#2015 05 Eaton/Merrill/Barland Road Reconstruction: Base Bid Concrete
#2015 05 Eaton/Merrill/Barland Road Reconstruction: Base Bid Concrete
#2015 05 Eaton/Merrill/Barland Road Reconstruction: Base Bid Concrete
Base Bid ‐ Concrete
1 Furnish, Install & Maintain Inlet Protection 45 EA $49.00 $2,205.00 $50.00 $2,250.00 $50.00 $2,250.00 $50.00 $2,250.00
2 Furnish Concrete Pavement Removal 18,060 SY $2.74 $49,484.40 $5.15 $93,009.00 $4.06 $73,323.60 $6.10 $110,166.00
3 Furnish Concrete Sidewalk & Driveway Removal 900 SY $3.20 $2,880.00 $0.48 $432.00 $7.89 $7,101.00 $6.60 $5,940.00
4 Furnish Unclassified Excavation 3,300 CY $9.15 $30,195.00 $16.60 $54,780.00 $18.35 $60,555.00 $22.60 $74,580.00
5 Furnish Excavation Below Subgrade (EBS) 650 CY $19.00 $12,350.00 $16.52 $10,738.00 $16.91 $10,991.50 $22.60 $14,690.00
6 Furnish Sawcut 2,950 LF $1.29 $3,805.50 $1.99 $5,870.50 $1.40 $4,130.00 $1.40 $4,130.00
7 Furnish & Place 1‐1/4" Stone Base 6,550 TON $9.90 $64,845.00 $13.33 $87,311.50 $13.41 $87,835.50 $14.20 $93,010.00
8 Furnish & Place 7" Concrete Pavement 4,560 SY $26.70 $121,752.00 $24.08 $109,804.80 $22.82 $104,059.20 $27.75 $126,540.00
9 Furnish & Place 8" Doweled Concrete Pavement 12,500 SY $30.33 $379,125.00 $29.24 $365,500.00 $27.83 $347,875.00 $32.60 $407,500.00
10 Furnish & Place 30" Curb & Gutter 5,250 LF $14.95 $78,487.50 $12.92 $67,830.00 $13.71 $71,977.50 $13.75 $72,187.50
11 Furnish & Place 30" Curb & Gutter ‐ Hand Poured 775 LF $17.95 $13,911.25 $21.90 $16,972.50 $20.37 $15,786.75 $28.60 $22,165.00
12 Furnish & Place 7" Concrete Driveway Apron 515 SY $36.00 $18,540.00 $42.59 $21,933.85 $52.06 $26,810.90 $41.40 $21,321.00 No Bid
13 Furnish & Place 7" Concrete Handicap Ramp 1,580 SF $4.00 $6,320.00 $4.71 $7,441.80 $6.07 $9,590.60 $5.70 $9,006.00
14 Furnish & Place 7" Concrete Sidewalk 260 SF $4.00 $1,040.00 $4.71 $1,224.60 $6.07 $1,578.20 $6.50 $1,690.00
15 Furnish & Place 5" Concrete Sidewalk 2,450 SF $3.75 $9,187.50 $3.35 $8,207.50 $5.41 $13,254.50 $3.75 $9,187.50
16 Furnish Tie Bars 2,500 EA $4.83 $12,075.00 $2.65 $6,625.00 $4.66 $11,650.00 $5.50 $13,750.00
17 Furnish & Install 1/2" Felt 1,250 LF $0.85 $1,062.50 $0.01 $12.50 $0.40 $500.00 $1.55 $1,937.50
18 Furnish Linseed Oil Cure 250 GAL $15.18 $3,795.00 $0.01 $2.50 $7.75 $1,937.50 $10.00 $2,500.00
19 Furnish & Place Detectable Warning Fields (24" x 24" Cast DWD Yellow) 48 EA $123.00 $5,904.00 $27.50 $1,320.00 $123.00 $5,904.00 $150.00 $7,200.00
20 Furnish Traffic Control 1 LS $8,500.00 $8,500.00 $8,140.00 $8,140.00 $4,853.00 $4,853.00 $4,500.00 $4,500.00
21 Furnish 8" Top Soil & Sod 5,400 SF $1.80 $9,720.00 $1.75 $9,450.00 $1.75 $9,450.00 $1.85 $9,990.00
22 Furnish Terrace Restoration 7,650 SF $1.80 $13,770.00 $1.15 $8,797.50 $1.15 $8,797.50 $1.85 $14,152.50
Subtotal (Items 1‐22) $848,954.65 $887,653.55 $880,211.25 $1,028,393.00
Sewer/Drainage Items
23 Furnish & Install 4" ADS Drain Tile w/ Silt Sock (includes 3/8" stone chip backfill) 4,950 LF $5.64 $27,918.00 $13.50 $66,825.00 $14.13 $69,943.50 $15.10 $74,745.00
24 Adjust Structure (6" or less) (Catchbasins) 34 EA $250.00 $8,500.00 $475.00 $16,150.00 $475.00 $16,150.00 $475.00 $16,150.00
25 Repair Structure (6" or Greater) (Includes Catchbasins, Manholes & Sanitary) 10 VF $500.00 $5,000.00 $350.00 $3,500.00 $350.00 $3,500.00 $350.00 $3,500.00
26 Remove Abandoned Structure 3 EA $275.00 $825.00 $500.00 $1,500.00 $500.00 $1,500.00 $500.00 $1,500.00
27 Furnish & Install 84" Deck Slab Storm MH 6 VF $500.00 $3,000.00 $1,300.00 $7,800.00 $1,300.00 $7,800.00 $1,300.00 $7,800.00
28 Furnish & Install 60" Deck Slab Storm MH 4 VF $420.00 $1,680.00 $700.00 $2,800.00 $700.00 $2,800.00 $700.00 $2,800.00
No Bid
29 Furnish & Install Manhole Frame & Grate (Neenah R‐1661‐A Frame, Lid w/ Pickhole) 2 $675.00 $1,350.00 $500.00 $1,000.00 $500.00 $1,000.00 $500.00 $1,000.00
30 Furnish & Install 24" x 36" Storm Catchbasin 60 VF $240.00 $14,400.00 $395.00 $23,700.00 $395.00 $23,700.00 $395.00 $23,700.00
31 Furnish & Install Catch Basin Frame & Grate ‐ Neenah R‐3246 w/ Type C Grate 12 EA $450.00 $5,400.00 $500.00 $6,000.00 $500.00 $6,000.00 $500.00 $6,000.00
32 Furnish & Install 12" RCP Storm Sewer Class V (w/ gravel backfill) 170 LF $75.00 $12,750.00 $115.50 $19,635.00 $115.50 $19,635.00 $115.50 $19,635.00
33 Furnish Storm Water Basin Construction 250 SY $18.00 $4,500.00 $4.00 $1,000.00 $16.70 $4,175.00 $29.50 $7,375.00
Subtotal (Items 23‐33) $85,323.00 $149,910.00 $156,203.50 $164,205.00
Concrete Base Bid Totals
1 General Items (Items 1 ‐ 22) $848,954.65 $887,653.55 $880,211.25 $1,028,393.00
2 Sewer/Drainage Items (Items 23 ‐ 33) $85,323.00 $149,910.00 $156,203.50 $164,205.00
No Bid
3 Contingency $25,000.00 $25,000.00 $25,000.00 $25,000.00
Base Bid Total $959,277.65 $1,062,563.55 $1,061,414.75 $1,217,598.00
Alternate Asphalt Bid 1
1 Furnish, Install & Maintain Inlet Protectioion 45 EA $50.00 $2,250.00 $50.00 $2,250.00 $55.00 $2,475.00
2 Furnish Concrete Pavavement Removal 17,260 SY $5.15 $88,889.00 $6.10 $105,286.00 $2.00 $34,520.00
3 Furnish Concrete Sidewalk & Driveway Removal 900 SY $0.48 $432.00 $6.60 $5,940.00 $4.00 $3,600.00
4 Furnish Unclassified Excavation 3,270 CY $16.60 $54,282.00 $22.60 $73,902.00 $28.00 $91,560.00
5 Furnish Excavation Below Subgrade (EBS) 650 CY $16.52 $10,738.00 $22.60 $14,690.00 $28.00 $18,200.00
6 Furnish Sawcut 2,950 LF $1.99 $5,870.50 $1.40 $4,130.00 $1.40 $4,130.00
7 Furnish & Place 1‐1/4" Stone Base 7,200 TON $13.33 $95,976.00 $14.20 $102,240.00 $12.56 $90,432.00
8 Furnish & Place 4‐1/2" HMA Binder Course Type E‐3 (19mm) (Multiple Lifts) 4,250 TON $51.33 $218,152.50 $54.50 $231,625.00 $51.98 $220,915.00
9 Furnish & place 1‐1/2" HMA Surface Course Type E‐3 (12mm) 1,450 TON $55.70 $80,765.00 $58.80 $85,260.00 $56.42 $81,809.00
10 Furnish & Place Tac Coat 1,600 GAL $2.05 $3,280.00 $2.00 $3,200.00 $2.06 $3,296.00
11 Furnish & Place 7" Concrete Pavement 565 SY $24.08 $13,605.20 $29.75 $16,808.75 $34.00 $19,210.00
12 Furnish & Place 30" Curb & Gutter 5,250 LF $12.92 $67,830.00 $13.75 $72,187.50 $16.50 $86,625.00
No Bid No Bid
13 Furnish & Place 30" Curb & Gutter ‐ Hand Poured 775 LF $21.90 $16,972.50 $28.60 $22,165.00 $29.00 $22,475.00
14 Furnish & Place 7" Concrete Driveway APron 515 SY $42.59 $21,933.85 $41.40 $21,321.00 $32.00 $16,480.00
15 Furnish & Place 7" Concrete Handicap Ramp 1,580 SF $4.71 $7,441.80 $5.70 $9,006.00 $3.90 $6,162.00
16 Furnish & Place 7" Concrete Sidewalk 150 SF $4.71 $706.50 $7.00 $1,050.00 $3.90 $585.00
17 Furnish & Place 5" Concrete Sidewalk 2,450 SF $3.35 $8,207.50 $3.75 $9,187.50 $3.74 $9,163.00
18 Furnish Tie Bars 480 EA $2.65 $1,272.00 $5.50 $2,640.00 $15.00 $7,200.00
19 Furnish & Install 1/2" Felt 1,250 LF $0.01 $12.50 $1.55 $1,937.50 $3.00 $3,750.00
20 Furnish Linseed Oil Cure 115 GAL $0.01 $1.15 $10.00 $1,150.00 $13.00 $1,495.00
21 Furnish & Place Detectable Warning Fields (24" x 24" Cast DWD Yellow) 48 EA $27.50 $1,320.00 $150.00 $7,200.00 $150.00 $7,200.00
22 Furnish Traffic Control 1 LS $20,140.00 $20,140.00 $4,500.00 $4,500.00 $12,338.00 $12,338.00
23 Furnish 8" Top Soil & Sod 5,400 SF $1.75 $9,450.00 $1.85 $9,990.00 $2.00 $10,800.00
24 Furnish Terrace Restoration 7,650 SF $1.15 $8,797.50 $1.85 $14,152.50 $1.00 $7,650.00
Subtotal (Items 1‐24) $738,325.50 $821,818.75 $762,070.00
Sewer/Drainage Items
25 Furnish & Install 4" ADS Drain Tile w/ Silt Sock (includes 3/8" stone chip backfill) 4,950 LF $13.50 $66,825.00 $15.10 $74,745.00 $13.50 $66,825.00
26 Adjust Structure (6" or less) (Catchbasins) 34 EA $475.00 $16,150.00 $475.00 $16,150.00 $400.00 $13,600.00
27 Repair Structure (6" or Greater) (Includes Catchbasins, Manholes & Sanitary) 10 VF $350.00 $3,500.00 $350.00 $3,500.00 $1,000.00 $10,000.00
28 Remove Abandoned Structure 3 EA $500.00 $1,500.00 $500.00 $1,500.00 $400.00 $1,200.00
29 Furnish & Install 84" Deck Slab Storm MH 6 VF $1,300.00 $7,800.00 $1,300.00 $7,800.00 $1,500.00 $9,000.00
30 Furnish & Install 60" Deck Slab Storm MH 4 VF No Bid $700.00 $2,800.00 No Bid $700.00 $2,800.00 $1,200.00 $4,800.00
31 Furnish & Install Manhole Frame & Grate (Neenah R‐1661‐A Frame, Lid w/ Pickhole) 2 EA $500.00 $1,000.00 $500.00 $1,000.00 $850.00 $1,700.00
32 Furnish & Install 24"x36" Storm Catchbasin 60 VF $395.00 $23,700.00 $395.00 $23,700.00 $600.00 $36,000.00
33 Furnish & Install Catch Basin Frame & Grate ‐ Neenah R‐3246 w/ Type C Grate 12 EA $500.00 $6,000.00 $500.00 $6,000.00 $950.00 $11,400.00
34 Furnish & Install 12" RCP Storm Sewer Class V (w/ gravel backfill) 170 LF $115.50 $19,635.00 $115.00 $19,550.00 $105.00 $15,015.00
35 Furnish Storm Water Basin Construction 250 SY $4.00 $1,000.00 $29.50 $7,375.00 $20.64 $5,160.00
Subtotal (Items 25‐35) $149,910.00 $164,120.00 $174,700.00
Alternate 1 ‐ Asphalt Bid Totals
1 General Items (Items 1 ‐ 24) $0.00 $0.00 $0.00 $821,818.75 $762,070.00
2 Sewer/Drainage Items (Items 25‐35) $0.00 $149,910.00 $0.00 $164,120.00 $174,700.00
3 Contingency $25,000.00 $25,000.00 $0.00 $25,000.00 $25,000.00
Base Bid Total NO BID $174,910.00 NO BID $1,010,938.75 $961,770.00
Alternate 2 Concrete
1 Furnish, Install & Maintain Inlet Protection 20 EA $15.00 $300.00 $50.00 $1,000.00 $50.00 $1,000.00 $50.00 $1,000.00
2 Furnish 7" Concrete Pavement Removal 4,560 SY $3.00 $13,680.00 $5.15 $23,484.00 $4.08 $18,604.80 $7.00 $31,920.00
3 Furnish Concrete Sidewalk & Driveway Removal 600 SY $4.50 $2,700.00 $0.48 $288.00 $7.89 $4,734.00 $7.00 $4,200.00
4 Furnish Unclassified Excavation 770 CY $14.50 $11,165.00 $16.60 $12,782.00 $19.72 $15,184.40 $23.50 $18,095.00
5 Furnish Excavation Below Subgrade (EBS) 100 CY $18.00 $1,800.00 $16.52 $1,652.00 $19.72 $1,972.00 $23.50 $2,350.00
6 Furnish Sawcut 500 LF $1.35 $675.00 $1.99 $995.00 $1.50 $750.00 $1.80 $900.00
7 Furnish & Place 1‐1/4" Stone Base 1,450 TON $14.40 $20,880.00 $13.33 $19,328.50 $13.41 $19,444.50 $16.00 $23,200.00
8 Furnish & Place 7" Concrete Pavement 4,560 SY $28.00 $127,680.00 $24.08 $109,804.80 $23.82 $108,619.20 $27.75 $126,540.00
9 Furnish & Place 30" Curb & Gutter 2,650 LF $14.95 $39,617.50 $11.30 $29,945.00 $13.43 $35,589.50 $13.75 $36,437.50
10 Furnish & Place 30" Curb & Gutter ‐ Hand Poured 175 LF $17.95 $3,141.25 $18.75 $3,281.25 $20.37 $3,564.75 $30.60 $5,355.00
11 Furnish & Place 7" Concrete Driveway Apron 480 SY $36.00 $17,280.00 $42.59 $20,443.20 $52.06 $24,988.80 $41.50 $19,920.00
12 Furnish & Place 7" Concrete Handicap Ramp 800 SF $4.75 $3,800.00 $4.71 $3,768.00 $6.07 $4,856.00 $6.10 $4,880.00
No Bid
13 Furnish & Place 5" Concrete Sidewalk 150 SF $4.65 $697.50 $4.71 $706.50 $6.07 $910.50 $6.70 $1,005.00
14 Furnish & Place 5" Concrete Sidewalk 450 SF $3.70 $1,665.00 $3.35 $1,507.50 $5.41 $2,434.50 $5.25 $2,362.50
15 Furnish Tie Bars 900 EA $5.20 $4,680.00 $1.54 $1,386.00 $4.66 $4,194.00 $5.50 $4,950.00
16 Furnish & Install 1/2" Felt 950 LF $1.00 $950.00 $0.01 $9.50 $0.40 $380.00 $1.55 $1,472.50
17 Furnish Linseed Oil Cure 25 GAL $15.18 $379.50 $0.01 $0.25 $7.75 $193.75 $10.00 $250.00
18 Furnish & Place Detectable Warning Fields (24" x 24" Cast DWD Yellow) 20 EA $123.00 $2,460.00 $26.67 $533.40 $123.00 $2,460.00 $150.00 $3,000.00
19 Furnish Traffic Control 1 LS $13,850.00 $13,850.00 $8,140.00 $8,140.00 $1,667.00 $1,667.00 $2,500.00 $2,500.00
20 Furnish Structure Adjustment (6" or Less) (Catch Basins) 19 EA $240.00 $4,560.00 $350.00 $6,650.00 $475.00 $9,025.00 $475.00 $9,025.00
21 Furnish Terrace Restoration 6,300 SF $1.80 $11,340.00 $1.15 $7,245.00 $1.15 $7,245.00 $1.90 $11,970.00
Subtotal (Items 1 ‐21) $283,300.75 $252,949.90 $267,817.70 $311,332.50
Contingency $15,000.00 $15,000.00 $15,000.00 $15,000.00
Eaton/Merrill Only Total $298,300.75 $267,949.90 $282,817.70 $326,332.50
Base Bid ‐ Final
Concrete Base Bid $959,277.65 $1,062,563.55 $1,061,414.75 $1,217,598.00 NO BID
Alternate 1 ‐ Final
Asphalt Alternate 1 Bid NO BID $973,655.50 NO BID $1,010,938.75 $961,770.00
Extras & Deletions ‐ Final
Concrete Base Bid ‐ Replace 4" Drain Tile w/ 12" ADS AdvanEdge $10.00/LF $93,060.00 $104,643.00 $95,000.00 NO BID
Asphalt Base Bid ‐ Replace 4" Drain Tile w/ 12" ADS AdvanEdge NO BID $93,060.00 NO BID $95,000.00 $108,900.00
Alternate 3 ‐ Final
Alternate 3 ‐ Eaton/Merrill Concrete Only Bid $283,300.75 $267,949.90 $282,817.70 $326,332.50 NO BID