Mechanical Data Sheet V-001 PDF

This 3 sentence summary provides the key details about a gas compressor bottle from the supplied document: The datasheet outlines the specifications for a horizontal gas compressor bottle tagged as V-001, including dimensions, materials, pressures and temperatures for design and operation, internal components, and coatings. The bottle will be used for a production facility project for TAC Pertamina-BWP Meruap Pte Ltd and manufactured according to ASME Section VIII standards. Internal and external connections and supports are specified.

Uploaded by

dharwin ap
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
556 views3 pages

Mechanical Data Sheet V-001 PDF

This 3 sentence summary provides the key details about a gas compressor bottle from the supplied document: The datasheet outlines the specifications for a horizontal gas compressor bottle tagged as V-001, including dimensions, materials, pressures and temperatures for design and operation, internal components, and coatings. The bottle will be used for a production facility project for TAC Pertamina-BWP Meruap Pte Ltd and manufactured according to ASME Section VIII standards. Internal and external connections and supports are specified.

Uploaded by

dharwin ap
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Project Production Facility Project

Client TAC Pertamina-BWP Meruap Pt


TAC PERTAMINA Jobe Code # D750
Item # V-001
BWP MERUAP Pte.Ltd DataSheet # S750-EM-0004-EM01-0012
Page # 01 Of 03

PT. BAHANA KARYA MANDIRI

DATASHEET FOR : : GAS COMPRESSOR BOTTLE


:
TAG NO : V-001

UNIT : 1

PROJECT : Production Facility Project

Job Code : D750

CLIENT : TAC Pertamina-BWP Meruap Pte Ltd

INSTALLATION COUNTRY : Indonesia

PROJ.
MECH.
STRU.
1 20.03.2015 CHANGE MATERIAL & ADDED NOTES RA DD SD PIPING.
0 12.01.2015 ISSUED FOR PROPOSAL RA DD SD PROC.
Rev Date Description PREPARED CHECKED APPD DISCIPLINES
Project Production Facility Project
TAC PERTAMINA Client TAC Pertamina-BWP Meruap Pt
Enquiry # Gas Compressore Bottle
BWP MERUAP Pte.Ltd Item # V-001
DataSheet # S750-EM-0004-EM01-0012
Page # 02 Of 03
1 P&ID No D785-P-DW-0003 APPLICATION GAS COMPRESSOR BOTTLE
2 Job No. V-001 ORIENTATION Horizontal
3 DESIGN CONDITIONS
4 CODE ASME VIII U STAMPED OTHERS
5 DESIGN PRESSURE 16,00 barG DESIGN TEMPERATURE, Max / Min 100,00 °C / -29 °C
6 HYDROTEST PRESSURE 20,8 barG NACE MR0175 / ISO 15156:2009 YES NO
7 CORROSION ALLOWANCE 3,0 mm RADIOGRAPHY RT-1 MILL TEST CERT. YES NO
8 SHELL JOINT EFFICIENCY 1,0 INSPECTION AUTHORITY ASME AUTHORISED INSPECTOR
9 POST WELD HEAT TREATMENT AS PER CODE POST FORMING HEAT TREATMENT AS PER CODE
10 CONSTRUCTION
11 DIAMETER 324 mm OD
12 WALL THICKNESS 9,50 mm N4 Pipe Cap
13 LENGTH 1350 mm S/S
14 TYPE HORIZONTAL
15 MATERIAL
16 SHELL Standard CS
17 HEADS Standard CS
18 NOZZLES Standard CS
19 INTERNALS
20 SUPPORTS SA36
21 MISC
22 SUPPORT
23 MANHOLE COVER YES DAVIT YES
24 HANDHOLES As Per Code
25 INSULATION CLEATS YES N2
26 LADDER CLIPS YES
27 LIFTING LUGS YES Qty : 2 Nos
28 EARTHING BOSS/LUG YES Qty : 2 Nos
29
30 PAINTING AND INSULATION
31 SURFACE EXT. AS PER SSPC-SP10
32 PREPARATION INT. NONE
33 EXTERNAL PAINTING EPOXY PHENOLIC
34 INTERNAL COATING NONE
35 INSULATION NONE
36 NOZZLE SCHEDULE
37 NOZZLE ID SIZE RATING SERVICE
38 N1 6"[150] 150#RF Gas Intlet
39 N2 6"[150] 150#RF Gas Outlet
40 N3 2"[50] 150#RF Drain c/w Blind N1 N3
41 N4 2"[50] 150#RF Pressure Indicator
42
43
44
45
46
47
48
49
Note:

PROJ.
MECH.
STRU.
1 20.03.2015 CHANGE MATERIAL & ADDED NOTES RA DD SD PIPING.
0 12.01.2015 ISSUED FOR PROPOSAL RA DD SD PROC.
Rev Date Description PREPARED CHECKED APPD DISCIPLINES
Project Production Facility Project
TAC PERTAMINA Client TAC Pertamina-BWP Meruap Pt
Jobe Code # D750
BWP MERUAP Pte.Ltd Item # V-001
DataSheet # S750-EM-0004-EM01-0012
Page # 03 Of 03
1 OPERATING CONDITIONS INTERNALS
2 Max Normal Min Units INLET DEVICE
3 PRESSURE 10,20 10,00 9,55 barG VANE TYPE DIVERTER
4 TEMPERATURE - 70,00 - °C CYCLONIC TYPE HALF OPEN PIPE
5 OTHERS WEIR PLATE
6 GAS PROPERTIES Choke Baffle
7 Max Normal Min UNITS MATERIAL OF CONSTRUCTION:
8 MASS FLOW lb/h
9 FLOWRATE, STD 5,48 5,48 5,48 MMSCFD GAS - LIQUID SEPARATION
10 SPECIFIC GRAVITY 1,56 1,56 1,56 VANE PACK MESH PAD
11 MW 45,07 45,07 45,07 lb/lbmol CYCLONE TUBE FILTER ELEMENTS
12 VISCOSITY cP OTHERS
13 COMPRESSIBILITY 0,91 0,91 0,91
14 MATERIAL OF CONSTRUCTION:
15 LIQUID HYDROCARBON PROPERTIES
16 Max Normal Min UNITS OIL - WATER SEPARATION
17 FLOWRATE, ACT BPD COALESCER PACK
18 DENSITY lb/ft3 COALESCING ELEMENTS
19 VISCOSITY cP ELECTROSTATIC GRIDS
20 SURFACE TENSION dyne/cm
21 MATERIAL OF CONSTRUCTION:
22
23 OTHER (specify)
24 VORTEX BREAKER
25
26 MATERIAL OF CONSTRUCTION:
27
28 LOADING
29 WIND LOAD : UBC-94/97
30 EARTHQUAKE : UBC-97
31 SNOW REACTION
32 WRC-107 BULETIN
33 SHIP MOTION
34
35
36
37
38
39 Note :
40 1 The minimum Bottle Thickness to be considered as minimum 8 mm
41 2 Vessel to certified by ASME Authorized Inspector
42 3 Shop Hydrotest pressure base on ASME Sect. VIII, Div.1.
43 4 External stud bolts and nuts to be SA 193 Gr.B7/ SA 194 Gr.2H with 2 nuts heavy series (Hot Dipped Galvanized)
44 5 Internal bolt to be SA 193 Gr.B8M c/w SA 194 Gr.8M (with 2 nuts)
45 6 External Painting as per manufacture standard
46
47
48
49
50
51
PROJ.
MECH.
STRU.
1 20.03.2015 CHANGE MATERIAL & ADDED NOTES RA DD SD PIPING.
0 12.01.2015 ISSUED FOR PROPOSAL RA DD SD PROC.
Rev Date Description PREPARED CHECKED APPD DISCIPLINES