Fuel Gas System PDF
Fuel Gas System PDF
TABLE OF CONTENT
) BOOK 111
4.6.11.3 DETAILED REQUIREMENTS ....... ........... ........ ........ .... ..... ..... ...... ... 2
4.6.11.3.1 GENERAL ...................................... ....... ....... .. ............ . 2
4.6.11.3.2 FILTER-SEPARATORS ....... .. ............ .......... ........ ....... 4
4.6.11.3.3 FLOW METERING .... ....... ....... .. ......... ......... .. ............. . 4
4.6.11.3.4 GAS PRESSURE REGULATING VALVE ................... 5
4.6.11 .3.5 FUEL GAS HEAT EXCHANGER ................... ..... ... .. .. . 5
-) 4.6.11.3.6 FUEL GAS PIPING .. .... .. .......................................... ... 6
4.6.11.3.7 FUEL GAS BOOSTING SYSTEM (IF REQUIRED) .. ... 8
4.6.11.3.8 PAINTING AND PROTECTIVE COATING .. .. ... .. .. ... .. .. 9
4.6.11.3.9 CONDENSATE DRAIN TANK ................... ............. ..... 9
4.6.11.3.10 CONDENSATE DRAIN PUMP ......... ........................... 9
4.6.11.3.11 ONLINE H2S ANALYZER, SPECIFIC GRAFITY
METER AND GAS CHROMATOGRAPH ... ........ .. .... .... ...... ......... .. ... 9
J
Revision 0 Sub-Sec 4.6.11 - i
Lampung Combined Cycle Power Plant 200 MW
BOOKIII
Part 4 Technical Requirements
Section 4.6 Mechanical Works
Sub-Section 4.6.11 Fuel Gas System
The fuel gas supply system will be provided by Gas Supplier. The fuel
gas supply system will be provided by others and it is not included in
the scope of work of the Bidder. The fuel gas system will be scope of
work of the Bidder.
The fuel gas system connection point will be at the Power Plant
boundary.
The fuel gas system shall be completed in every respect and suitable
for safe, reliable and continuous operation. All materials and equipment
shall be provided as are required to make a complete, properly
functioning installation and shall confirm to the highest standards of
engineering design and workmanship.
All gas turbines governing and protection systems shall remain fully
operative at any condition.
4.6.11.3.1 GENERAL
The Bidder shall provide the complete fuel gas system within the Power
Plant. This shall include fuel gas supply piping to the ending at gas
turbines control valve.
Revision 0 Sul>-Sec 4 .6.11 - 2
Lampung Combined Cycle Power Plant 200 MW
BOOKIII
Part 4 Technical Requirements
Section 4.6 Mechanical Works
Sub-Section 4.6.11 Fuel Gas System
) All the equipment shall be fitted with isolating valves to permit repair
and maintenance without interrupting the gas supply.
All isolating valves shall be ball type with double block and bleed
function .
The bidder shall design, supply and erect the fuel gas system as
required by the gas turbine operations.
)
Equipment for controlling the gas supply pressure within the specified
limits in the event of an emergency shutdown from the Power Plant
shall be provided.
Materials for the fuel gas system shall be selected to avoid sulphide
stress cracking and/or corrosion resulting from impurities in the fuel
gas.
_)
Revision 0 Sub-Sec 4.6.11 - 3
Lampung Combined Cycle Power Plant 200 MW
BOOKIII
Part 4 Technical Requirements
Section 4.6 Mechanical Works
Sub-Section 4.6.11 Fuel Gas System
4.6.11.3.2 FILTER-SEPARATORS
The filter separator shall be fitted with drain valves, a lockable vent
valve connection leading to the vent system, a pressure safety valve
and a vessel purge connection.
The function of flow metering is to measure and record the total gas
consumption of the unit The line metering shall have independent
pressure and temperature measuring tapping used for converting gas
quantity from actual pressure to standard pressure and temperature
quantity.
Specific gravity of the fuel gas shall be considered for the above
conversion .
The flow metering shall have a tariff metering accuracy (within 0.5%
from minimum to maximum) and shall comply with API Chapter 14,
section 3 (AGA Report #3, Gas producers association 8185-90)
specification.
)
Revision O Sub-Sec 4.6.11 - 4
Lampung Combined Cycle Power Plant 200 MW
BOOKIII
Part 4 Technical Requirements
Section 4.6 Mechanical Works
Sub-Section 4.6.11 Fuel Gas System
The main flow meter (common) shall be suitable with Gas Turbines
with necessary inspection facility.
The gas velocity through the valves shall be such that the noise level
shall not exceed 85 dBA measured at a distance of 1 meter.
The heat exchangers shall contain stainless steel tube bundles and
) tube sheets through which the gas will flow.
Bidder shall design furnish complete gas heater suitable for Fuel gas
heating before burning in the combustion chamber of Gas Turbine.
The piping work shall be designed and supplied in accordance with the
requirements of the specification Sub-Section 4.6.1.
All pipes downstream the final filter up to Gas Turbines inlet shall be of
stainless steel.
All butt welds of the fuel gas supply system shall be subject to 100%
radiography test and all other welds shall be subject to 100% non
destructive testing .
All pipe work shall be tested hydraulically to at least 1.5 times the
design pressure for at least 1 hours, or a leak test with air to 1.1 times
the design pressure for at least 2 hours shall be performed.
The hydrostatic test of the pipe work shall be carried out with skids
isolated from the pipe work. Skids shall be tested separately before
installation and connection to pipe work.
The internal surface of all pipes in this system shall be cleaned and
dried after hydraulic testing to the satisfaction of the Owner.
After reconnection of the pipe work, all joints (particularly those not
previously tested on site or in the factory) on the pipe work and skids
shall be air leak tested at full maximum working pressure. After this test
the pipe work shall be dried with dry compressed air and on completion
the system shall be pressurized with nitrogen.
All the gas lines shall be sloped to drain to a series of drain valves
) located at suitable points. These drain valves shall be lockable.
Isolating valves shall be of the ball type with double block and bleed
function .
Pressure Vessels
welds shall be subject to 100 % radiography test and all other welds
shall be subject to 100 % non-destructive testing.
In case that the fuel gas supply pressure is inadequate for the
operation of the gas turbine, gas booster compressors shall be
provided to compress the available fuel gas.
The drive motors and all other E-motors shall be of explosion proof
design, as far as required by the hazardous zone classification.
The gas compressor stations shall comply with the Gas Turbines
demand at all defined load conditions from start up to full load
operation.
The fuel gas boosting systems must be able to satisfy the max. Gas
Turbines demand at worst compressor inlet conditions.
)
Revision o Sub-Sec 4.6.11 - 8
Lampung Combined Cycle Power Plant 200 MW
BOOKIII
Part 4 Technical Requirements
Section 4.6 Mechanical Works
Sub-Section 4.6.11 Fuel Gas System
)
Before shipment, all parts of the equipment shall be thoroughly cleaned
of all mill scale, rust, grease and other foreign matter and shall be
painted as specified below.