Turbine Drains SOP
Turbine Drains SOP
Turbine Drains SOP
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 1 of 6
FOR
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 2 of 6
SAFTEY PRECAUTIONS:
Ensure no permit to work is pending on regarding this system by checking with
EE/MRSE.
SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 3 of 6
All extractions MOV and NRV drains Pneumatic and MIV are in
7. Open
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 4 of 6
OPERATING PROCEDURE -
RESPONSIBILITY
Sr.
Description SIC / DE FE EE
No.
UCE
PRE- START CHECKS :-
1. All permits and cross permits have been returned.
2. The Air supply Pressure of Pneumatic drain valves is 0.45 – 0.8 MPa (g)
5. All Turbine Proper and Pipes Pneumatic and MIV’s are in Open
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 5 of 6
UNIT START UP :-
1. DEH Control system will Open the pneumatic drain valves on each drain
branch automatically
5. HP & LP bypass , CRH ,HRH,TDBFP drain line Provided with drain pot
with water level control for Automatically Open when level is high
SHUTDOWN SEQUENCE :-
1. Load is reduced up to 30% rated load , Automatically Open the
pneumatic drain valves on the LP section
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 6 of 6
ABRIVIATIONS / NOTATIONS :-