Perencanaan Dengan Metode Analisa Komponen
Perencanaan Dengan Metode Analisa Komponen
Perencanaan Dengan Metode Analisa Komponen
Total Beban
Tipe Nama Kedaraan Komposisi (%) Jumlah
(ton)
1 Kendaraan Penumpang 2 46 20251.2
2 Truk Kecil (T1.2L) 8 6 2701.2
3 Truk 2 as (T1.2H) 20 10 4501.2
4 Truk 3 as (t1.22) 20 5 2251.2
5 Truk 4 as (T1.222) 20 1 451.2
6 Truk Gandengan (T1.2+22) 25 5 2251.2
7 Truk Gandengan (T1.22+22) 30 5 2251.2
8 Trailer (T1.2-1) 32 5 2251.2
9 Trailer (T1.2-22) 32 5 2251.2
10 Trailer (T1.2-222) 32 1 451.2
11 Trailer (T1.22-22) 42 5 2251.2
12 Trailer (T1.22-222) 42 1 451.2
13 Bus 7 5 2251.2
14 Bus 12 1 451.2
Jumlah Total 45016.8