1. The reliability of the parallel production process is 0.9504.
2. The reliability of Elizabeth Irwin's proposed system is 0.972.
3. The reliability of the new temperature controller system is 0.9936. With improved backup units at 0.93, the reliability is 0.9984.
4. Design B has a higher reliability than Design A due to its backup units for components R3 and R4.
1. The reliability of the parallel production process is 0.9504.
2. The reliability of Elizabeth Irwin's proposed system is 0.972.
3. The reliability of the new temperature controller system is 0.9936. With improved backup units at 0.93, the reliability is 0.9984.
4. Design B has a higher reliability than Design A due to its backup units for components R3 and R4.
Soldering Systems, Inc. (WSSI), has provided you with a proposal for improving the temperature control on your present machine. The machine uses 3. Elizabeth Irwin’s design team has a hot-air knife to cleanly remove excess proposed the following system with solder from printed circuit boards; this is component reliabilities as indicated: a great concept, but the hot-air temperature control lacks reliability. According to Wing, engineers at WSSI have improved the reliability of the critical temperature controls. The new system still has the four sensitive, integrated circuits controlling the What is the reliability of the system? temperature, but the new machine has a Hint: The system functions if either R2 backup for each. The four integrated or R3 work. circuits have reliabilities of .90, .92, .94, and .96. The four backup circuits all 4. As VP for operations at Mendez-Cruz have a reliability of .90. Engineering, you must decide which a. What is the reliability of the new product design, A or B, has the highest temperature controller? reliability. B is design with backup units b. If you pay a premium, Wing says he for components R3 and R4. What is the can improve all four of the backup reliability of each design? units to .93. What is the reliability of this option?