checks and surveillance audit.
13
5.0 Imported Stores:
5.1 The present practice of PDI by DGQA for items being procured
through orders placed by DOD including those under TOT shall
continue.
5.2 As far as spares and input material procured directly by OFB, the
responsibility of inspection shall rest with OFs.
6.1 Factory will provide test report and other relevant papers on
demand for quality audit by DGQA.
6.2 DGQA will allow use of its lab for testing whenever requested
by OFs.
6.3 Relevant records and tests reports, as may be required, are to be
produced before DGQA at the time of final inspection.
6.4 In case of critical items to be identified mutually by OF and
concerned Controllers/SQAO, selective sampling of input
material collected from consignee end will be done by DGQA
and tested in the facility available with OF or lab of DGQA
without affecting the production schedule. The test results shall
be shared with the concerned OF. The frequency of sampling
will be initially decided while identifying the critical items and
frequency will be increased/decreased depending on the
performance. In case of difference of opinion in identification of
critical items and frequency of sampling, same shall be referred
to OFB whose decision in this regard shall be final.
14
6.5 DGQA shall continue to perform control point checks and
surveillance audit as being carried out at present.
15
11.0 Standard Cell: A cell shall be created in all Ordnance factories under the
overall control of AGM/QC and headed by DGM/standards, which shall
perform following functions:
12.0 Deviations:
17
In the past system was existing where deviation were granted in
following categories:
Approved by AGM/QC.
20
12.5 DEVIATION DISCOUNT FORM
12.5.1 PART I
DO/MM
12.5.2 PART II
Qty. acceptable :
Reference under which firm has accepted Deviation discount :
Remarks :
Date :
13.0 Dispute:
In case of dispute between Firm and inspection Officer, the case shall be
referred to General Manager for appropriate test and decision.
22