The document is a logsheet for turbine operations at a power plant. It records operational parameters of the turbine such as speed, power output, temperatures, pressures, and valve positions over three-hour intervals throughout a 24-hour period. The logsheet contains sections to record readings from the main steam system, feedwater system, governing system, bearing temperatures, lube oil system, and condenser. It will be used to monitor the turbine's performance and detect any issues that require maintenance or troubleshooting.

Uploaded by

KeniBatara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
324 views7 pages

02 Logsheet Turbin Desk

The document is a logsheet for turbine operations at a power plant. It records operational parameters of the turbine such as speed, power output, temperatures, pressures, and valve positions over three-hour intervals throughout a 24-hour period. The logsheet contains sections to record readings from the main steam system, feedwater system, governing system, bearing temperatures, lube oil system, and condenser. It will be used to monitor the turbine's performance and detect any issues that require maintenance or troubleshooting.

Uploaded by

KeniBatara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

PT PLN (PERSERO) UNIT PELAKSANA PEMBANGKITAN SEBALANG

DOKUMEN CATATAN
LOGSHEET TURBIN DESK
SPV OPERASI
No. Dokumen : : FM/A.02/04-02 Tanggal Terbit : 25-02-2019 Revisi : 1 Halaman : 1 dari 5

Unit :
Tanggal : / /

DAYA DAYA POWER ARUS GENERATOR TEGANGAN GENERATOR EKSITASI WINDING TEMPERATURE GENERATOR HOT AIR TEMPERATURE

JAM AKTIF REAKTIF FAKTOR R S T R-S S-T T-R Teg Arus 1 3 5 7 9 11 Zone 1 Zone 2 Zone 3 Zone 4

(MW) (MVAR) (COS Q) (A) (A) (A) (KV) (KV) (KV) (V) (A) (°C) (°C) (°C) (°C) (°C) (°C) (°C) (°C) (°C) (°C)

HH

Normal

LL

00:00

01:00

02:00

03:00

04:00

05:00

06:00

07:00

08:00

09:00

10:00

11:00

12:00

13:00

14:00

15:00

16:00

17:00

18:00
19:00

20:00

21:00

22:00

23:00
PT PLN (PERSERO) UNIT PELAKSANA PEMBANGKITAN SEBALANG

DOKUMEN CATATAN

LOGSHEET TURBIN DESK

SPV OPERASI
No. Dokumen : : FM/A.02/04-02 Tanggal Terbit : 25-02-2019 Revisi : 1 Halaman : 2 dari 5

Unit :
Tanggal : / /

DEH Sistem TURBINE BEARING TEMPERATURE LUBE OIL


GENERATOR GLAND
MAIN STEAM FEED WATER GOV. VALVE POSITION
SPEED Press EH THRUST JOURNAL AIR COOLER STEAM LEVEL INLET COOLER OTLET COOLER
Level Anti
TIME Thrust
Press Temp Flow Press Flow A B Oli EH CV 1 CV 2 CV 3 CV 4 Upper Lower 1 2 3 4 5 6 Turbin Excitr Press Temo Press Temp Press Temp

rpm MPa °C T/h Mpa t/h Mpa Mpa N/TN % % % % °C °C °C °C °C °C °C °C °C °C °C kPa °C kg/cm2 °C kg/cm2 °C

HH 3330 11.88 560 436 503 110 110 110 115 115 115 115 115 115 >400 >200 >55 >55

H 3300 10.29 545 >415 > 420 100 105 105 105 105 105 105 105 105 105 130 130 400 >1,2 55 >1,2 55

Normal 3000 8.83 535 415 94.5 415 13.5 13.5 N 80 80 65 80 57 62 50 57 49 30-35 30-35 125 280-350 0,8-1,2 35-45 0,8-1,2 35-45

L 2850 <535 11.2 11.2 250 -180 0.56 25 0.56 25

LL 7.8 7.8 <250 -230 0.15 <25 0.15 <25

00.00

01.00

02.00

03.00

04.00

05.00

06.00

07.00

08.00

09.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00
20.00

21.00

22.00

23.00
Catatan :
PT PLN (PERSERO) UNIT PELAKSANA PEMBANGKITAN SEBALANG

DOKUMEN CATATAN

LOGSHEET TURBIN DESK

SPV OPERASI
No. Dokumen : : FM/A.02/04-02 Tanggal Terbit : 25-02-2019 Revisi : 1 Halaman : 3 dari 5

Unit :

Tanggal : / /

BFP - A BFP - B
CWP - A CWP - B CP CONDENSOR CCWP VP - A VP - B Cond.
Press Jury Press Jury
Time Vacum
Arus Disch Arus Disch Arus A Arus B Disch Flow Level Temp Arus Disch V Spd Rotation Pump A Pump B Arus Disch V Spd Rotation Pump A Pump B Arus A Arus B Disch Arus Arus

A kg/cm² A kg/cm² A A kg/cm² m3/h mm °C A kg/cm² % Rpm A kg/cm² % Rpm A A kg/cm² A A Kpa

Max 105 105 26.8 26.8 403 1800 45 333 2895 333 2895 162 162 218 218

Normal 90 90 20 20 1500 40 213 100 213 100 140 140 200 200 -93

Min 300 -60

00.00

01.00

02.00

03.00

04.00

05.00

06.00

07.00

08.00

09.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00
19.00

20.00

21.00

22.00

23.00
No. dokumen : FR-PT-SBLG
PT. PLN (Persero)
PEMBANGKITAN SUMBAGSEL
SEKTOR SEBALANG
LOGSHEET BOILER CONTROL ROOM No. Revisi :
Tanggal :
PLN (PERSERO) Unit :
OR SEBALANG
Tanggal : / /
PAF - A PAF - B SAF - A SAF - B HP FLUIDIZED FAN IDF - A IDF - B FLUE GAS
ESP OUT PRESS
Time FLOW PRESS ARUS REG PRESS ARUS REG FLOW PRESS ARUS REG SPEED PRESS ARUS REG SPEED FLOW PRESS A B C REG SPEED ARUS REG SPEED ARUS EXCESS ECO OUT PRESS ECO OUT TEMP AIR PREHEATER OUT
Nm3/h kPa A % kPa A % Nm3/h kPa A % % kPa A % % Nm3/h kPa A A A % % A % % A % L (Pa) R (Pa) L (°C) R (°C) L (°C) R (°C) L (Pa) R (Pa)
Max
Normal
Min

00.00
01.00
02.00
03.00
04.00
05.00
06.00
07.00
08.00
09.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

SOOT BLOWING : START : STOP: TIME SHIFT OPERATOR SIGN SPV SIGN ASMAN OPERASI
CATATAN 07.30 - 15.30
15.30 - 22.30
22.30 - 07.30
PT. PLN (Persero) No. dokumen : FR-PT-SBLG
PEMBANGKITAN SUMBAGSEL
SEKTOR SEBALANG
LOGSHEET BOILER CONTROL ROOM No. Revisi :
Tanggal :
PLN (PERSERO)
Unit :
OR SEBALANG
Tanggal : / /

MAIN STEAM FURNACE BED CYCLONE OUT SLAG CEM FLUE GAS
LOAD COAL FLOW T/h DP BED PRESS COOLER SORBENT
TIME PRESS TEMP FLOW FRONT REAR PRESS TEMP TEMP SPEED O2 CO SO2 NOX OPACITY 1 OPACITY 2
SPEED
MW Mpa °C t/h A B C D °C °C Pa °C L (kPa) R (kPa) L (°C) R (°C) A (%) B (%) % (%) (ppm) (ppm) (ppm) (mg/m3) (mg/m3)
Max
Min
00.00
01.00
02.00
03.00
04.00
05.00
06.00
07.00
08.00
09.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

CATATAN TIME SHIFT OPERATOR SIGN SUPERVISOR SIGN ASMAN OPERASI


07.30 - 15.30
15.30 - 22.30
22.30 - 07.30
PT PLN (PERSERO) UNIT PELAKSANA PEMBANGKITAN SEBALANG

DOKUMEN CATATAN

LOGSHEET TURBIN DESK

SPV OPERASI
No. Dokumen : : FM/A.02/04-02 Tanggal Terbit : 25-02-2019 Revisi : 1 Halaman : 4 dari 5

Unit :

Tanggal : / /

THERMAL AXIAL DIFFERENTIAL EXPANSION BEARING VIBRATION


ECCEN EXPANSION DISPLACEMENT HP Turbin LP Turbin Bearing No. 1 Bearing No. 2 Bearing No. 3 Bearing No. 4 Bearing No. 5 Bearing No. 6
TIME TRICITY
Left Right 1 2 A B A B X Y Cover X Y Cover X Y Cover X Y Cover X Y Cover X Y Cover

µm mm mm mm mm mm mm mm mm µm µm µm µm µm µm µm µm µm µm µm µm µm µm µm µm µm µm

HH 120 35 35 1.4 1.4 3.5 3.5 3.5 3.5 202 202 80 202 202 80 202 202 80 202 202 80 202 202 80 202 202 80

H 76 35 35 0.8 0.8 3.0 3.0 3.0 3.0 126 126 50 126 126 50 126 126 50 126 126 50 126 126 50 126 126 50

00.00

01.00

02.00

03.00

04.00

05.00

06.00

07.00

08.00

09.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

21.00

22.00

23.00
Catatan :
PT PLN (PERSERO) UNIT PELAKSANA PEMBANGKITAN SEBALANG

DOKUMEN CATATAN

LOGSHEET TURBIN DESK

SPV OPERASI

No. Dokumen : : FM/A.02/04-02 Tanggal Terbit : 25-02-2019 Revisi : 1 Halaman : 5 dari 5

UNIT :
TANGGAL : / /

NO JAM REGU KELAINAN / GANGGUAN NO JAM REGU FLM (FISRT LINE MAINTENANCE)

1 1

2 2

3 3

4 4

5 5

NO JAM REGU MANUVER PERALATAN NO JAM REGU LOTO

1 1

2 2

3 3

4 4

5 5

NO JAM REGU CHANGE OVER NO JAM REGU KEGIATAN 5S

1 1

2 2

3 3

4 4

5 5

PARAF
JAM KERJA REGU OPERATOR
* OPR SPV
07:30 - 15:30

15:30 - 22:30

22:30 - 08:00

You might also like