0% found this document useful (0 votes)
49 views4 pages

Time (Sec) Process Variable (%) OP (%)

The document contains data from multiple experiments measuring process variable percentage and output percentage over time. The first experiment shows the process variable and output remaining steady for the first 30 seconds and then the output decreasing to 50% from 70% after 30 seconds. The second experiment involves servo operation and shows the process variable increasing and output decreasing over time. The third experiment shows similar steady levels for the process variable and output over time. The fourth experiment also shows the process variable generally increasing and output decreasing over the course of the experiment.

Uploaded by

niveatha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views4 pages

Time (Sec) Process Variable (%) OP (%)

The document contains data from multiple experiments measuring process variable percentage and output percentage over time. The first experiment shows the process variable and output remaining steady for the first 30 seconds and then the output decreasing to 50% from 70% after 30 seconds. The second experiment involves servo operation and shows the process variable increasing and output decreasing over time. The third experiment shows similar steady levels for the process variable and output over time. The fourth experiment also shows the process variable generally increasing and output decreasing over the course of the experiment.

Uploaded by

niveatha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Time(sec) Process Variable (%) OP (%)

1 40 70

5 40 70

10 39.9 70

15 40 70

20 40 70

25 40 70

30 40 50

35 53.8 50

40 58.8 50

45 59.2 50

50 59.3 50

55 59.2 50

60 59.3 50

65 59.4 50

70 59.4 50

75 59.4 50

80 59.2 50

85 59.3 50

90 59.4 50

Servo operation Regulatory operation

Time(sec) Process OP (%) Time(sec) Process OP (%)


Variable (%) Variable (%)

1 50.1 62.4 1 50.5 63.7


10 60.6 48.1 10 50.5 63.7

20 61.6 46.4 20 50.3 63.7

30 62.9 45.1 30 50.2 63.8

40 63.7 43.7 40 39.9 52.4

50 64.4 42.2 50 54.5 65

60 65.1 41.1 60 51.1 61.7

70 65.5 40 70 51.2 62.2

80 65.8 38.8 80 50.9 62.2

90 66.4 38.1 90 50.8 62.4

100 66.6 37.2 100 50.7 62.6

110 67 36.5 110 50.4 62.5

120 67.4 36 120 50.4 62.5

130 67.6 35.3 130 50.4 62.5

140 67.8 34.8 140 50.2 62.2

150 67.9 34.1 150 50.3 62.3

160 68.2 33.7 160 50.1 62

170 68.3 33.2 170 50.1 62

180 68.3 32.7 180 50.1 62

Time(sec) Process Variable (%) OP (%)

1 55.6 55.6

20 64.4 44.4

40 64.3 44.3

60 64.4 44.3

80 64.3 44.3
100 64.3 44.3

120 64.3 44.3

140 64.6 44.7

160 64.6 44.7

180 64.6 44.7

200 64.7 44.8

220 64.7 44.8

240 64.8 44.8

260 64.8 44.9

280 64.8 44.9

300 64.8 44.9

320 64.8 44.9

340 64.8 44.9

Time(sec) Process Variable (%) OP (%)

1 50.1 62.4

20 60.6 48.1

40 62.9 45.1

60 64.2 42.5

80 65.6 44.4

100 66.3 38.4

120 66.9 36.6

140 67.6 35.4

160 67.9 34.2

180 68.2 33.3


200 68.4 32.3

220 68.9 32

240 69.2 31

260 69.2 30.9

280 69.2 30.9

300 69.5 29.6

320 69.6 28

340 69.8 28.3

360 70 28.8

You might also like