UDGL Transport Jakarta
UDGL Transport Jakarta
Position of the Dukuh Atas area stated in the upper level plan is shown in Figure-2.2.20
1) Stated Position in the MPA Master Plan Study in JABODETABEK Area
As cooperation agreement for the “Establishing Metropolitan Priority Areas” was signed between
Japanese and the Indonesian government in December, 2010, JICA has started its “Master Plan Study
for Establishing Metropolitan Priority Area for Investment and Industry (MPA) in JABODETABEK
Area” from May, 2011 to set forward the MPA framework.
From the Master Plan Study, The 3rd Steering Committee was held on October, 2012, where the
Dukuh Atas area was chosen as a first priority development area in the “Fast Track Projects: ” As
part of the “A. Better Urban Environment, A1. New public transport System based on the MRT, (4)
Traffic Terminal and Park & Ride development “.
Inside the master plan study, the project goal is to improve accessibility of the citizens to the
amenities located in the stations by solving congestions and to introduce multi-modal facility at the
railway and MRT stations.
Also for the MRT north-south line constructions is stated in the upper master plan of the national
level, MP3EI (Master Plan for the Acceleration and Expansion of Indonesia's Economic Development
2011-2025) , Dukuh Atas area individually is not stated in the national level.
2 - 25
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
Prepare
3.Urban
3. Development Guide Line National Medium-Term
(Pedoman Pembangunan Kota) Development Plan
Draft plan for urban facilities, etc., (RPJMN 2010-2014)
Prepare necessary for new development
Roads, car parks, infrastructure, etc.
Study
4.LRK
4.LRK City Plan Sheet
1:1000 use restriction maps (41 types of use, individual / group)
building area ratios, floor area ratios, height restrictions, set backs,
road widths
Submit B.RTLB
RTLB (submitted by developers)
development
building plan (RTLB (Rencana Tata Letak
Bangunan)
Incentives 1:1000 Spatial layout plans for
Deregulation individual/group buildings for specific
areas
Final development permit
Figure-2.2.20 Land use map DKI Jakarta Province 2008 Source: Study Team
2 - 26
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
2) Position of Dukuh Atas area in the RTRW (Spatial Plan DKI Jakarta) 2011-2030
(1)Current land use
As of 2012, the Dukuh Atas area is zoned as yellow (residential, low rise facilities) use,
separating the purple (business, commercial) use areas to the north and south, and remains within
the high building area ratio development area along Thamrin - Sudirman Road.
In the center of Jakarta commercial and business areas extend linearly only along the main trunk
roads, with the majority of the other areas being high-density residential (Kampung).
Dukuh Atas
2 - 28
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
Dukuh Atas
2 - 29
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
15.Menteng
7.Dukuh Atas
2 - 30
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
Jl.Thamrin
KLB 300%
MRT Station
Planned Area
KLB 500%
KLB 450%
Jl.Sudirman
Bunderan HI
450%~500%
Dukuh Atas
North
180%~450%
Dukuh Atas
South
450%~500%
Setia Budi
450%~500%
Source: http://www.tatakota-jakartaku.net/
Figure-2.2.26 Existing LRK around the area
2 - 31
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
At present in Dukuh Atas, the floor area ratios (KLB:Koefisien Lantai Bangunan) tend to be low
compared with the commercial and business center Bunderan HI subdistrict to the north on the
LRK (City Plan Sheet) and the commercial and residential high-rise center Setia Budi subdistrict
to the south.
The building area ratios (KDB: Koefisien Dasar Bangunan) are set to 40% to 60%, being set
lower the higher the floor area ratio (KLB:Koefisien Lantai Bangunan).
In particular in the north side of the Dukuh Atas area, business use is zoned for both sides of
Thamrin Road only, but areas away from the road are zoned as residential, so the floor area ratios
are low. Also, to the northwest of the area there are landacape restrictions in a part of the Menteng
subdistrict, which is a historical area.
Also, the planned site at MRT Dukuh Atas Station is currently zoned as a green area, so at
present there are no restrictions on floor area ratio and building area ratio. Likewise along the river
there are no restrictions on floor area ratio and building area ratio.
2 - 32
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
4) Land ownership
Most of the land ownership around the Dukuh Atas area is private. Land for roads is all managed
by the Jakarta Provincial Government. In the case of rivers, Banjir Kanal which flows east-west is
managed by the Ministry of Public Works, Directorate General of Water Resources, and rivers
flowing to the Menteng subdistrict in the northeast are owned by the Jakarta Provincial
Government PU.
The Jakarta Provincial Government owns the green strips on the two sides of rivers. Also, the
green area where the MRT Dukuh Atas Station is planned is owned by Jakarta Provincial
Government.
Other publicly owned land includes the approximately 3,000 m2 land where the public market
(PASAR BLORA) is located, which is owned by the public corporation PD PASAR JAYA, which
operates all the public markets.
Planned
MRT Menteng
Station
Pasar
Blora
Banjir Kanal
Private Land
Public Land (PD PASAR JAYA)
Public Land(DGR)
Green Area/Park (DKI PW)
Water Body (MPW)
Water Body (DKI PW)
Road (DKI PW)
Source: Study Team
Figure-2.2.27 Existing Landownership in Dukuh Atas
2 - 33
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
Residential Area
Commercial Area
Green Area / Park
Government Office
Public Facility
Water Body
2 - 34
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
(a) Use
In both the east and west areas, the lots facing a main street are often used as commercial
complexes and offices while the lots in the other areas consist mostly of dwelling houses.
2 - 35
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
2 - 36
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
Galunggung Road
Commercial/business Commercial/business
area area
Waterway jetty
Connects to railway and monorail
stations by pedestrian decks
Composite station
building
Airport access
railway: 3F level, Pedestrian deck
Jabotabek railway: to commercial
1F level buildings
Waterfront
Sudirman Road
Source: JBIC “Basic Survey concerning Railway Station Revitalization" July 2008
Figure-2.2.30 JBIC survey proposals
2 - 37
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
2 - 38
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
Source: www.iai-jakarta.org/
Figure-2.2.31 Dukuh Atas Station Design Competition 2008
2 - 39
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
2 - 40
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
2 - 41
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
In the scheme in this report, to promote TOD, a scheme in which pedestrians have priority is
developed, and a network of pedestrian flow lines within the area is proposed. Also, open spaces
are planned as the entrance spaces to the area, and it is proposed that these be connected by the
pedestrian flow lines. Regarding transport facilities, the MRT, airport access line, BRT
(TransJakarta) Koridor 1, and at the 2008 stage Koridor 4 & 6 in the east direction had started
operation
Open Space
Arcade
Facility
Entrance
Underground
Passage
2 - 42
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
To provide the pedestrian network, pedestrian space provided in the public open space by setting
back the private building side and providing a first-floor overhang is planned separate from the
pedestrian space on the public road side.
2 - 43
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
2 - 44
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
2 - 45
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
Source: PRK Pengembangan Koridor MRT Jakarta versi februari 2012 draft
Figure-2.2.40 Urban Design Guideline Dukuh Atas 2012 (1)
2 - 46
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
Source: PRK Pengembangan Koridor MRT Jakarta versi februari 2012 draft
Figure-2.2.41 Urban Design Guideline Dukuh Atas 2012 (2)
2 - 47
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
For other on going issues, Dukuh Atas has been placed as an area for TOD model, and the
compilation of the Urban Design Guideline is underway to ease mandatory parking
installations imposed on existing large development projects in Jakarta.
The issue of prime importance is an increase in ridership of public transport for both the
Railway Bureau of the Ministry of Transportation and the Indonesian railway company,
MRTJ, and there is no disagreement among the parties concerned on development to enhance
convenience for users such as transfer of trains among multiple lines which will be supported
by developing transfer circulations around Dukuh Atas Station. As regards MRT, although the
urban planning department holds its own image of planning for the areas around MRT stations,
it needs to be consistent with that of the DKI Urban Planning Bureau.
The DKI Transit Bureau, Transjakarta, has perceived problems in the current status of the
greater distance between Dukuh Atas Stations 1 and 2 and the insufficiency of station space
and connection passages for the large volume of users and has agreed on the transfer of buses
onto an artificial ground in view of the flow of users after the opening of the MRT north-south
line. The DKI Transit Bureau understands the policy on Dukuh Atas as the TOD area of the
DKI Urban Planning Bureau; it has raised a question, however, on the easement of the
mandatory parking installation in conjunction with the CAT function of the airport line.
2 - 48
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
Dukuh Atas
Bekasi
Serpong
Airport Express
Loopline
Dukuh Atas
Serpong Bekasi
Short-Cut
Bekasi
Railway 750m radius
MRT 500m radius
BRT 250m radius
Serpong
Figure-2.2.43 Public Transportation Network in Year 2030 (Source: Study Team)
2 - 49
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
2 - 50
JAKARTA INTEGRATED
URBAN TRANSPORT HUB DEVELOPMENT Final Report
Source: Engineering Consulting Services for Jakarta Mass Transit System Project
Figure-2.2.45 MRT Dukuh Atas Station Basic Design Drawing
2 - 51
JAKARTA INTEGRATED
Final Report URBAN TRANSPORT HUB DEVELOPMENT
Source: Preparatory survey for Jakarta Mass Rapid Transit East-West Line Project 2011, 11 JICA
Figure-2.2.46 Mass Rapid Transit East-West Line
2 - 52