Assignment#5: PSA LAB Muhammad Nouman Saleem (2015-EE-36)
Assignment#5: PSA LAB Muhammad Nouman Saleem (2015-EE-36)
Model 12 bus system, shown in above diagram, in PWS. Name and numbering of each bus must
be properly assigned, as shown. {-2} For each bus, add following fields on the one-line
Diagram. {-4} Bus Name. Bus voltage (pp.). Bus voltage angle.
For each branch, add following fields on the one-li
ne diagram
{-3}
MW and MVAR flow at both ends. MVA limit (Show at the center of the branch)
Pie charts to display %age loading.
Add snaps of the system after completing the implem
Enation.
Task #2:
Perform the load flow analysis of the system. [10] Use contouring function to show voltage
profile of the system. Add snaps of the system after applying contouring function. {-4}.
If voltage is either very low (less than 0.95 up) or high (above 1.05 up), correct this
Problem. Add snaps of system after all these modifications.
Task # 3.
Perform 3-φ short circuit analysis on any bus to generate Bus of the system. [5]
Add print screen image of Positive sequence Y
Bus generated by PWS. {-3}
Task # 4.
Export the Ybus in Matlab and find Zbus by inverting Bus . [5]
Add snaps of the Zbus displayed in Matlab command window. {-5}
Pop out command window from Mat lab window so that a
All the columns get displayed in one window.
Zbus =