SR No Item of Work Quantity As Per Contractor: Comparision Statement Contractor Bill

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 12

COMPARISI

Contractor Bi
Sr No Item of Work Quantity as per Contractor

Quantity Unit Rate


1
BRIDGE PORTION : Providing and placing in position TMT (Fe 415 Grade) reinforcement bars in
various structural elements of the bridge including cutting, straightening, bending, binding with
mild steel annealed binding wire of 18 SWG complete as per the Drawings and Specifications.
Item to include all incidentals, labor, materials, equipment and works required to execute the
job 59.289 tonne 70500
2
Providing and placing in position TMT (Fe 415 Grade) reinforcement bars in various structural
elements of the bridge including cutting, straightening, bending, binding with mild steel
annealed binding wire of 18 SWG complete as per the Drawings and Specifications. Item to
include all incidentals, labor, materials, equipment and works required to execute the job.
(Labor rate only). 19.974 tonne 10500
3

Providing and placing cement concrete for construction of abutments, abutment caps including
return, dirt and wing walls as applicable, bearing pedestals (if any), piers, pier caps etc. with M
35 grade concrete using Ordinary Portland Cement, 20mm & down stone aggregate and
approved quality sand as per the Drawings and Specifications including all types of shuttering,
staging, scaffolding, necessary tools, plants, machinery and all related operations as required to
complete the work with all leads lifts and depths true to level and position all complete and
excluding only the cost of reinforcement which shall be paid under Item 1.0 . The minimum
slump of concrete shall be 100mm at the time of placement of concrete. 216.01 cum 7700
4
Providing weep holes in abutment wall, wing wall/return wall with 100mm dia AC pipe,
extending through the full width of the structure with slope of 1V:20H towards drawing face as
per the Drawings and Specifications. Item to include all materials, labor, machinery/equipment
and incidental work required to complete the job. Measurement shall be made for actual
length of weep holes. 1122 rmt 200
5

SUPER STRUCTURE :- Providing and placing in position M 35 grade concrete in cast-in-situ deck
slab and arch rib using Ordinary Portland Cement, 20mm & down stone aggregate and
approved quality sand as per the Drawings and Specifications. Item to include cost of
shuttering, staging, scaffolding, tools, plant and machinery, material, labor and all incidentals
required to execute the job. Only the cost of the reinforcement is not included in this item and
shall be paid separately under Item 1.0 The minimum slump of concrete shall be 100mm at the
time of placement of concrete. 364.95 cum 9650
6

Providing and placing M35 grade RCC with Ordinary Portland Cement, using 20mm down stone
aggregate and approved quality sand in cast-in-situ approach slab over the approaches,
complete with making all joints and their sealing, as per the Drawings and Specifications
excluding the cost of reinforcement only. The minimum slump of concrete shall be 100mm at
the time of placement of concrete. 29.4 cum 7500
7
Providing and placing M35 grade cement concrete with Ordinary Portland Cement, using
20mm down stone aggregate and approved quality sand in cast-in-situ crash barriers, kerbs
over the superstructure with finish as per the Drawings and Specifications excluding the cost of
reinforcement only. The minimum slump of concrete shall be 100mm at the time of placement
of concrete. 33.338 Cum 7500
8

Providing and fixing hand rail over the crash barrier consisting of MS base plate, embedded
fastener and nuts, MS vertical plates and pipes etc. as shown in the Drawings and as per
Specifications. All the railing components as mentioned above to be hot dip galvanized with a
zinc coating of at least 175 gm/sqm. The thickness of plates to be as shown in the drawings and
pipe to be 65NB heavy class with a weight not less than 7.92 kg/m and conforming to IS: 1161-
1979. Item to include all incidentals, labor, material, equipment and works required to execute
the job. Measurement shall be made for the actual length of the pipe only. 95 Rmt 1800
9

Providing and installing single strip seal expansion joint with a total allowable movement of
70mm as per Drawings, Specifications and MORTH circular no. RW/NH-35049/1/96-S&R dated
30th November 2000 and 20th February 2001 duly supplemented with manufacturer's
recommendations. Entire installation is to be carried out strictly in the presence of
manufacturer's representative only at all times who shall certify the quality of work. Item to
include necessary provision and filling of recess for the expansion joints at no extra cost. The
seal of the expansion joint shall be such as not to permit any dust collection at all times. Item to
include all incidentals, labor, material, equipment and works required to execute the job.
Measurement shall be made for the actual length of the expansion joint only. 24.6 Rmt 10500
10

Providing and laying 1:4:8 PCC (1 cement: 4 coarse sand: 8 stone aggregate 40mm nominal size)
in the footpath as per the Drawings and Specifications. Item to include all materials, labor,
machinery/equipment and incidental work required to complete the job. The quoted rate shall
also include cost of the pipes for services as shown in the Drawings. Measurement shall be
made for the actual volume of concrete only 32.24 Cum 3000
11

Providing and fixing drainage spouts complete as per the Drawings and Specifications. Item to
include all materials, labor, machinery/equipment and incidental work required to complete
the job. Measurement shall be made for the actual number of drainage spouts only. 7 no 2500
12
Providing & applying the Prime Coat as per MORTH Specifications with bitumen emulsion on
prepared surface including cleaning of surface and spraying primer at the rate of 0.60 kg/sqm
using mechanical means. Item to include all materials, labor, machinery/equipment and
incidental work required to complete the job. Measurement shall be made for actual surface
area of application 1885 sqm 30
13

Cleaning & preparing surface and providing & applying the Tack Coat with bitumen emulsion
using emulsion pressure distributor at the rate of 0.20 kg/sqm as per MORTH Specifications.
Item to include all materials, labor, machinery/equipment and incidental work required to
complete the job. Measurement shall be made for actual surface area of application. 3770 sqm 11
14

Providing and laying 40mm thick Bituminous Concrete wearing coat with 100-120 TPH batch
type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates
of specified grading, premixed with bituminous binder @ 5.5 percent of mix and filler,
transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control
to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORTH Specifications Clause 509 complete in
all respect. Item to include all materials, labor, machinery/equipment and incidental work
required to complete the job. Measurement shall be made for finished volume of bituminous
concrete. 285 sqm 400
15

Providing and laying 25mm Mastic Asphalt Wearing Course with paving grade bitumen meeting
the requirements given in Table 500-29, prepared by using mastic cooker and laid to required
level and slope after cleaning the surface, including providing antiskid surface with bitumen
precoated fine grained hard stone chipping of 13.2mm nominal size at the rate of 0.005 cum
per 10sqm and at an approximate spacing of 10cm center to center in both directions, pressed
into surface when the temperature of surfaces is not less than 100oC, protruding 1mm to 4mm
over mastic surface, all complete as per Clause 515 of MORTH Specifications. Item to include all
materials, labor, machinery/equipment and incidental work required to complete the job.
Measurement shall be made for actual surface area of application. 285 sqm 650
16

Earth work in excavation of foundation of Masonry retaining wall as per the Drawings and
Specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious matter, dressing of sides and bottom and backfilling with approved material
complete as per MORTH Specification. Item to include all materials, labor,
machinery/equipment and incidental work required to complete the job. 1302.3 cum 145
17

Providing and laying 1:4:8 PCC (1 cement: 4 coarse sand: 8 stone aggregate 20mm nominal size)
below foundation of Masonry retaining wall as per the Drawings and Specifications. 108.25 cum 3100
18

Providing, laying, spreading and compacting specified graded sand, stone aggregate or any
other coarse material as per MORTH Specifications (Table 400-I) gradation-II of C.B.R. value not
less than 20 in lower granular sub-base course 150mm thick including mixing the material to
OMC, spreading with motor grader on a prepared base compacting with vibratory road roller to
achieve the desired density including all materials, labor, machinery, etc. complete. Item to
include all incidental work required to execute the job as per MORTH Specifications. The item
shall be measured and paid for the finished volume of granular sub base. 360 cum 1750
19

Providing, laying, spreading and compacting specified graded sand, stone aggregate or any
other coarse material as per MORTH Specifications (Table 400-I) gradation-I of C.B.R. value not
less than 30 in upper granular sub-base course 100mm thick including mixing the material to
OMC, spreading with motor grader on a prepared base compacting with vibratory road roller to
achieve the desired density including all materials, labor, machinery, etc. complete. Item to
include all incidental work required to execute the job as per MORTH Specifications. The item
shall be measured and paid for the finished volume of granular sub base.
160 cum 1750
20

Providing, laying, spreading and compacting 250mm thick Wet Mix Macadam over GSB as per
the MORTH Specifications including premixing the material with water at OMC in mechanical
mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver on
well prepared surface and compacting with vibratory roller to achieve the desired density. Item
to include all materials, labor, machinery/equipment and incidental work required to complete
the job. The item shall be measured and paid for the finished volume of WMM. 400 cum 1950
21

Providing and laying 50mm thick Bituminous Macadam as per the MORTH Specifications with
VG-30 bitumen using 100-120 TPH hot mix plant producing an average output of 75 tonnes per
hour using crushed aggregates of specified grading premixed with bituminous binder,
transported to site, laid over a previously prepared surface with paver finisher to the required
grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve desired
compaction. Item to include all materials, labor, machinery/equipment and incidental work
required to complete the job. Measurement shall be made for finished volume of bituminous
macadam. 2098.41 sqm 300
22

Providing and laying 25mm thick Semi Dense Bituminous Concrete with VG-30 grade bitumen
using 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ 5 percent of mix
and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per the MORTH
Specifications clause no 508 complete in all respect. Item to include all materials, labor,
machinery/equipment and incidental work required to complete the job. Measurement shall be
made for finished volume of semi dense bituminous concrete. 2098.41 sqm 250
23

Providing and laying 1:3:6 PCC (1 cement: 3 coarse sand: 6 stone aggregate 40mm nominal size)
in the footpath as per the Drawings and Specifications. Item to include all materials, labor,
machinery/equipment and incidental work required to complete the job 1403.63 cum 4347
24
Backfilling behind abutment, wing all and return wall complete as per the Drawings and
Specifications. Item to include all materials, labor, machinery/equipment and incidental work
required to complete the job. 4200.64 cum 219.3
25

Providing and laying of filter Media with granular materials /Stone, crushed aggregates
satisfying the requirements laid down in clause 2504.2.2 of MORTH Specifications to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size towards
the wall and provided over the entire surface behind abutment, wing wall/return wall to the
full height compacted to a firm condition complete as per the drawings and Specifications.
Item to include all materials , labor machinery/equipment and incidental work required to
complete the job. 654.78 cum 1609.2
26

Earth work in excavation of foundation of structure as per the Drawings and specification
including setting out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and back filling with approved material
complete as per MORT&H Specification. item to include all incidental work required to execute
the job.(Rate including Dewatering) 776.4 cum 220
27
Backfilling behind abutment, wing all and return wall complete as per the Drawings and
Specifications. Item to include all materials, labor, machinery/equipment and incidental work
required to complete the job. 642 cum 450
Total
COMPARISION STATEMENT
Contractor Bill Purposed 4th Bill
Quantity as Per MB And Quantity Already paid in
Quantity Already Paid in
y as per Contractor Now to Be paid Purposed 4th Running
3rd Running Bill 3rd Bill
Bill
Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount

4179874.5 59.289 4179874.5 0 0 59.289 4179874.5 59.289 4179874.5

209727 19.974 209727 0 0 19.974 209727 19.974 209727

1663277 216.01 1663277 0 0 216.01 1663277 216.01 1663277

224400 37 7400 1085 217000 522 104400 37 7400

3521767.5 334.8 3230820 30.15 290947.5 334.8 3230820 334.8 3230820

220500 29.4 220500 0 0 35.46 265950 29.4 220500

250035 28.88 216600 4.458 33435 33.358 250185 28.88 216600

171000 76 136800 19 34200 95 171000 76 136800


258300 24 252000 0.6 6300 24.6 258300 24 252000

96720 28.5 85500 3.74 11220 32.24 96720 28.5 85500

17500 7 17500 0 0 7 17500 7 17500

56550 1631.82 48954.6 253.18 7595.4 1631.82 48954.6 1631.82 48954.6

41470 3616.14 39777.54 153.86 1692.46 3616.14 39777.54 3616.14 39777.54

114000 285 114000 0 0 342 136800 285 114000

185250 285 185250 0 0 342 222300 285 185250

188833.5 0 0 1302.3 188833.5 547.64 79407.8 0 0


335575 13.2 40920 95.05 294655 107.89 334459 13.2 40920

630000 314.65 550637.5 45.35 79362.5 314.65 550637.5 314.65 550637.5

280000 160 280000 0 0 163.18 285565 160 280000

780000 400 780000 0 0 407.95 795502.5 400 780000

629523 1600 480000 498.41 149523 1631.82 489546 1600 480000

524602.5 1600 400000 498.41 124602.5 1631.82 407955 1600 400000

6101579.61 0 0 1403.63 6101579.61 1404.81 6106709.07 0 0

921200.352 0 0 4200.64 921200.352 4562.39 1000532.127 0 0


1053671.976 0 0 654.78 1053671.976 296.35 476886.42 0 0

170808 0 0 776.4 170808 776.4 170808 0 0

288900 0 0 642 288900 0 0 0 0


22826164.94 13139538.14 9975526.798 21593594.06 13139538.14
Purposed 4th Bill
Difference in Contractor
Now to be Paid Bill and Purposed 4th
Bill
Quantity Amount Quantity Amount

0 0 0 0

0 0 0 0

0 0 0 0

485 97000 600 120000

0 0 30.15 290947.5

6.06 45450 -6.06 -45450

4.478 33585 -0.02 -150

19 34200 0 0
0.6 6300 0 0

3.74 11220 0 0

0 0 0 0

0 0 253.18 7595.4

0 0 153.86 1692.46

57 22800 -57 -22800

57 37050 -57 -37050

547.64 79407.8 754.66 109425.7


94.69 293539 0.36 1116

0 0 45.35 79362.5

3.18 5565 -3.18 -5565

7.95 15502.5 -7.95 -15502.5

31.82 9546 466.59 139977

31.82 7955 466.59 116647.5

1404.81 6106709.07 -1.18 -5129.459999999

4562.39 1000532.127 -361.75 -79331.775


296.35 476886.42 358.43 576785.556

776.4 170808 0 0

0 0 642 288900
8454055.917 1521470.881