Basc - 05 Officers
Basc - 05 Officers
BI/6068 Jul 19
3. New ASKOI-02 has been recently procured and the undersigned was
nominated for training on the same by Russian Specialist at NAD (Mbi) from 15 Jul
19 to 31 Jul 19. The training covered both theoretical aspects of the ASKOI system
followed by practical sessions onboard different ships. The technical report by the
OEM on commissioning of ASKOI-02 produced by OEM is placed at Enclosure I.
(a) While carrying out checks, ASKOI-02 records data from KASU and the
feedback received from the Missile by KASU. As part of this, ASKOI-02 records
real time dynamic parameters of ship viz. Course, List and Trim data of Ship
coming from KASU (which is received as input from the ship’s navigation
system) and data coming from Missile as feedback and plots them against
time to analyze the data.
the angle of list received from the article as registered in ASKOI-02 is (–)θ, at
the same moment in time. The figure below illustrates this phenomenon: -
(c) OEM stated that such errors influence the procedure of initial pre-
setting of the article, which could lead to misfire of the article while firing. The
plots of List and Trim obtained by ASKOI-02 onboard INS Brahmaputra and
INS Prabal along with acceptable graphs obtained onboard INS Mysore are
placed at Appendix A.
(d) The OEM mentioned that the feed given by RLG system is not
compatible with KASU, as compatibility checks of information exchange
between KASU and newly fitted RLG (manufactured in France) has not been
performed and recommended not to carry out firing of Uran Missile
from ships fitted with RLG till this issue is resolved.
5. Discussion with OEM. During the discussions with OEM, following were
brought out:
(V R Praveen Kumar)
Lieutenant
Naval Armament Inspecting Officer
for Controller of Naval Armament Inspection (W)
Appendix: - As above
Enclosure: - As above
Copy to:-
Appendix ‘A’
(refers to Para 4(c) of
CNAI(W) Letter BI/6068 dated Jul 19)
List vs Time
Trim vs Time
List vs Time
Trim vs Time
8
List vs Time
Trim vs Time
9
Enclosure I
(refers to Para 3 of
CNAI(W) Letter BI/6068 dated Jul 19)
10