Amit Maindoliya: Well Versed and Acquired Sound Understanding of Basic Electricals
Amit Maindoliya: Well Versed and Acquired Sound Understanding of Basic Electricals
Amit Maindoliya: Well Versed and Acquired Sound Understanding of Basic Electricals
⇒A result oriented professional with over 3.5 years of experience in the areas of Operations & Maintenance,
Installation & Commissioning, & Resource Management.
⇒ Deftness in project monitoring & reviewing project schedules, ensuring cost control within budgeted parameters /
norms.
⇒ Experienced in maintenance / operations of a wide spectrum of equipments and components. Adept at preventive
and breakdown maintenance.
⇒ Well versed and acquired sound understanding of basic electricals.
⇒ An effective communicator with exceptional relationship management skills with ability to relate to people at any
level of business.
EDUCATION
≈ B.Tech. (Electrical) from F.E.T., Haridwar, Gurukula Kangri University (Deemed), Haridwar in July 2006.
≈ German Language - Intermediate Course from SWISS School of Languages at Delhi.
IT Skills: Windows 98 / XP Concepts, MS DOS, MS Office, C, C++, Core Java, Data Structure, AutoCAD, CNC Prog.
CAREER RECITAL
Since April’09 with Munjal Showa Ltd.-HERO HONDA GROUP, Haridwar(UK) as Maintenance Engineer
KEY RESULT AREAS:
Installation & Commissioning
≈ Identifying project bottlenecks and undertaking corrective measures.
≈ Ensuring effective site management and discipline to ensure safe & timely execution of the projects.
≈ Installing and commissioning of equipments, followed by plant trial runs meeting targeted performance/ quality &
quantity parameters and thereafter handing over of the plant.
≈ Responsible for the load calculation & selection of engine, alignment of engine, earth resistance measurement,
bus bar size calculations & power / control panels’ inspection, motor starters selection, IR test & HV test.
≈ Accountable for programming the meters & feeding parameters in relays like PCL1 (-/L-/H), PCM1-G (-/L-/H),
PCM1-M (-/L-/H), MFR 12, GCP-32, etc.
≈ Handling the installation of Cooling Tower, Radiator, Gas Pressure Regulating System, Expansion Tank, 3-Way
Valve, Differential Pressure Switch, Air Relief Valve, Pre-Heater, and Blower Fan.
Maintenance / Operations
≈ Planning and effecting preventive maintenance schedules of various machineries and instruments to increase
machine up time and equipment reliability.
≈ Proactively identifying areas of obstruction/breakdowns and taking steps to rectify the equipments through
application of trouble shooting tools.
≈ Technologically upgrading of the obsolete Machines.
≈ Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction
in O&M expenditures and work within the budget.
≈ Managing the operation & maintenance of Exhaust Heat Recovery Fire Tube Boiler, Vapour Absorption Machine &
Softening Water Plant.
≈ Looking after the routine maintenance of SI-Gas Engine and Brushless Alternator, VCBs, SF6-CB & ACBs, NGRs
etc.
≈ UtilityPower Plant / Diesel Yard / Pump House / Hot water Generator / Chiller / Cooling Tower / Air Compressor
/ RO-Plant / ETP / STP / ATP / Incinerator / De-Plating Section / Scrap Yard / LPG-Yard / Harvesting System /
CO2 Plant / Lifter / Fire Extinguisher system etc. Maintenance Deptt.:Milling M/C, Surface Grinder, Grinder,
Lathe, Bench Vice-150mm
≈ Working on VFD’s like Micromaster-420, AB-Power flex, Yaskawa-V1000/VS-mini-V7/varispeed-F7, VLT-2800,
Automation drive, Mitsubishi-FREQROL-S500, BCH (SINUS-M), ALTIVARI-31(TELEMECHANIQUE), FRENIC-MULTI
M/C ShopMarshell Rapidturn-SLF14DX-Piston rod turning, TPM-Tapping & Drilling, HMT-Rough/Semi/final, 4-
head buffing M/C, RONUK-Fork pipe Cleaning M/C, Quick turn MAZAK-6G(4)-Piston rod turning, Ultrasonic
Washing M/C, Widma M/C-Blank process, ACE DESIGNERS-LT20XL (2)-Oil seal process, WIDMA 2-SPINDLE
COUNTER BORING M/C-BTA Process, AMS(3)-Axle hole process, TPM-Leakage testing, SEAM Welding, UTS
Machine, Projection welding, Spot welding, FRONT ASSY Component Washing, Fork pipe washing, Seat pipe
assembly, Seat pipe insertion, Oil collar insertion, Rebound seat assembly, Rolling, Bottom case cleaning, BC-oil seal
insertion, Socket bolt tightening, Half movement, Stopper ring insertion, Leakage testing, Oil filling, Coller washer
insertion, Fork bolt tightening, Movement insertion, Final inspection, Final length checking, Oil seal greasing, Socket
bolt assembly, MOR pending dispatch, ASSY-REARPiston rod assembly-riveting assembly, Piston rod sub-
assembly–metal joint assembly, Piece/bottom valve assembly, Date stamping m/c, Oil filling m/c, Piston rod
insertion, Rod guide insertion, Rolling m/c, Damping force testing, Collar bush insertion, Spring guide & Rubber
stopper insertion, Hex nut tightening, Main spring &upper shell insertion, Final assembly, Collar bush insertion,
Length checking, Conveyor. PLATING SECTIONScrubbers [3], 2-Bright & 3-semi-bright Filters, 12-Rectifiers[30
W], Chrome exhaust blowers. PAINT SHOPHanger Loading, Hot water Tank, Pre-De-greasing Tank, De-greasing
Tank, Water Rinse 1-3, Surface Conditioning, Phosphating tank, Water Rinse 4-5, Chromatizing Tank, Water rinse 6-
7, DM Water Tank, DM-Mist, Dry Off Oven, TAG RAG Zone, BASE Coat Auto Booth, Base coat manual touch-up booth,
Top coat Auto booth, TOP coat manual touch-up booth, Baking Oven, Unloading Area, Hanger Changing Area.
OthersSludge pit, ASU, Aerobell, Paint Kitchen, Fume Exhaust Blowers, PHE’s, Nitric acid & water flushing tank,
Clarifier, Pneumatic 3-way valves, Chain Conveyor. QUALITY SHOP:Salt Spray M/C-Paint check, Cast Test M/C-
Plating Check, Mounting M/C, Cutting M/C-LABOTOM-3 [STRUERS], Polishing M/C, Weighing M/C[0-300gms],
Contamination M/C, Hot air oven, Hot Water Bath
Spare Parts Management
≈ Designing, implementing and monitoring effective procurement schedules along with finalizing the specifications
of the spare parts and establishing the quality & quantity limits.
≈ Looking after indigenization of the spare parts.
Process Improvement
≈ Streamlining efforts for process enhancement & improving operational methods.
≈ Formulating charts for the easy development of equipments.
≈ Foreseeing performance bottlenecks and taking corrective measures to avoid the same.
Previous Employer: M/s Green power international Pvt. Ltd., Gujarat as Comissioning Engineer-Gas Engine Captive
Power Plants. Duration: 14 Feb 2007 to 15 March 2009
NOTEWORTHY MILESTONES:
≈ Arranged meeting with the Supervisors for site issues and conducted night vigilance.[Previous/Current
employer]
≈ Power plant’s parameter records from all the sites supervisor are known daily and a frequent customer site visit is
done to avoid any unwanted problems. Awareness among the junior one’s & colleagues is done through technical
discussions. Resulted in good relations & enhanced productivity.[Previous employer]
≈ Within first 1.5 years, Got 2 appraisals and a transfer from Gujarat to Delhi HQs [Previous employer]
≈ Kaizens like saving coolant consumptions, using automatic pipe insertion in profile turning m/c etc. are done.
[Current employer]
KEY PROJECTS:
≈ Sun Seeker System / Pre-Paid Energy Meter
INDUSTRIAL TRAINING
PERSONAL VITAE