Process
INFRA SERVICES
Active & Passive
IT and Infrastructure
Vendors
Supply Chain
Quality Objective
What will be done what resources will be required who will be responsible
Installation
Process Efficiency Measurement
Site allocation
(customer emails)
Start Project
Circle heads Execution
/PM/PL/Co ordinator
Scopeof Work
review
Team
ready
Verify site readiness for
SOW (RFI activity)
No Task assigned by
PM/PL/Co ordinator
to team
Verification
Sucessful
Verification
Sucessful
No
If SOW Execute work
is End-End order
Update status of
work to Back office
Kitting and pick up
from Warehouse
Back office to
communicate to
Project Execution client
as per SOW
PE
AT
Installation
Start Project Standard for SOW
related to quality AT process
Execution
I&C
Integration and
No ATP 11B with Alarm
Capture I&C snaps clearance
Team and complete Quality control
ready formalities all paramerters are
updated
updated
on
Hiring Process requirements on client on
Client
Client
portal
portal
portal Approach customer
Approach customer
Task assigned by for approval for II nd
for approval for I st
PM/PL/Co ordinator stage of WCC
stage of WCC process
to team process
Verification Verification
Successful Successful
&Approved
RF ACITIVITY
Integration
Integration and
ATP 11B with Alarm
clearance
Quality control Verification
paramerters are
updated
updated
on Successful
on
Client
Client
portal
portal &Approved
Approach customer
for approval for II nd
stage of WCC
process
Approach customer
for approval for
WCC process
Verification
Successful
PRE INSTALLATION ACTIVITY
Scope
Customer
PO RFI :
Input: Process:
Allocation of sites Via portal “Site Forge” to 1. Ikya checks for pole mount availability for ante
Ikya for RFI activity. (Alpha,Beta,Gamma) and cable length requirement.
a) CPRI – Common programmed radio Interface
b) RRU – Radio Relay Unit
c) RRU Grounding cable length
2. MCB availability
3. Power availability
4. Site access related information such as site
key, owner, and locality.
Process:
1. Ikya checks for pole mount availability for antenna installation for three sectors
(Alpha,Beta,Gamma) and cable length requirement. The recommended cables are
a) CPRI – Common programmed radio Interface
b) RRU – Radio Relay Unit
c) RRU Grounding cable length
2. MCB availability
3. Power availability
4. Site access related information such as site
key, owner, and locality.
Information captured are updated on the Site Forge portal. If all the parameters are correct a
survey report is generated. This report can either yield to a “No” or “No Go” status.
The go status is an indication for materials to be dispatched for the activity as per SOW. The
material dispatch will be put on hold for the “No Go” status.
QC Check point Remark
cable Measurements Requirement of an
Additional Ladder
Pole mount Availability
Power availability
MCB Availability
Grounding (EGB,IGB,TGB)
Output:
Records at this stage:
RFE Report ( generated by the portal)
orrect a
W. The
INSTALLATION ACTIVITY
Scope
Input: Process:
RFI Cleared Status 1. Material Request Note is sent to the wear house
material Request Note to wearhouse 2. Material is received in site as per proof of delivery
Material availability in Site available the installation is completed as per SLA ,in
keep the PM/PL informed meanwhile all the other a
3. Installation activity begins as per installation stand
4. Quality of the installation is audited according to
5. QC 1 is filled at site and submitted to quality team
6. Begin ATP 11A process
Resource Requirement SLA Risk
Manpower- 4 Falls and Trips
Rigger - 1
Engineer - 1 Extreme Weather
Technicians - 2 Conditions
HW Tools : Beehive,crow
Installation Tools nest,eagle nest
Process:
ATP 11A
Output:
QC 1 list
als are ATP 11A completion
r shall
d
POST INSTALLATION ACTIVITY - ATP 11A
Scope
Application for Installation quality checking , done by
Customer the site engineer according to the parameters as
PO available in the application
Input: Process:
HW Tools : Mishandling of
Andriod Phone / TAB equipment
Process:
ATP 11A
Output:
Input: Process:
HW Tools : Mishandling of
Andriod Phone / TAB equipment
Process:
ATP 11A
Output:
Input: Process:
HW Tools : Mishandling of
Andriod Phone / TAB equipment
Process:
ATP 11A
Output:
Input: Process:
HW Tools : Mishandling of
Andriod Phone / TAB equipment
Process:
ATP 11A
Output:
Input: Process:
HW Tools : Mishandling of
Andriod Phone / TAB equipment
Process:
ATP 11A
Output:
Input: Process:
HW Tools : Mishandling of
Andriod Phone / TAB equipment
Process:
ATP 11A
Output: