1.

Description
Modification to 440V specification from 220V AVR-CT.

2.Tools
(1) Field Service Engineer Standard tool
(2) Soldering iron and solder
(3) Fuse 2piece
3.Manpower and Time needed
One person / Three hour
4.Procedure
AVR CT special type (AC220V)
 4-1. Remove the jumper wire
Remove the jumper wire of resistance R19(2k ohm) for short.
on LV SEL CONT-10 BOARD
  4-2. Wiring modification
Change wiring of the transformer AT-1 terminal block. (Refer to Circuit diagram)

( Transformer terminal block)


No. WIRING MARK Wire Opposite side
before      after
1 UH U220 → U480 Magnet KH 1

2 UM U200 → U440 Magnet KM 1

3 UL U180 → U400 Magnet KL 1

4 VH V220 → V480 Magnet KH 3

5 VM V200 → V440 Magnet KM 3

6 VL V180 → V400 Magnet KL 3

7 WH W220 → W480 Magnet KH 5

8 WM W200 → W440 Magnet KM 5

9 WL W180 → W400 Magnet KL 5

10 LU0 U360 → U400 Terminal X2 LU0

11 LV0 V360 → V400 Terminal X2 LV0

12 LW0 W360 → W400 Terminal X2 LW0


4.3 Remove the wire
4.3.1 ) Remove the wire from the output side of the U terminal of the breaker
and OT2 terminal of the terminal block X2 on the LV SEL CONT-10.
(This harness don’t use for 440type AVR)
4.3.2) Remove the wire from the output side of the V terminal of the breaker and
F-TA2 terminal on fuse
box terminal with the one of Harness AVR(LV1-FTA22).
(This harness don’t use for 440type AVR)
4.4) Remove the isolation cap
Remove the isolation cap “F-TA2 ” and “0T2” on the cables .
(Refer to following pictures Fig.1 and Fig2)
Connect the wire
1). Connect “F-TA2” to fuse holder.(Fig.1)
2). Connect “0T2” to X2 terminal on the LV SEL CONT-10.(Fig.2)

Fig.1 Fuse Holder F-TA2 Fig,2 LV SEL CONT-10

4.5) Add the Fuse


Add the fuse F-U0 and F-V0 in primary side of TAV2 transformer .
1A / 250V 2pices

4.6) Change of the transformer TAV2  taps.


Change the tap according to nominal power supply voltage with solder.
440V → Tap 0V , 440V
4.7 Wiring change
① Remove the cable wired by output terminal X2 LU0 from
the fuse holder F- U0 bottom by the terminal X2 side.
Wiring to the removed terminal LU0 on the top U terminal (LU1)
of Breaker NFB.
② Remove the cable wired by output terminal X2 LV0 from
the fuse holderF-V0 bottom by the terminal X2 side.
Wiring to the removed terminal LV0 on the top U terminal (LV1)
of Breaker NFB.
4.8) Set the thermal contactor to “0.52(0.52A)”

0.52
  5.Adjustment Check
   The adjustment are check is performed with reference to the following.

An extract is made from “INSTALLATION MANUALFOR UAVR-50K (CT POWER SUPPLY)”

 Adjustment
(1) Preparation
(a) Turn off NFB of the control cabinet before turning on NFB of the line and the
former NFB must be held open during adjustment of AVR-CT.

CAUTION
When the wiring circuit breaker and the AVR circuit breaker are
closed (turned ON), power is supplied to the autotransformer and
AVR-CT. Be fully careful !

(b) Confirm the connection of AVR-CT. Refer to 3.1.


(c) Remove fuses “F-TA1” and “F-TA2” of AVR-CT.
(d) Remove wires “UH”, “UL”, “VH”, “VL”, “WH”, “WL” between auto-transformer
and the magnet relay “K-H”, “K-M”, “K-L”, and tape each terminals for the safety.
Do not remove wires “UM”, “VM” and “WM”.

(2)  Turn on the NFB of the line and measure the input voltage and output voltage
of the transformer “TAV1” and “TAV2”.

Voltage
0-400 Line voltage
TAV1
0-10 1/40 of line voltage (ex.) 10V when 400V
0-380/400/415/440 Line voltage
TAV2
0-220 220V ± 44V

CAUTION
IF the voltage of TAV2 exceed the above range, connections in the section 3.1
is mistaken or the fluctuation of the line voltage is too large (more then ±
20%).
Confirm the connection of 3.1. When the connection is right and the
fluctuation is high, do not use this unit. And stop the adjustment or break the
unit. At this time , the meter relay (set at ±10%) also operates.

(3)  Adjustment of LV SEL CONT-10


(a)  Turn off the NFB of the line and insert the fuse“F-TA1” and “F-TA2”.
(b)  Turn on the NFB of the line.
Then LV SEL CONT-10 is energized.
Adjust the DC power supply so as to get the voltage of +12V DC between the
check terminal CP4 GND and the check terminal CP3 +12V.

(c)  Connect the digital voltage meter between the check terminal CP1 PLV SIG and
the check terminal CP4 GND.
(i) Adjust the VR1 to get the voltage of 4V at the check terminal CP1 PLV SIG.
At this time, confirm the LED L lights and magnet relay “K-L” is turned on.
Next, short-circuit between check terminal CP3 +12V and “15” of terminal
“X1” and between check terminal CP4 GND and “KCLV” of terminal “X1”. Then,
confirm the LED L lights out and the magnet relay “K-L” is not turned off.
Remove above the short circuit and confirm the LED L lights after 2 seconds.

(ii) Increase the voltage of the check terminal CP1 PLV SIG gradually over
4.9V and confirm the LED L lights out and the LED M lights. And also
confirm the magnet relay “K-L” is turned off and the magnet relay “K-M” is
turned on.
Next, short-circuit between check terminal CP3 +12V and “15” of terminal
“X1” and between check terminal CP4 GND and “KCLV” of terminal “X1”.
At this time, confirm the LED M lights out and the magnet relay “K-M” is not
turned off.
(iii) Increase the voltage of the check terminal CP1 PLV SIG over 5.35Vand
confirm the LED M lights out and the LED H lights. And also, confirm the
magnet relay “K-M” is turned off and the magnet relay “K-H” is turned on.
Next, short-circuit between check terminal CP3 +12V and “15” of
terminal “X1” and between check terminal CP4 GND and “KCLV” of
terminal “X1”. At this time, confirm the LED H light out and the magnet
relay “K-H” is not turned off.
Remove above the short circuit and confirm the LED H lights after 2
seconds.
(iv) Increase the above voltage to 5.5V and then decrease the voltage under
5.1V.
Confirm the LED H lights out and LED M lights.
And also, confirm the magnet relay “K-H” is turned off and the magnet
relay “K-M” is turned on.
(v) Decrease the voltage under 4.65V and confirm the LED M lights out and
the LED L lights.
And also, confirm the magnet relay “K-M” is turned off and magnet relay
“K-L” is turned on.

(d)  Adjust the voltage of the check terminal CP1 PLV SIG to 5V by trimming the VR1
when the line voltage becomes to nominal voltage.
(ex.) When measured voltage between LU and LV is 400V at 380V nominal
voltage, adjust it to
400V
5V × = 5.26V
380V
(ex.) When measured voltage between LU and LV is 370V at 380V nominal
voltage, adjust it to
370V
5V × = 4.87V
380V

(4)  Turn off the NFB of the line and connect the wires that are removed in (1)-(d).
(5)  Turn on the NFB of the line. Confirm that AVR-CT runs and the voltage
between LUO and LVO of the added terminal is 400V ± 40V.
(6)  Meter relay operational check and setting
(a)  Turn ON the wiring and AVR inside circuit breakers.
(b)  Make sure that the meter relay shown in Fig.4 indicates a value around 200V.
(c)  Turn the operating point setting volumes located
at right and left on the meter front and overlap one
at right and left on the meter front and overlap one
setting pointer on another one to make sure of
lighting of the operation indicator lump at each
operating point.
(d)  After making sure of the above, set the left
operating point setting volume to 180V and the
right one to 220V.

Adjust of ACR-CT is now complete.