Er Aditya Joshi CV

Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

CURRICULUM VITAE

Aditya Joshi
Structural Engineer
Memberships:
1. Indian road congress (IRC) – Life Member eLM-101115
2. Indian Building Congress (IBC) – Life Member ML-8034
3. International Association of Bridge
and Structural Engineering (IABSE) – 437249
4. Association of Consulting Civil Engineers – Member 4835-M
5. Institution of Engineers India (IEI) – AM186400-1

CAREER OBJECTIVE

To utilize my technical skills for achieving the target and developing the best performance in the
organization. I would like to implement my innovative ideas, skills and creativity for accomplishing the
projects.

EXPERIENCE

 Currently Lead Structural Engineer at Brisk Engineering Consultants & Technocrats Pvt.
Ltd., Bhopal since January 2019 to till the date.
 Structural Engineer at Nakshkaar Engineers & Consultant Pvt. Ltd., Bhopal since
December 2017 to December 2018.
 Sole proprietor at MKV Consulting Engineers, Bhopal since June 2016 to till the date.
 Structural Design Engineer at Infrastructure Development Consultant, Bhopal since
May 2017 to July 2017.
 Structural Design Engineer at Simtech Consultants Pvt. Ltd., Bhopal since December 2013
to April 2017.

PROJECT WISE DETAILS WORK EXPERIENCE (DURIING LAST 5 YEARS 8 MONTHS)

LIST OF WORK DONE:


Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
1
Submersible bridge across
Detailed Hydraulic Design,
Popowanti river
Structural Design of
P Simtech
Total length of bridge = MPRRDA, Superstucture and
R Consultant
71.90m Hoshangabad Substructure, Structural
Pvt. Ltd.
O Drawings and Detailed
J (4units of 4cell [email protected]) Estimate
E
C 2 Submersible bridge across
T Anjani River
C Total length of bridge = Simtech
MPRRDA,
O 88.90m Consultant
Hoshangabad
-Do-
M (4units of 4cell box @ 22.2m Pvt. Ltd.
P each) + 2Nos. RCC box type
L abutments)
E 3 Submersible bridge across Oll
T River on imaliya to magardha
E Total length of bridge = Simtech
MPRRDA,
D 71.90m Consultant -Do-
Hoshangabad
(4units of 4cell box @ 17.95m Pvt. Ltd.
each) + 2Nos. RCC box type
abutments)
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
4 Submersible bridge across Oll
River on SH19 to richheda Detailed Hydraulic Design,
Structural Design of
Total length of bridge = Simtech
MPRRDA, Superstucture and
68.62m Consultant
Hoshangabad Substructure, Structural
(5units of 4cell box @ 13.70m Pvt. Ltd.
Drawings and Detailed
each) + 2Nos. RCC box type Estimate
abutments)
5 High level bridge Across
Jorsindhi river
Total length of bridge = 120M
Simtech
(10 spans of 12m each RCC MPRRDA,
Consultant -Do-
solid slab) Alirajpur
Pvt. Ltd.
Pier - RCC Solid circular pier
P Abutment - RCC box type
R abutment
O 6 High level bridge Across Ure
J river
E Total length of bridge = 90M
C (6 spans of 15m each RCC Simtech
MPRRDA,
T solid slab) Consultant -Do-
Alirajpur
C Pvt. Ltd.
Pier - RCC wall type pier
O Abutment - RCC box type
M abutment
P 7 High level bridge Across
L Kasatpani river
E
Total length of bridge = 150M Detailed Hydraulic Design,
T Structural Design of
E (6 spans of 25m each RCC T- Simtech
Beam girder) MPRRDA, Superstucture and
D Consultant
Alirajpur Substructure, Structural
Pier - RCC Solid circular pier Pvt. Ltd.
Drawings and Detailed
with pile foundation Estimate
Abutment - RCC box type
abutment with pile foundation
8 Submersible bridge Across
Doni river
Total length of bridge = 105M
(7 spans of 15m each RCC Simtech
MPRRDA,
solid slab) Consultant -Do-
Alirajpur
Pier - RCC Solid circular pier Pvt. Ltd.
with pile foundation
Abutment - RCC box type
abutment with pile foundation
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
9 High level bridge Across Umda
river
Total length of bridge = 150M Detailed Hydraulic Design,
(6 spans of 25m each RCC T- Structural Design of
Simtech
Beam girder) MPRRDA, Superstucture and
Consultant
Alirajpur Substructure, Structural
Pier - RCC Solid circular pier Pvt. Ltd.
Drawings and Detailed
with pile foundation Estimate
Abutment - RCC box type
abutment with pile foundation
10 High level bridge across
Porkragarha nalla
Total length of bridge = 89.30M Simtech
CGRRDA,
Consultant -Do-
(4units of 5cell box @ 22.30m Jashpur
Pvt. Ltd.
each) + 2Nos. RCC box type
abutments)
11 High level bridge across Lawa
P river
R Total length of bridge = 150M
O (10 spans of 15m each RCC
Simtech
CGRRDA,
J solid slab) Consultant -Do-
Jashpur
E Pvt. Ltd.
Pier - RCC wall type pier
C
T Abutment - RCC box type
abutment
C
12 High level bridge across Lawa
O
river
M Total length of bridge = 105M
P Simtech
(7 spans of 15m each RCC CGRRDA,
L slab)
Consultant
Jashpur
-Do-
E Pvt. Ltd.
Pier - RCC wall type pier
T
Abutment - RCC box type
E abutment
D 13 High level bridge across Ibb
river
Total length of bridge = 105M
Simtech
(7 spans of 15m each RCC CGRRDA,
Consultant -Do-
solid slab) Jashpur
Pvt. Ltd.
Pier - RCC wall type pier
Abutment - RCC box type
abutment
14 High level bridge across Lawa
river
Total length of bridge = 195M
(13 spans of 15m each RCC Simtech
CGRRDA,
solid slab) Consultant -Do-
Jashpur
Pvt. Ltd.
Pier - RCC wall type pier
Abutment - RCC box type
abutment
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
15 High level bridge across
Dubaya Nalla
Detailed Hydraulic Design,
Total length of bridge = 90M
Structural Design of
Simtech
(6 spans of 15m each RCC CGRRDA, Superstucture and
Consultant
solid slab) Balrampur Substructure, Structural
Pvt. Ltd.
Pier - RCC wall type pier Drawings and Detailed
Estimate
Abutment - RCC box type
abutment
16 High level bridge across Maini
river
Total length of bridge = 60M
(4 spans of 15m each RCC Simtech
CGRRDA,
solid slab) Consultant -Do-
Jashpur
P Pvt. Ltd.
R Pier - RCC wall type pier
O Abutment - RCC box type
J abutment
E 17 High level bridge across
C Shobha river
T Total length of bridge = 60M
C Simtech
(4 spans of 15m each RCC CGRRDA,
O Consultant -Do-
solid slab) Jashpur
M Pvt. Ltd.
P Pier - RCC wall type pier
L Abutment - RCC box type
E abutment
T 18 High level bridge across Local
E nalla
D
Total length of bridge = 45M
Simtech
(3 spans of 15m each RCC CGRRDA,
Consultant -Do-
solid slab) Jashpur
Pvt. Ltd.
Pier - RCC wall type pier
Abutment - RCC box type
abutment
19 High level bridge across Moran
river
Total length of bridge = Simtech
158.84M CGRRDA,
Consultant -Do-
(6units of 4cell box @ 26.45m Balrampur
Pvt. Ltd.
each) + 2Nos. RCC box type
abutments)
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
20 High level bridge across
Sonmuth nalla
Detailed Hydraulic Design,
Total length of bridge = 105M
Structural Design of
Simtech
(7 spans of 15m each RCC CGRRDA, Superstucture and
Consultant
solid slab) Jashpur Substructure, Structural
Pvt. Ltd.
Pier - RCC wall type pier Drawings and Detailed
Estimate
Abutment - RCC box type
abutment
21 High level bridge across Local
nalla
Total length of bridge = 30M
Simtech
(1 spans of 30m each RCC T- CGRRDA,
Consultant -Do-
Beam girder) Jashpur
P Pvt. Ltd.
R Pier - RCC wall type pier
O Abutment - RCC box type
J abutment
E 22 High level bridge across
C Deldabba nalla
T Total length of bridge = 60M
C Simtech
O (4 spans of 15m each RCC CGRRDA,
Consultant -Do-
M solid slab) Jashpur
Pvt. Ltd.
P Pier - RCC wall type pier
L
Abutment - RCC box type
E abutment
T
E 23 High level bridge across Moran
D river
Total length of bridge = Simtech
185.31M CGRRDA,
Consultant -Do-
(7units of 4cell box @ 26.45m Jashpur
Pvt. Ltd.
each) + 2Nos. RCC box type
abutments)

24 High level bridge across


Parasdol nalla
Total length of bridge = 84M
Simtech
(7 spans of 12m each RCC CGRRDA,
Consultant -Do-
slab) Balrampur
Pvt. Ltd.
Pier - RCC wall type pier
Abutment - RCC box type
abutment
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
25 High level bridge across Local
nalla
Detailed Hydraulic Design,
Total length of bridge = 60M
Structural Design of
(4 spans of 15m each RCC Simtech
CGRRDA, Superstucture and
slab) Consultant
Jashpur Substructure, Structural
Pvt. Ltd.
Pier - RCC wall type pier Drawings and Detailed
Abutment - RCC box type Estimate
abutment
26 High level bridge across Local
nalla
Total length of bridge = 60M
Simtech
(5 spans of 12m each RCC CGRRDA,
Consultant -Do-
slab) Jashpur
Pvt. Ltd.
P Pier - RCC wall type pier
R Abutment - RCC box type
O abutment
J 27 High level bridge across Jhok
E nalla
C Total length of bridge = 48M
T Simtech
C (4 spans of 12m each RCC CGRRDA,
slab) Consultant -Do-
O Surajpur
Pvt. Ltd.
M Pier - RCC wall type pier
P Abutment - RCC box type
L abutment
E
28 High level bridge across
T
Dhurkhas nalla
E
D Total length of bridge = 36M
Simtech
(3 spans of 12m each RCC CGRRDA,
Consultant -Do-
slab) Surajpur
Pvt. Ltd.
Pier - RCC wall type pier
Abutment - RCC box type
abutment
29 High level bridge across
Babhana nalla
Total length of bridge = 96M
Simtech
(8 spans of 12m each RCC CGRRDA,
Consultant -Do-
slab) Surajpur
Pvt. Ltd.
Pier - RCC wall type pier
Abutment - RCC box type
abutment
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
30 High level bridge across Balsota
river
Detailed Hydraulic Design,
Total length of bridge = 60M Structural Design of
Simtech
(6 spans of 10m each RCC CGRRDA, Superstucture and
Consultant
slab) Balrampur Substructure, Structural
Pvt. Ltd.
Pier - RCC wall type pier Drawings and Detailed
Estimate
Abutment - RCC box type
abutment
31 High level bridge across Bahera
nalla
Total length of bridge = 72M
Simtech
(6 spans of 12m each RCC CGRRDA,
Consultant -Do-
slab) Balrampur
Pvt. Ltd.
P Pier - RCC wall type pier
R Abutment - RCC box type
O abutment
J 32 Submersible bridge across
E Chamla river Detailed Hydraulic Design,
C
Total length of bridge = 120M Structural Design of
T
Simtech Superstucture and
C (8 spans of 15m each solid MPRRDA,
Consultant Substructure, Structural
O slab) Dhar
Pvt. Ltd. Drawings and Detailed
M Pier- RCC Solid circular pier
Estimate also Preperation
P Abutment- RCC box type of tender documents
L abutment with pile
E
T 33 Submersible bridge across
E Chamla river
D Total length of bridge = 120M
Simtech
(8 spans of 15m each solid MPRRDA,
Consultant -Do-
slab) Dhar
Pvt. Ltd.
Pier- RCC Solid circular pier
Abutment- RCC box type
abutment
34 Submersible bridge across
Chamla river
Total length of bridge = 120M
Simtech
(8 spans of 15m each solid MPRRDA,
Consultant -Do-
slab) Dhar
Pvt. Ltd.
Pier- RCC Solid circular pier
Abutment- RCC box type
abutment with pile
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
35 Submersible bridge across Detailed Hydraulic Design,
Local nalla Structural Design of
Total length of bridge = 72M Simtech Superstucture and
MPRRDA,
(9 spans of 8m each solid slab) Consultant Substructure, Structural
Dhar
Pvt. Ltd. Drawings and Detailed
Pier- RCC wall type pier Estimate also Preperation
Abutment- PCC solid abutment of tender documents
36 Submersible bridge across
Baghedi river
Total length of bridge = 90M
Simtech
(6 spans of 15m each solid MPRRDA,
Consultant -Do-
slab) Dhar
Pvt. Ltd.
Pier- RCC wall type pier
Abutment- RCC box type
abutment
37 High level bridge across Bagli
river
P
R Total length of bridge = 105M
(7 spans of 15m each solid Simtech
O MPRRDA,
slab) Consultant -Do-
J Dhar
Pvt. Ltd.
E Pier- RCC wall type pier
C Abutment- RCC box type
T abutment
C
O 38 Submersible bridge across
Chamla river
M
P Total length of bridge = 150M
L Simtech
(10 spans of 15m each solid MPRRDA,
E Consultant -Do-
slab) Dhar
T Pvt. Ltd.
Pier- RCC Solid circular pier
E
Abutment- RCC box type
D
abutment with pile
39 Submersible bridge across
Petrola river
Total length of bridge = 132M Simtech
MPRRDA,
(11 spans of 12m each solid Consultant -Do-
Dhar
slab) Pvt. Ltd.
Pier- RCC wall type pier
Abutment- PCC solid abutment
40 Submersible bridge across
Local river
Total length of bridge = 75M
Simtech
(5 spans of 15m each solid MPRRDA,
Consultant -Do-
slab) Dhar
Pvt. Ltd.
Pier- RCC Solid circular pier
Abutment- RCC box type
abutment with pile
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
41 High level bridge across Petrola
river Detailed Hydraulic Design,
Structural Design of
Total length of bridge = 72M Simtech Superstucture and
MPRRDA,
(6 spans of 12m each solid Consultant Substructure, Structural
Dhar
slab) Pvt. Ltd. Drawings and Detailed
Pier- RCC wall type pier Estimate also Preperation
Abutment- PCC solid abutment of tender documents
42 Submersible bridge across Man
river
Total length of bridge = 64M Simtech
MPRRDA,
(8 spans of 8m each solid slab) Consultant -Do-
Dhar
Pvt. Ltd.
Pier- RCC wall type pier
Abutment- PCC solid abutment
43 Submersible bridge across Man
river
Total length of bridge = 144M Simtech
MPRRDA,
(12 spans of 12m each solid Consultant -Do-
P Dhar
slab) Pvt. Ltd.
R
Pier- RCC wall type pier
O
J Abutment- PCC solid abutment
E 44 Submersible bridge across Khuj
C river
T
Total length of bridge = 72M Simtech
C MPRRDA,
(9 spans of 8m each solid slab) Consultant -Do-
O Dhar
Pvt. Ltd.
M Pier- RCC wall type pier
P
Abutment- PCC solid abutment
L
E 45 Submersible bridge across
T Pantha river
E Total length of bridge = 70M Simtech
D MPRRDA,
(7 spans of 10m each solid Consultant -Do-
Dhar
slab) Pvt. Ltd.
Pier- RCC wall type pier
Abutment- PCC solid abutment
46 Submersible bridge across Man
river
Total length of bridge = 156M Simtech
MPRRDA,
(13 spans of 12m each solid Consultant -Do-
Dhar
slab) Pvt. Ltd.
Pier- RCC wall type pier
Abutment- PCC solid abutment
47 Submersible bridge across Kully
river
Total length of bridge = 48M Simtech
MPRRDA,
(6 spans of 8m each solid slab) Consultant -Do-
Dhar
Pvt. Ltd.
Pier- RCC wall type pier
Abutment- PCC solid abutment
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
48 High level Bridge across Tondia
Detailed Hydraulic Design,
river on borpend to salbardi at
Structural Design of
RD 1100M
Simtech Superstucture and
Total length of bridge = 150M MPRRDA,
Consultant Substructure, Structural
(10 spans of 15M each solid Betul
Pvt. Ltd. Drawings and Detailed
slab) Pier-
Estimate also Preperation
wall type pier
of tender documents
Abutment- RCC box type
49 High level Bridge across Maru
river on borpend to salbardi at
RD 5000M.
Simtech
Total length of bridge = 105M MPRRDA,
Consultant -Do-
(7 spans of 15M each solid Betul
Pvt. Ltd.
slab)
Pier- wall type pier
Abutment- RCC box type
50 High level Bridge across Maru
P
river on borpend to salbardi at
R
RD 5500M.
O Simtech
Total length of bridge = 120M MPRRDA,
J Consultant -Do-
(8 spans of 15M each solid Betul
E Pvt. Ltd.
slab) Pier- wall
C
type pier
T
Abutment- RCC box type
C
51 High level Bridge across Maru
O
river on borpend to salbardi at
M
RD 9400M.
P Simtech
Total length of bridge = 135M MPRRDA,
L Consultant -Do-
(9 spans of 15M each solid Betul
E Pvt. Ltd.
slab)
T
Pier- wall type pier
E
Abutment- RCC box type
D
52 High level Bridge across Maru
river on borpend to salbardi at
RD 10000M.
Simtech
Total length of bridge = 125M MPRRDA,
Consultant -Do-
(5spans of 25M each RCC T- Betul
Pvt. Ltd.
Beam)
Pier- solid circular pier
Abutment- RCC box type
53 High level Bridge across
Morand river on bijadehi to
dudar at RD 3550M.
Total length of bridge = 175M Simtech
MPRRDA,
(7spans of 25M each RCC T- Consultant -Do-
Betul
Beam Pvt. Ltd.
Pier- solid circular pier with pile
Abutment- RCC box type with
pile
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
54 High level Bridge across
Morand river on bijadehi to
dudar at RD 1100M.Total
Simtech
length of bridge = 200M(8spans MPRRDA,
Consultant -Do-
of 25M each RCC T-Beam ) Betul
Pvt. Ltd.
Pier- solid circular pier with pile
Abutment- RCC box type with
pile
55 High level Bridge across
Detailed Hydraulic Design,
Koyalkhar river on hardadadu
Structural Design of
to unarghat
Simtech Superstucture and
Total length of bridge = 180M MPRRDA,
Consultant Substructure, Structural
(12 spans of 15M each solid Betul
Pvt. Ltd. Drawings and Detailed
slab)
Estimate also Preperation
Pier- wall type pier
of tender documents
Abutment- RCC box type
56 Proof checking of different
Simtech
types of 4 lane and 2 lane MSV
Consultant Proof Checking
Major-Minor bridges of MPRDC International
P Pvt. Ltd.
in Indore and Sagar division.
R 57 Narmada Bridge on 3rd line
O between Budni – Hoshangabad
J stations of Bhopal – Itarsi
E section of Bhopal Division of Detailed structural design
C Simtech
WC Railway RVNL, and drawings of
T Consultant
RCC Wall type Pier & RCC Wall Bhopal Substructure on latest IRS
C Pvt. Ltd.
type Abutment codes
O
M Total length of Bridge =
P 755.89M
L 58 Railway over Bridge on MR-10
E (Dewas-Maksi link road) in b/w
T Rly. KM4/ 19-4/ 21 of Ujjain- Detailed structural design
E Dewas Railway line and drawings of
D superstructure,
Total length of ROB = 345.24M
(excluding RE wall Portion) 4- Simtech substructure and
lane Consultant MPPWD foundation, providing
Pvt. Ltd. superelevation and extra
Superstructure- RCC T-Beam
widening in curve portion.
girder (14Nos. 22M span)
Also design 29M long RCC
Substructure- Solid circular Pier T-Beam Girder Span
RCC Solid Circular Abutment
and Pile Foundation
59 Railway over Bridge at LC no.
29A on Agar - Maksi Road in
Ujjain district Detailed structural design
and drawings of
4-lane bridge Simtech superstructure,
Superstructure- RCC T-Beam Consultant MPPWD substructure and
girder & RCC solid slab Pvt. Ltd. foundation, providing
Substructure- Solid circular Pier superelevation and extra
widening in curve portion.
RCC Solid Circular Abutment
and Pile Foundation
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
60 Railway over Bridge in Lieu of
LC no. 25 (KM.51/22-24) of
Nagda Ujjain section & LC no. 8 Detailed structural design
(on M.G. Rail Section of and drawings of
Fatehabad on Ujjain Badnagar superstructure,
Chintaman road) substructure and
Simtech
foundation, providing
2-lane bridge Consultant MPPWD
superelevation and extra
Superstructure- RCC T-Beam Pvt. Ltd.
widening in curve portion.
girder Also detailing and
Substructure- Solid circular Pier designing of Junction
Portion
RCC Solid Circular Abutment
and Pile Foundation
61 All bridges, culverts in Baretha
Ghoradongri road.
Vinode Detailed structural design
Superstructure up to 15m solid Kumar and drawings of all bridges
P slab Shukla MPRDC and culverts, site visit, get
R Construction approval from Independent
1 major and 18 minor culverts
O Pvt. Ltd. Consultant
J Independent consultant- Theme
E Engineering Services
C 62 High level bridge across
T Ghogara river on Bareli-
C Gaganwada road, Raisen
O Detailed structural design
Total length of Bridge = 210m A&A M/s Punit
M and drawings of
Consulting Chada.
P 7nos. PSC Box girder of 30M Superstructure and
Engineers Bhopal
L each substructure
E Solid circular pier with pile
T box type abutment with pile
E
63 Submersible bridge across Bah
D
river at Jamusar Kalan, Kadyya
Shah Road Amar
A&A
Total length of Bridge = 180m Const.,
Consulting -Do-
Mehsana
8 span of 15m solid slab Engineers
Gujrat
Solid circular pier with pile
Rcc box type abutment with pile
64 Submersible bridge across
Dudhi River on
Mahuakhedakala-Khiranti -
M/s
Tapara to Silwani–Sultanganj. A&A
Santosh
4 spans of 15M each solid slab Consulting -Do-
kumar Rai,
Engineers
solid circular pier with circular Begamganj
footing
rcc box typ abutment
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
65 Submersible bridge across
Hathed river near
Naganiyapura on Dolariya to M/s Balaji Detailed structural design
Naganiyapura road, District: A&A
Construction and drawings of
Hoshangabad Consulting
Co., Superstructure and
3 Cell Box Bridge Engineers
Ghoradongri substructure
Rcc box type abutment

66 Submersible bridge across


Kalisindh river in K.M. 12/10 of
Bercha – Sundarsi – Akodiya
road A&A M/s Indus
4 span of 15M each solid slab Consulting multiventures -Do-
RCC Wall type Pier Engineers Ltd.
Rcc box type abutment with
pile
P
R 67 Submersible bridge across
O Kubja River on Shobhpur – M/s Balaji
J Macha Road, District: A&A
Construction
E Hoshangabad Consulting -Do-
Co.,
C 3 Cell Box Bridge Engineers
Ghoradongri
T
C RCC Box type Abutment
O 68 ROB Bawabiyakala Railway
M Crossing No. 247 from
P Hoshangabad road to
L Bawadiyakala
E M/S Ratan Detailed structural design
T length of ROB = 522.50m A&A Construction and drawings of
E (including 59.9m railway Consulting Company, superstructure,
D portion) Engineers Ankleshwar, substructure and
15M wide 22M long RCC T- Gujrat foundation.
beam
box type abutment with pile
RCC Solid Circular Pier with
Pile
69 ROB at Railway Crossing No.
236 spl. At railway km 813/0-1
between Piparia – Bankhedi
station on Hoshangabad Detailed structural design
Pachamadi Road, distt. and drawings of
Hoshangabad A&A M/s Pranjal superstructure,
Consulting Construction, substructure and
Total length of ROB = 597.24m
Engineers Bhopal foundation, providing
20M Rcc T-Beam girder superelevation and extra
Rcc pier type Abutment widening in curve portion.
Rcc solid circular pier with pile
foundation
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
70 ROB at Railway Crossing No.
220 in km. 712/38-40 on on
Khandawa Itarsi Section Detailed Hydraulic Design,
Banapura S.H.-15 Babri Road, Structural Design of
District- Hoshangabad Superstucture and
A&A M/s Punit
Substructure, Structural
Total length of ROB = 730m Consulting Chada,
Drawings and Detailed
20M Rcc T-Beam girder Engineers Bhopal
Estimate and Planning
Rcc pier type Abutment and designing of Junction
Portion
Rcc solid circular pier with pile
foundation
71 ROB at Railway Crossing No.
238 in km. 820/8-1 on Itarsi
Jabalpur section Piparia Detailed structural design
Jabalpur Road District- and drawings of
Hoshangabad A&A M/s Rajesh superstructure,
Total length of ROB = 730m Consulting Sharma, substructure and
22M Rcc T-Beam girder Engineers Obedullahganj foundation, providing
superelevation and extra
P Rcc pier type Abutment widening in curve portion.
R Rcc solid circular pier with pile
O foundation
J 72 ROB at Railway Crossing no.
E 268 spl. On Sanchi –
C Banskheda Road Detailed structural design
T Bharat Spun
Total length of ROB = 270m A&A and drawings of
C Pipe
18spans of 15m each solid Consulting superstructure,
O Construction
slab Engineers substructure and
M Co., Jabalpur
foundation.
P Rcc box type abutment
L Rcc solid circular pier
E 73 ROB on Gate No. 308B, at
T KM. 976/5.6 on Bina – Kurwai
E Road between Bina – Agasod
D Detailed structural design
section and drawings of
Total length of ROB = A&A M/s Indus superstructure,
729.14m Consulting multiventures substructure and
22M Rcc T-Beam girder Engineers Ltd., Bhopal foundation, providing
Rcc pier type Abutment with superelevation and extra
pile widening in curve portion.
Rcc solid circular pier with pile
foundation
74 ROB at L.C. no. 222 at railway
K.M. 720/10-12 between DKI -
KTZ station on Hoshangabad
Khandawa road Detailed structural design
Bharat Spun
4 span of 20m each A&A and drawings of
Pipe
Consulting superstructure,
20M Rcc T-Beam girder Construction
Engineers substructure and
Rcc pier type Abutment with Co., Jabalpur
foundation.
pile
Rcc solid circular pier with pile
foundation
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
75 Submersible Bridge across
Behari Nalla on Khategaon to Detailed structural design
Bardha Road MKV and drawings of
2 Spans of 15M = 30M Consulting MPRRDA, superstructure,
Rcc box type abutment with pile Engineers, Dewas substructure and
Bhopal foundation.and detailed
Rcc solid circular pier with pile estimate
Pcc solid retaining wall
76 Submersible bridge across
umaria to ptparha road at KM MKV Detailed structural design
5.0 Consulting MPPWD, and drawings of
3 cell box bridge Engineers, B&R superstructure,
PCC solid Return Wall Bhopal substructure

77 Submersible box culvert across


P Nalla at KM 2/8 Hinanikheda MKV
R road to Gurnawda Consulting MPPWD,
-Do-
O 3 units of 3cell box 10.4m each Engineers, B&R
J Bhopal
RCC box type abutment
E
C 78 High level box culvert across
T Turan river on Roosa to Barnai MKV
C at CH 2420 to 2500 Consulting MPPWD,
-Do-
O 7 units of 3cell box 10.6m each Engineers, B&R
M Bhopal
RCC box type abutment
P
L 79 Submersible/High level Minor
Prepeartion of DPR of
E bridges up to 60m length
minor bridges including
T total 18Nos. Hydraulic calculation,
E Chhindwara, Narsinghpur, Lexus detailed structural design
D Dindori Infratech MPRRDA and drawing and detailed
including Joint site inspection LLP, Bhopal estimate including GST.
with CGM Jabalpur Also get approval from STA
JEC jabalpur and NRRDA
Delhi
80 Submersible/High level Minor
bridges up to 60m length Prepeartion of DPR of
total 7Nos. minor bridges including
Hydraulic calculation,
BETUL PIU
Nayaks detailed structural design
including Joint site inspection Syndicate, MPRRDA and drawing and detailed
with CGM Bhopal Bhopal estimate including GST.
Also get approval from STA
MANIT Bhopal and
NRRDA Delhi
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
81 submersible bridge across
Sitawa Nalla on Birsinghpur –
Shabapur Road MKV Detailed structural design
M/S Rajbali
Consulting and drawings of
Total length of Bridge = 30M Pandey,
Engineers, superstructure,
10M rcc solid slab Satna
Bhopal substructure
Wall type Pier
box type abutment
82 High Level bridge across
Satdhar River on Unchehara –
Parasmaniya Road MKV M/S Vijay
Total length of Bridge = 105M Consulting Singh Govt.
-Do-
15M rcc solid slab Engineers, Contractor,
Bhopal Satna
Wall type Pier
P box type abutment
R
83 Submersible bridge across
O
Bewas River chouka near
J
village on Banda-Bara-
E MKV
Kerbana Road in KM. 4/6-8 M/s Pranjal
C
Consulting
T Total length of Bridge = 270M Construction, -Do-
Engineers,
C 15M rcc solid slab Bhopal
Bhopal
O
M Wall type Pier
P box type abutment
L 84 High Level Bridge across Sone
E River on Shyamdih Kanwahi
T Road in Km. 3/2, District-
E Shahdol M/S Kaushal
MKV
D Total length of Bridge = 180M Prasad
Consulting
Patel, -Do-
22.5M RCC box girder Engineers,
Saman,
Bhopal
Solid cuircular pier with Rewa
open/pile foundation
box type abutment
85 Submersible Bridge across
Lodhri River on Bagli -
Bhourasa Road in Km. 41/10,
District-Dewas MKV
M/S Puneet
Total length of Bridge = 150M Consulting
Chadha, -Do-
Engineers,
30M PSC Box girder Bhopal
Bhopal
Solid Circular pier with pile
box type abutment with pile
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of Name of
Item Name of Client actual Services
No. the Project Consultant
provided
86 Widening of existing
Chetak R.O.B. near Jyoti
Talkies, M.P. Nagar,
Bhopal MKV Detailed structural
total length of ROB = Consulting M/S Puneet Chadha, design and drawings of
673.068M Engineers, Bhopal superstructure,
10.64M RCC solid slab Bhopal substructure
Solid circular
pier+rectangular pier
Rcc Stem type abutment
87 High Level Bridge across
Phalko River on Gobra
Katav Majholi Road,
Jabalpur MKV
M/S Singh
Total length of Bridge = Consulting
Construction Co., -Do-
60M Engineers,
Jabalpur
15M RCC Solid Slab Bhopal
P
R Wall type pier
O box type abutment
J
E 88 High Level Bridge across
C Kair River on Gobra Katav
T Majholi Road, Jabalpur
C Total length of Bridge = MKV
O 69M Consulting M/S S. L. Goyal,
-Do-
M 23M RCC box girder Engineers, Govt. Co., Jabalpur
P Bhopal
Solid cuircular pier with
L open foundation
E
box type abutment
T
E 89 High Level Bridge across
D Kshipra River at Sagwali –
Sipawara road, Ujjain
MKV M/S
Total length of Bridge = Consulting Shrivankhandeshwar
150M -Do-
Engineers, Construction Co.,
30M PSC Box girder Bhopal Ujjain
RCC wall type pier
box type abutment with pile
95 High Level Bridge across
Bihar River on Bodabag –
Karhia Road
Total length of Bridge = MKV
M/S Bhaiyalal
100M Consulting
Shukla Infrastructure -Do-
25M RCC box girder Engineers,
Pvt. Ltd., Rewa
Bhopal
RCC wall type pier with
pile
box type abutment with pile
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
96 Submersible Bridge Across
Sangam of Parwati & Ajnal
River (Dehrighat) near
Bamulia-Muchalla, District - MKV Detailed structural design
Shajapur M/S Shree
Consulting and drawings of
Construction,
Total length of Bridge = 135M Engineers, superstructure,
Jhabua
15M rcc solid slab Bhopal substructure
Solid cuircular pier with pile
foundation
box type abutment with pile
97 Submersible Bridge Across
Gopad river on Gotra Niwas
Road at KM. 11/8 MKV M/S Chetan Detailed structural design
Total length of Bridge = 225M Consulting Construction and drawings of
Engineers, Company, superstructure,
15M rcc solid slab
Bhopal Mehsana substructure
Rcc wall type pier
box type abutment
P
98 High Level Bridge across Sone
R
River at KM 7/2 on Bejodi –
O
Pasla Road
J MKV M/S Vijay Detailed structural design
E Total length of Bridge = 110M Consulting Singh Govt. and drawings of
C 27.5M PSC box girder Engineers, Contractor, superstructure,
T Bhopal Satna substructure
Solid cuircular pier with pile
C
foundation
O
box type abutment
M
P 99 High Level Bridge across
L Khantal River in KM 2/8 of Dug
E Susner Jirapur Road MKV M/S Detailed structural design
T Total length of Bridge = 110M Consulting Technokraft and drawings of
E Engineers, Infrastructure, superstructure,
22M RCC T-Beam girder
D Bhopal Bhopal substructure
RCC wall type pier
box type abutment
100 Submersible bridge across
Undwa Khal Nalla on Mundri –
Birmaval Road in K.M. 2/4 MKV Detailed structural design
M/S Tirupati
Total length of Bridge = 90M Consulting and drawings of
Constriction,
Engineers, superstructure,
15M rcc solid slab Ratlam
Bhopal substructure
Solid cuircular pier with
box type abutment
101 Submersible bridge across
Miyar River on Singrauliya –
Tiara Road MKV Detailed structural design
M/S
Total length of Bridge = 120M Consulting and drawings of
Rammilan
12M rcc solid slab Engineers, superstructure,
Sahu, Sidhi
Bhopal substructure
Rcc wall type pier
box type abutment
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
102 High level bridge across Bihar
River on Sirmaur – Semariya
Road in K.M. 6/4 MKV Detailed structural design
M/S M.P.
Total length of Bridge = 90M Consulting and drawings of
Builder,
15M rcc solid slab Engineers, superstructure,
Rewa
Bhopal substructure
Solid cuircular pier with
box type abutment
103 High level bridge across
Machak River on rolgaon to
palkind road
MKV M/S Detailed structural design
Total length of Bridge = 60M
Consulting Technokraft and drawings of
22M PSC Box with 5M Engineers, Infrasturcture, superstructure,
cantilever Bhopal Bhopal substructure
RCC wall type Pier
RCC Box type abutment
P 104 ROB at Railway Crossing No.
R 319A at Railway km. 997/3-4
O between Jabalpur Adhartal
J railway station on Vehicle -
E Rechhai Road in Jabalpur
C MKV M/S Chetan Detailed structural design
district Consulting Construction and drawings of
T 22M span T-Beam girder +
C Engineers, Co., superstructure,
O 13.33M span RCC solid slab Bhopal Mehsana substructure
M RCC solid circular pier with
P pile
L RCC box type aubtment with
E pile
T 105 High Level Bridge across Ajnar
E River on Rajgarh to Kalipeeth
D road in K.M. 8/10 MKV Detailed structural design
M/S Shyama
Total length of bridge = 150M Consulting and drawings of
Developers,
25M RCC box girder Engineers, superstructure,
Indore
Bhopal substructure
Solid circular pier
RCC box type abutment
106 ROB at L.c. No. 271 on Itarsi -
Manikpur section at Rly
Km. 889/7-8 on Kareli –
Piparia – Jabalpur Road in
Narsinghpur district MKV M/S Chetan Detailed structural design
Consulting Construction and drawings of
total length of ROB = 360M Engineers, Co., superstructure,
20M Rcc T-Beam girder Bhopal Mehsana substructure
Solid circular pier with pile
RCC box type abutment with
pile
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
107 ROB on Badnagar – Ujjain road
in between rly. L.C. no. 23 near
Ujjain (M.P.)
MKV M/S Ajay Detailed structural design
total length of ROB = 380M Consulting Protech Pvt. and drawings of
20M Rcc T-Beam girder Engineers, Ltd., superstructure,
Solid circular pier with pile Bhopal Mehsana substructure
RCC box type abutment with
pile
108 High Level Bridge across Kai
River on Sarangpur to
Sandwata road in K.M. 9/6 M/S
MKV Detailed structural design
Bhupendra
20M Rcc T-Beam girder Consulting and drawings of
Singh
Solid circular pier with open Engineers, superstructure,
Sisodia,
Bhopal substructure
foundation Sehore
P
R rcc box type abutment
O 109 Submersible bridge across
J Sone river on Rampur-Kharia
E road M/S Vijay
MKV Detailed structural design
C Total length of bridge = 435M Kumar
Consulting and drawings of
T Construction
15M rcc solid slab Engineers, superstructure,
C Pvt. Ltd.,
Bhopal substructure
O Wall type pier with open/pile fdn Rew
M RCC box type abutment
P
L 110 ROB in Lieu Level Crossing no.
E 276 at railway K.M. - 904/3-4
T between Narsinghpur -
E Chhindwara station on kareli -
MKV M/S Om Detailed structural design
D narsinghpur
Consulting Prakash and drawings of
total length of ROB = 280M
Engineers, Sharma, superstructure,
20M Rcc T-Beam girder Bhopal Gwalior substructure
Solid circular pier with pile
RCC box type abutment with
pile
111 Submersible bridge across
Kshipra river on Alampur
Udana Bolasa road district
M/S
Ujjain MKV Detailed structural design
Santosh
Total length of bridge = 45M Consulting and drawings of
Kumar
15M rcc solid slab Engineers, superstructure,
Lodhi,
Bhopal substructure
Solid circular pier with pile Raisen
RCC box type abutment with
pile
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
112 Submersible Bridge across
bajag chada road on baghreli
sani at ch 775M Nkashkaar
Detailed structural design
Engineers & MPRRDA,
Total length of bridge = 45M and drawings of
Consultants PIU -
superstructure,
15M rcc solid slab Pvt. Ltd., Dindori
substructure
Solid wall type pier Bhopal
RCC box type abutment
113 Submersible Bridge across
Singola to Ladsa Road at Ch.
2080M
Engineering Detailed structural design
Total length of bridge = 75M MPRRDA,
Consultancy and drawings of
PIU -
15M rcc solid slab Services, superstructure,
Balaghat
Solid circular pier with pile Gwalior substructure
RCC box type abutment with
pile
114 Ashoknagar to Aron Road Conditional Survey of
P Total length of Road = Nkashkaar Structures, Improvement
R 29.998Km Engineers & Proposal, Hydraulic
O MPRDC,
Total no. of Structure = 41nos. Consultants Calulation, GAD
J Bhopal
Pvt. Ltd., Preparation, Estimation
E Bhopal and Apporval from
C department
T
115 Bani Mohanlalganj Gosaiganj Conditional Survey of
C
O Total length of Road = Nkashkaar Structures, Improvement
M 31.200Km Engineers & Proposal, Hydraulic
UPSHA,
P Total no. of Structure = 49nos. Consultants Calulation, GAD
Lucknow
L Inculding 1 Major Bridge & 1 Pvt. Ltd., Preparation, Estimation
E ROB Bhopal and Apporval from
T department
E 116 MPPWD Bhopal PKG 8 to 14
D
Total length of Road = 787Km
(approx.)
Conditional Survey of
Total no. of Structure =
Nkashkaar Structures, Improvement
1750nos.(approx.)
Engineers & Proposal, Hydraulic
PKG- 8(Bhind/Datia), MPPWD,
Consultants Calulation, GAD
PKG-9(Gwalior/Morena), Bhopal
Pvt. Ltd., Preparation, Estimation
PKG-10(Shivpuri/Guna), Bhopal and Apporval from
PKG-11(Panna/Damoh), department
PKG-12(Vidisha),
PKG-13(Raisen),
PKG-14(Hoshangabad)
117 MPRDC CHAMBAL DIV. PKG 9 Conditional Survey of
Total length of Road = 299Km Nkashkaar Structures, Improvement
(approx.) Engineers & Proposal, Hydraulic
Total no. of Structure = 250nos. MPRDC,
Consultants Calulation, GAD
Bhopal
(approx.) Pvt. Ltd., Preparation, Estimation
Inculding Minor Bridges, Bhopal and Apporval from
Culverts, etc. department
LIST OF WORK DONE CONTINUE:
Description of the
S. Brief Description of the Name of Name of
Item actual Services
No. Project Consultant Client
provided
118 Widening and Reconstruction of
Madhya Pradesh Major District
Roads Upgradation Project
(MPMDRUP) Package No - 03
Tetra Vijaypur Iklodh Road
(MP-MDR-04-10), Goras
aawada ajapura Road (MP-
MDR-04-07), Iklod Tiraha to Brisk
Gandhi Chouk City Portion Engineering Hydraulic Design &
Vijayour (SH-45 Part) Total Consultants Detailed structural design
MPRDC,
Pkg. Length (km) : 44.53 & and drawings of
Bhopal
Technocrats superstructure,
Total length of Road = 44.53Km Pvt. Ltd., substructure & Foundation
(approx.) Bhopal
Total no. of Structure = 66nos.
Hume Pipe Culvert - 54nos.
Slab Culvert - 8nos.
P
Minor Bridge - 3nos.
R
O Major Bridge - 1nos.
J 119 Consultancy Work and Design
E of Road, Bridges, Culverts etc.
C for invitation of tender on EPC
T mode for construction of lateral
C roads near Indo-Pakistan
O Border under Sri Ganga Nagar,
M Bikaner, Jaisalmer North Sector
P in the state of Rajasthan Conditional Survey of all
L Package - 2 CPWD, Existing Structures,
E LN Malviya
Total length of Road = 1000Km Misnistry of Structural Design &
T Infra
(approx.) Home Detailed Drawings
E Projects Pvt.
Total no. of Structure in all Affairs, (including Inverted Syphon,
D Ltd.
Sectors = 259nos. Delhi Gabion, Hume Pipe
Culvert, Minor Bridge)
In Sri Ganganagar Sector =
240Nos
In Bikaner Sector = 4Nos
In Jaisalmer North & South
Sector = 15Nos
Design of Gabion Walls
120 Detail Project Report of 07
Bridges in Guna District, Rural Brisk
Hydraulic Design &
Engineering Services Engineering
Rural Detailed structural design
Government of Madhya Consultants
Engineering and drawings of
Pradesh &
Services, superstructure,
Total no. of Structure = 66nos. Technocrats
Guna substructure & Foundation,
Vented Causeway - 2nos. Pvt. Ltd.,
Cost Estimation
Bhopal
Minor Bridge - 4nos.
ACADEMIC QUALIFICATION

 Pursuing M.Tech (Structural Engineering) from SAGAR INSTITUTE OF RESEARCH


TECHNOLOGY & SCIENCE (Affiliated by Rajiv Gandhi Prodyogiki Vishwavidyalaya).
 Bachelor of engineering (civil engineering) from SAGAR INSTITUTE OF RESEARCH &
TECHNOLOGY, BHOPAL (Affiliated by Rajiv Gandhi Prodyogiki Vishwavidyalaya), with an
aggregate of 71.53% in 2013.
 12th MP board from Kamala Nehru Public Higher Secondary School with 76.4% in 2009.
 10th MP board from Kamala Nehru Public Higher Secondary School with 72.2% in 2007.

INDUSTRIAL TRAINING

COMPANY NAME : JMC Projects (India) Limited, Ahmadabad (Gujarat)


DURATION : 1 Month (1st June 2012 - 30th June 2012)

ACHIEVEMENTS

 Got first prize in technical model presentation (BASCULE BRIDGE) held at SIRT.
 Participated in Science Model Competition on Science day on 10th march 2010
at The Institute of Engineers (India).
 Runner up in basketball competition in sager utsav 2k10 at SIRT.

TECHNICAL SKILLS

 Microsoft Office
 AutoCAD 2009 (planning software)
 STAAD.PRO V8i (structural analysis & design software)
 In depth knowledge of codes – IRS, IRC and IS codes.
 Estimation of bridges and familiar with latest SOR of MP & CG.

STRENGTHS AND HOBBIES

Strengths:
 Responsible
 Dedicated
 Self motivated
 Positivity
 Adjustable

Hobbies:
 I like playing carom
 I like playing basket ball
 I like playing badminton
 Listening music

PERSONAL PROFILE

DOB : 24-Feb-1991
Fathers Name : Late Mr. Madan Joshi
Mother’s Name : Mrs. Pushpa Joshi
Mother’s Occupation : Govt. Employee
Permanent Address : B-412, Sagar Premium Towers Ph.-1,
JK Hospital Road, Bhopal, M.P.- 462042
Contact No. : +91-9755425676, +91-7000772524
E-mail ID : [email protected]
Language Known : English, Hindi, Marwari.
Marital Status : Married
DECLARATION

I hereby declare that the information furnished above is true to the best of my knowledge.

Place: - Bhopal Aditya Joshi

Date: - 08-04-2019

You might also like