Rincian Uang Muka
Rincian Uang Muka
Rincian Uang Muka
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar + Buang Komponen Site/Bangunan Lama Ls 1,210.50 8,550,000.00 10,349,781,412.50
10,349,781,412.50
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 52.00 54,450.55 2,831,428.60
2 Pek. Galian Tanah M3 48.16 69,025.00 3,324,244.00
3 Pek. Urugan Kembali Galian Tanah M3 12.04 23,008.33 277,020.33
4 Pek. Lantai Kerja Beton Cor K.100 M3 3.28 605,599.80 1,985,640.63
5 Pas. Aanstampang batu kali M3 10.16 389,839.00 3,960,764.24
6 Pondasi Batu Kali M3 17.60 747,263.00 13,151,828.80
7 Pas. Pondasi Batu Bata M2 8.05 104,218.65 838,751.71
8 Pas. Angkur Pondasi Pergola Unit 5.00 325,000.00 1,625,000.00
27,994,678.31
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 15 x 20 cm M3 1.32 3,885,500.00 5,128,860.00
2 Pek. Sloof Beton 20 x 25 cm M3 0.53 3,651,800.00 1,928,150.40
3 Pek. Kolom Beton 13 x 13 cm M3 0.22 5,229,700.00 1,131,288.70
4 Pek. Kolom Beton 20 x 20 cm M3 1.82 5,132,800.00 9,362,227.20
5 Pek. Balok Beton 20 x 25 cm M3 1.58 3,651,800.00 5,751,585.00
6 Pek. Plat Beton Teras M3 7.79 3,885,500.00 30,250,948.80
Page 1
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. (Rp.) TOTAL HARGA (Rp.)
(Rp.)
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Tembok/Beton (Cat Air) M2 1,221.20 18,922.20 23,107,790.64
2 Pek. Cat Plafon Gipsum + Les (Cat Air) M2 1,310.10 18,922.20 24,789,988.41
3 Pek. Cat Lisplank GRC (Cat Minyak) M2 117.69 35,363.90 4,162,012.75
4 Pek Cat. Kayu Kozen, Pintu dan Jendela M2 124.21 35,363.90 4,392,550.02
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan M2 25.95 65,300.00 1,694,665.60
58,147,007.43
IX PEKERJAAN PERLENGKAPAN DAN INTERIOR
1 Pas. Instalasi Titik Lampu + Fitting Ttk 56.00 200,000.00 11,200,000.00
2 Pas. Sakelar Bh 41.00 50,000.00 2,050,000.00
3 Pas. Stop Kontak Bh 35.00 50,000.00 1,750,000.00
4 Pas. Downlight 3" + Lampu SL 18 Watt Bh 56.00 110,000.00 6,160,000.00
5 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL M2 147.26 1,850,000.00 272,438,030.00
6 Pas. Wallpaper Dinding M2 311.60 121,000.00 37,703,600.00
331,301,630.00
Page 2
REKAPITULASI BIAYA HPS
Satu Miliar Se Ratus Dua Puluh Tiga Juta Tujuh Ratus Ribu Rupiah.
Dibuat Oleh :
PEJABAT PEMBUAT KOMITMEN
BALAI PENGKAJIAN TEKNOLOGI PERTANIAN
A Z W A R, SP
NIP : 19601231 199903 1 002
REKAPITULASI BIAYA
Satu Miliar Se Ratus Dua Puluh Tiga Juta Tujuh Ratus Ribu Rupiah.
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Atap M2 1,210.50 12,760.00 15,445,989.57
2 Pek. Bongkar Plafond M2 965.35 12,012.00 11,595,784.20
3 Pek. Bongkar Lantai Keramik M2 839.14 18,810.00 15,784,223.40
42,825,997.17
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 52.00 54,450.55 2,831,428.60
2 Pek. Galian Tanah M3 48.16 69,025.00 3,324,244.00
3 Pek. Urugan Kembali Galian Tanah M3 12.04 23,008.33 277,020.33
4 Pek. Lantai Kerja Beton Cor K.100 M3 3.28 605,599.80 1,985,640.63
5 Pas. Aanstampang batu kali M3 10.16 389,839.00 3,960,764.24
6 Pondasi Batu Kali M3 17.60 747,263.00 13,151,828.80
7 Pas. Pondasi Batu Bata M2 8.05 104,218.65 838,751.71
8 Pas. Angkur Pondasi Pergola Unit 5.00 325,000.00 1,625,000.00
27,994,678.31
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 15 x 20 cm M3 1.32 3,885,500.00 5,128,860.00
2 Pek. Sloof Beton 20 x 25 cm M3 0.53 3,651,800.00 1,928,150.40
3 Pek. Kolom Beton 13 x 13 cm M3 0.22 5,229,700.00 1,131,288.70
4 Pek. Kolom Beton 20 x 20 cm M3 1.82 5,132,800.00 9,362,227.20
5 Pek. Balok Beton 20 x 25 cm M3 1.58 3,651,800.00 5,751,585.00
6 Pek. Plat Beton M3 7.79 3,885,500.00 30,250,948.80
Page 5
Nomor : 002/SP-PR/LPSE/VIII/2018 Padang, 30 Agustus 2018
Lampiran : 1 (satu) berkas
Kepada Yth.
Pokja ULP Balai Pengkajian Teknologi Pertanian Sumatera Barat
di Jl. Raya Padang Solok KM 40 Sukarami, Kec. Gunung Talang, Kabupaten Solok - Sumatera Barat
Sehubungan dengan pengumuman Pemilihan Langsung dengan Pascakualifikasi dan Dokumen Pengadaan
nomor : B-1928/ PL.040/H.12.3/07/2017 Tanggal : 21 Agustus 2018 dan setelah kami pelajari dengan saksama
Dokumen Pengadaan dan Berita Acara Pemberian Penjelasan, dengan ini kami mengajukan penawaran untuk
pekerjaan Renovasi Ruang Pelatihan dan Guest House.
Sebesar : Rp. 1,123,700,000.00
TERBILANG : Satu Miliar Se Ratus Dua Puluh Tiga Juta Tujuh Ratus Ribu Rupiah.
termasuk PPN.
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen
Pengadaan untuk melaksanakan pekerjaan tersebut di atas.
Penawaran ini berlaku 90 (sembilan puluh ) Hari sejak batas akhir pemasukan Dokumen Penawaran
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua
ketentuan yang tercantum dalam Dokumen Pengadaan.
Penawar
CV. PRALAKSANA
H. DJUSMAN AMIR
Direktur
REKAPITULASI BIAYA
Kegiatan : Revitalisasi KP Sukarami
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
Satu Miliar Se Ratus Dua Puluh Tiga Juta Tujuh Ratus Ribu Rupiah.
H. DJUSMAN AMIR
Direktur
RENCANA ANGGARAN BIAYA - FULL DESAIN
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar + Buang Komponen Site/Bangunan Lama Ls 1.00 2,500,000.00 2,500,000.00
2,500,000.00
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 8.00 54,450.55 435,604.40
2 Pek. Galian Tanah M3 5.31 69,025.00 366,522.75
3 Pek. Urugan Kembali Galian Tanah M3 1.33 23,008.33 30,543.56
4 Pek. Lantai Kerja Beton Cor K.100 M3 0.73 605,599.80 442,087.86
5 Pas. Pondasi Batu Bata 1 : 4 (Teras dan Dudukan Closed) M2 4.10 104,218.65 427,296.47
1,702,055.04
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 20 x 30 cm
a. Pembesian Kg 190.32 10,562.06 2,010,171.74
b. Cetakan M2 19.89 #REF! #REF!
c. Beton K.175 M3 1.99 744,814.65 1,482,181.16
C JUMLAH A+ B #REF!
D DIBULATKAN #REF!
E HPS ###
F SELISIH #REF!
RENCANA ANGGARAN BIAYA
Kegiatan : Revitalisasi KP Sukarami
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
###
HARGA SAT. JUMLAH HARGA TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.) (Rp.)
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Atap M2 1,210.50 12,760.00 15,445,989.57
2 Pek. Bongkar Plafond M2 965.35 12,012.00 11,595,784.20
3 Pek. Bongkar Lantai Keramik M2 839.14 18,810.00 15,784,223.40
42,825,997.17
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 52.00 54,450.55 2,831,428.60
2 Pek. Galian Tanah M3 48.16 69,025.00 3,324,244.00
3 Pek. Urugan Kembali Galian Tanah M3 12.04 23,008.33 277,020.33
4 Pek. Lantai Kerja Beton Cor K.100 M3 3.28 605,599.80 1,985,640.63
5 Pas. Aanstampang batu kali M3 10.16 389,839.00 3,960,764.24
6 Pondasi Batu Kali M3 17.60 747,263.00 13,151,828.80
7 Pas. Pondasi Batu Bata M2 8.05 104,218.65 838,751.71
8 Pas. Angkur Pondasi Pergola Unit 5.00 325,000.00 1,625,000.00
27,994,678.31
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 15 x 20 cm M3 1.32 3,885,500.00 5,128,860.00
2 Pek. Sloof Beton 20 x 25 cm M3 0.53 3,651,800.00 1,928,150.40
3 Pek. Kolom Beton 13 x 13 cm M3 0.22 5,229,700.00 1,131,288.70
4 Pek. Kolom Beton 20 x 20 cm M3 1.82 5,132,800.00 9,362,227.20
5 Pek. Balok Beton 20 x 25 cm M3 1.58 3,651,800.00 5,751,585.00
6 Pek. Plat Beton M3 7.79 3,885,500.00 30,250,948.80
Page 11
HARGA SAT. JUMLAH HARGA TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.) (Rp.)
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Tembok/Beton (Cat Air) M2 1,221.20 18,922.20 23,107,790.64
2 Pek. Cat Plafon Gipsum + Les (Cat Air) M2 1,310.10 18,922.20 24,789,988.41
3 Pek. Cat Lisplank GRC (Cat Minyak) M2 117.69 35,363.90 4,162,012.75
4 Pek Cat. Kayu Kozen, Pintu dan Jendela M2 124.21 35,363.90 4,392,550.02
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan M2 25.95 65,300.00 1,694,665.60
58,147,007.43
IX PEKERJAAN PERLENGKAPAN DAN INTERIOR
1 Pas. Instalasi Titik Lampu + Fitting Ttk 56.00 145,000.00 8,120,000.00
2 Pas. Sakelar Bh 41.00 36,250.00 1,486,250.00
3 Pas. Stop Kontak Bh 35.00 36,250.00 1,268,750.00
4 Pas. Downlight 3" + Lampu SL 18 Watt Bh 56.00 79,750.00 4,466,000.00
5 Pas. Washtafel Set + Meja Unit 2.00 1,584,125.00 3,168,250.00
6 Pas. Closet Duduk Komplit Unit 2.00 1,667,500.00 3,335,000.00
7 Pas. Jet Washer Unit 2.00 90,625.00 181,250.00
8 Pas. Kaca Cermin Set Unit 2.00 543,750.00 1,087,500.00
9 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL M2 147.26 1,341,250.00 197,517,571.75
10 Pas. Wallpaper Dinding M2 311.60 87,725.00 27,335,110.00
247,965,681.75
Page 12
Actual Chek
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Atap 1,210.50 M2 = 1,210.50
2 Pek. Bongkar Plafond 965.35 M2 = 965.35
3 Pek. Bongkar Lantai Keramik 839.14 M2 = 839.14
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank 52.00 M1 26.00 x 2.00 = 52.00
4 Pek. Lantai Kerja Beton Cor K.100 3.28 M3 2.00 x 12.00 x 0.70 x 0.07 = 1.18 = 3.28
2.00 x 8.00 x 0.70 x 0.07 = 0.78
4.00 x 2.40 x 1.00 x 0.07 = 0.67
1.00 x 13.20 x 0.70 x 0.07 = 0.65
3.28
5 Pas. Aanstampang batu kali 10.16 M3 2.00 x 12.00 x 0.70 x 0.20 = 3.36 = 10.16
2.00 x 8.00 x 0.70 x 0.20 = 2.24
4.00 x 2.40 x 1.00 x 0.20 = 1.92
1.00 x 13.20 x 1.00 x 0.20 = 2.64
10.16
6 Pondasi Batu Kali 17.60 M3 0.20 + 0.60 / 2.00 x 0.60 = 0.24 = 17.60
0.20 + 0.80 / 2.00 x 0.80 = 0.40
6 Pas. Keramik motif Batu Alam Pada Dinding 119.37 M2 Ddg Bgn 9.00 x 3.80 x 2.00 = 68.40 = 119.37
9.00 x 3.80 x 0.15 = 5.13
2.00 x 3.80 x 0.40 = 3.04
1.00 x 6.00 x 1.50 = 9.00
2.00 x 0.70 x 3.00 = 4.20
Ddg Tangga 4.00 x 0.21 x 2.00 = 1.68
2.00 x 0.70 x 0.40 = 0.56
2.00 x 2.40 x 1.50 = 7.20
4.00 x 2.10 x 2.40 = 20.16
119.37
7 Pas. Keramik motif Batu Alam Pada Kolom Entrance 34.32 M2 4.00 x 2.00 x 3.90 = 31.20 = 34.32
4.00 x 0.20 x 3.90 = 3.12
34.32
8 Pekerjaan Kolom Pergola Kayu 15x15x2,62 Diketam Halus 0.29 M3 5.00 x 0.15 x 0.15 x 2.62 = 0.29
9 Pekerjaan Balok Pergola Kayu 8x15 Diketam Halus 0.57 M3 2.00 x 17.20 x 0.08 x 0.15 = 0.41 = 0.57
5.00 x 2.60 x 0.08 x 0.15 = 0.16
0.57
4 Pekerjaan Papan Pergola Kayu 2,5x20 Diketam Halus 0.60 M3 0.20 x 0.025 x 120.00 = 0.60
5 Pekerjaan Kuda-kuda Kanopi Selasar 6/12 0.27 M3 10.00 x 3.80 x 0.06 x 0.12 = 0.27
6 Pekerjaan Rangka Kuda-kuda Kanopi Selasar 5/10 0.05 M3 2.00 x 4.80 x 0.05 x 0.10 = 0.05
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 6.13 = 183.90
2.00 x 10.65 x 4.20 = 89.46
1,210.50
8 Pas. Atap Polycarbonate Pergola 42.80 M2 17.12 x 2.50 = 42.80
VI PEKERJAAN PLAFON
1 Pas. Rangka Besi Hollow 20 x 40 x 0,4 mm 1,310.10 M2 = 1,310.10
R. Guest House
2.00 x 21.50 x 6.54 = 281.22
1.00 x 5.15 x 1.80 = 9.27
2.00 x 3.82 x 6.74 = 51.49
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 8.13 = 243.90
2.00 x 10.65 x 4.20 = 89.46
1,310.10
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 8.13 = 243.90
2.00 x 10.65 x 4.20 = 89.46
1,310.10
3 Pek. Cat Lisplank GRC (Cat Minyak) 117.69 M2 336.26 x 0.35 = 117.69
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan 25.95 M2 5.00 x 4.00 x 2.62 x 0.15 = 7.86 = 25.95
2.00 x 2.00 x 5.60 x 0.08 = 1.79
2.00 x 2.00 x 17.20 x 0.15 = 10.32
5.00 x 2.00 x 2.60 x 0.08 = 2.08
5.00 x 2.00 x 2.60 x 0.15 = 3.90
25.95
9 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL 147.26 M2 = 147.26
R. Guest House
3.00 x 0.20 x 5.00 = 3.00
1.00 x 0.20 x 3.75 = 0.75
1.00 x 0.87 x 8.00 = 6.98
3.00 x 1.70 x 1.20 = 6.12
3.00 x 4.00 x 0.80 = 9.60
R. Rapat
1.00 x 8.94 x 2.50 = 22.35
1.00 x 7.60 x 0.20 = 1.52
R. Makan
1.00 x 3.10 x 0.20 = 0.62
R. Display Boarding
1.52 x 1.25 x 1.20 = 2.28
1.00 x 3.20 x 0.20 = 0.64
R. Boarding
12.00 x 2.00 x 2.10 = 50.40
12.00 x 2.50 x 0.10 = 3.00
12.00 x 2.08 x 1.60 = 40.01
147.26
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
1 1 M1 Pengukuran dan Pemasangan Bouplank
Upah :
0.005 OH Mandor 110,000.00 550.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.100 OH Tukang 110,000.00 11,000.00
0.100 OH Pekerja 80,000.00 8,000.00
Bahan :
0.012 M3 Kayu Balok Kelas IV ### 18,000.00
0.020 Kg Paku Kayu 12,525.00 250.50
0.007 M3 Kayu Papan Kelas IV ### 10,500.00
Jumlah 20,750.00 28,750.50 49,500.50
Keuntungan & Overhead 10% 4,950.05
Jumlah 54,450.55
Page 18
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
6 1 M3 Membuat 1 M3 Beton Mutu Fc = 7,4 MPa (K.100), Slump (12 ± 2 ) cm, w/c = 0,87
Upah :
1.600 OH Pekerja 80,000.00 128,000.00
0.275 OH Tukang 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 110,000.00 9,130.00
Bahan :
247.000 Kg Semen Portland (50 Kg) 902.54 222,927.78
869.000 Kg Pasir Beton 75.00 65,175.00
999.000 Kg Kerikil Beton 88.89 88,800.00
215.000 Ltr Air 13.50 2,902.50
Jumlah 170,740.00 379,805.28 550,545.28
Keuntungan & Overhead 10% 55,054.53
Jumlah 605,599.80
7 1 M3 Membuat Beton Mutu FC = 14,5 MPa (K.175), Slump (12 ± 2) cm, W/C = 0,66
Upah :
1.650 OH Pekerja 80,000.00 132,000.00
0.275 OH Tukang 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 110,000.00 9,130.00
Bahan :
326.000 Kg Semen Portland (50 Kg) 902.54 294,228.56
760.000 Kg Pasir Beton 75.00 57,000.00
### Kg Kerikil Split 0,5 - 1 cm 144.06 148,233.17
215.000 Ltr Air 13.50 2,902.50
Jumlah 174,740.00 502,364.23 677,104.23
Keuntungan & Overhead 10% 67,710.42
Jumlah 744,814.65
Page 19
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
10 1 M2 Memasang Bekisting Untuk Kolom
Upah :
0.660 OH Pekerja 80,000.00 52,800.00
0.330 OH Tukang 110,000.00 36,300.00
0.033 OH Kepala Tukang 120,000.00 3,960.00
0.033 OH Mandor 110,000.00 3,630.00
Bahan :
0.040 M3 Kayu Papan Kelas IV ### 60,000.00
0.400 Kg Paku Kayu 12,525.00 5,010.00
0.200 Ltr Minyak Bekisting 10,350.00 2,070.00
0.015 M3 Kayu Balok Kelas IV ### 22,500.00
2.000 Btg Dolken Kayu Galam Ø8 - 10 cm Panjang 3 m 25,633.10 51,266.19
Jumlah 96,690.00 140,846.19
Untuk 2 x Pemakaian = 1/2 x 70,423.10 167,113.10
Keuntungan & Overhead 10% 16,711.31
Jumlah 183,824.40
Page 20
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
14 Anal. Beton Balok BL uk 13 x 20 / M3
1.0000 M3 Beton Mutu f'c = 14,5 Mpa ( K175 ) 744,814.65 744,814.65
15.3606 M2 Cetakan Balok 186,299.40 2,861,670.63
### Kg Pembesian Besi Polos/Ulir 10,562.06 1,292,926.36
Jumlah 4,899,411.65
Dibulatkan 4,899,400.00
15 Anal. Beton Balok RB uk 13 x 20 / M3
1.0000 M3 Beton Mutu f'c = 14,5 Mpa ( K175 ) 744,814.65 744,814.65
15.3606 M2 Cetakan Balok 186,299.40 2,861,670.63
### Kg Pembesian Besi Polos/Ulir 10,562.06 1,969,289.16
Jumlah 5,575,774.44
Dibulatkan 5,575,700.00
16 1 M2 Memasang Dinding Bata Merah Tebal 1/2 Bata, Campuran 1 PC : 4 PP
Upah :
0.300 OH Pekerja 80,000.00 24,000.00
0.100 OH Tukang 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 110,000.00 1,650.00
Bahan :
70.000 Bh Bata Merah 600.00 42,000.00
11.500 Kg Semen Portland (50 Kg) 902.54 10,379.23
0.043 M3 Pasir Pasang 105,000.00 4,515.00
Jumlah 37,850.00 56,894.23 94,744.23
Keuntungan & Overhead 10% 9,474.42
Jumlah 104,218.65
14 1 M2 Memasang Acian
Upah :
0.150 OH Pekerja 80,000.00 12,000.00
0.100 OH Tukang 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.008 OH Mandor 110,000.00 880.00
Bahan :
3.250 Kg Semen Portland (50 Kg) 902.54 2,933.26
Jumlah 25,080.00 2,933.26 28,013.26
Keuntungan & Overhead 10% 2,801.33
Jumlah 30,814.59
15 1 M2 Afwerking Beton
Upah :
0.640 Oh Pekerja 80,000.00 51,200.00
0.300 Oh Tukang 110,000.00 33,000.00
0.030 Oh Kepala Tukang 120,000.00 3,600.00
0.032 Oh Mandor 110,000.00 3,520.00
Bahan :
0.192 Zak Semen Portland (50 Kg) 45,127.08 8,664.40
0.005 M3 Pasir Pasang 105,000.00 525.00
Jumlah 91,320.00 9,189.40 100,509.40
Keuntungan & Overhead 10% 10,050.94
Jumlah 110,560.34
Page 21
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
16 1 M3 Pekerjaan Kontruksi Kuda kuda Expose Kayu Kelas I
Upah :
6.000 Oh Pekerja 80,000.00 480,000.00
20.000 Oh Tukang 110,000.00 ###
2.000 Oh Kepala Tukang 120,000.00 240,000.00
0.300 Oh Mandor 110,000.00 33,000.00
Bahan :
0.200 M3 Balok Kayu Kelas II ### 450,000.00
5.600 Kg Paku Kayu 12,525.00 70,140.00
Jumlah ### 520,140.00 3,473,140.00
Keuntungan & Overhead 10% 347,314.00
Jumlah 3,820,454.00
Page 22
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
Jumlah 124,978.70
Page 23
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
21 1 M2 Memasang Rangka Plafon Besi Hollow
Upah :
0.200 Oh Pekerja 80,000.00 16,000.00
0.025 Oh Tukang 110,000.00 2,750.00
0.008 Oh Kepala Tukang 120,000.00 960.00
0.001 Oh Mandor 110,000.00 110.00
Bahan :
6.000 M1 Besi Hollow 20 x 40 mm 5,625.00 33,750.00
0.100 Kg Paku Sekrup 18,750.00 1,875.00
Jumlah 19,820.00 35,625.00 55,445.00
Keuntungan & Overhead 10% 5,544.50
Jumlah 60,989.50
29 1 M2 Pengecatan Bidang Kayu/Cat Minyak (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Upah :
0.070 OH Pekerja 80,000.00 5,600.00
0.009 OH Tukang 110,000.00 990.00
0.006 OH Kepala Tukang 120,000.00 720.00
0.003 OH Mandor 110,000.00 275.00
Bahan :
0.200 Kg Menie Kayu 22,800.00 4,560.00
0.150 Kg Plammer Kayu 20,700.00 3,105.00
0.170 Kg Cat Dasar/Cat Minyak 39,300.00 6,681.00
0.260 Kg Cat Penutup/Cat Minyak 39,300.00 10,218.00
Jumlah 7,585.00 24,564.00 32,149.00
Keuntungan & Overhead 10% 3,214.90
Jumlah 35,363.90
30 1 M2 Pengecatan Bidang Tembok/Beton (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Upah :
0.020 OH Pekerja 80,000.00 1,600.00
0.063 OH Tukang 110,000.00 6,930.00
0.006 OH Kepala Tukang 120,000.00 756.00
0.003 OH Mandor 110,000.00 275.00
Bahan :
0.100 Kg Plammer Tembok 12,150.00 1,215.00
0.100 Kg Cat Dasar (Dulux Catylac) 17,850.00 1,785.00
0.260 Kg Cat Penutup (Dulux Catylac) 17,850.00 4,641.00
Jumlah 9,561.00 7,641.00 17,202.00
Keuntungan & Overhead 10% 1,720.20
Jumlah 18,922.20
Page 24
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
31 1 M2 Bongkar Atap
Upah :
0.100 OH Pekerja 80,000.00 8,000.00
0.025 OH Tukang 110,000.00 2,750.00
0.003 OH Kepala Tukang 120,000.00 300.00
0.005 OH Mandor 110,000.00 550.00
Jumlah 11,600.00 - 11,600.00
Keuntungan & Overhead 10% 1,160.00
Jumlah 12,760.00
32 1 M2 Bongkar Plafond
Upah :
0.120 OH Pekerja 80,000.00 9,600.00
0.012 OH Mandor 110,000.00 1,320.00
Jumlah 10,920.00 - 10,920.00
Keuntungan & Overhead 10% 1,092.00
Jumlah 12,012.00
Penawar :
CV. PRALAKSANA
H. DJUSMAN AMIR
Direktur
Page 25
HARGA SATUAN UPAH DAN BAHAN
Page 26
NO BAHAN BANGUNAN SATUAN HARGA SATUAN
47 Pipa PVC dia. 1/2" AW M1 Rp. 5,400.00
48 Pipa PVC dia. 3/4" AW M1 Rp. 6,900.00
49 Pipa PVC dia. 1.5" AW M1 Rp. 11,775.00
50 Pipa PVC dia. 3" AW M1 Rp. 26,400.00
51 Pipa PVC dia. 4" AW M1 Rp. 41,100.00
52 Kran Air Ø1/2" Bh Rp. 18,750.00
53 Stop Kran PVC Ø3/4" Bh Rp. 26,250.00
54 Seal Tape Bh Rp. 3,750.00
55 Floor Drain Stainless Steel Bh Rp. 30,000.00
H. DJUSMAN AMIR
Direktur
Page 27
PAH DAN BAHAN
###
HARGA SATUAN
HARGA SATUAN
/Kg
/Kg
/Kg
/Kg
/Kg
###
###
###
###
/M3
Page 28
HARGA SATUAN
Page 29
JADWAL WAKTU PELAKSANAAN PEKERJAAN
3 Pek. Bongkar Lantai Keramik 1.545 0.31 0.31 0.31 0.31 0.31
II PEKERJAAN PONDASI -
6 Pas. Keramik motif Batu Alam Pada Dinding 1.148 0.38 0.38 0.38
7 Pas. Keramik motif Batu Alam Pada Kolom Entrance 0.330 0.17 0.17
8 Pekerjaan Kolom Pergola Kayu 15x15x2,62 Diketam Halus 0.082 0.03 0.03 0.03
9 Pekerjaan Balok Pergola Kayu 8x15 Diketam Halus 0.159 0.03 0.03 0.03 0.03 0.03
-
IV PEKERJAAN KOZEN DAN PINTU -
1 Pas. Pintu Panil 1 0.728 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
2 Pas. Pintu Panil 2 0.291 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
1 Mengganti Kuda-kuda dan Gording yang Rusak 0.898 0.30 0.30 0.30
3 Pas. Lisplank GRC Double tbl. 8 mm 1.730 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
4 Pekerjaan Papan Pergola Kayu 2,5x20 Diketam Halus 0.168 0.06 0.06 0.06
7 Pas. Atap Spandek 0,45 17.433 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 50
VI PEKERJAAN PLAFON -
1 Pas. Rangka Besi Hollow 20 x 40 x 0,4 mm 7.822 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
2 Pas. Gipsum Board tebal 9 mm 6.094 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61
1 Pas. Keramik Lantai 60 x 60 cm Polished 6.994 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
2 Pas. Keramik Lantai 60 x 60 cm Unpolished 2.206 0.37 0.37 0.37 0.37 0.37 0.37
3 Pas. Keramik Dinding 20x40 di Toilet 2.486 0.41 0.41 0.41 0.41 0.41 0.41
4 Pas. Keramik Lantai 40x40 1.976 0.28 0.28 0.28 0.28 0.28 0.28 0.28
5 Pas. Keramik lantai motif Batu Alam 1.113 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
1 Pek. Cat Dinding Tembok/Beton (Cat Air) 2.262 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16
2 Pek. Cat Plafon Gipsum + Les (Cat Air) 2.427 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
3 Pek. Cat Lisplank GRC (Cat Minyak) 0.407 0.08 0.08 0.08 0.08 0.08
4 Pek Cat. Kayu Kozen, Pintu dan Jendela 0.430 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan 0.166 0.04 0.04 0.04 0.04
-
IX PEKERJAAN PERLENGKAPAN DAN INTERIOR -
1 Pas. Instalasi Titik Lampu + Fitting 0.795 0.13 0.13 0.13 0.13 0.13 0.13
9 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL 19.335 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21
10 Pas. Wallpaper Dinding 2.676 0.45 0.45 0.45 0.45 0.45 0.45 0
100.000
1 Bobot Rencana Per Minggu 0.89 2.94 3.68 4.93 5.86 7.51 7.80 8.58 7.79 8.31 8.66 8.69 7.37 7.04 4.22 3.15 2.58
2 Bobot Rencana Komulatif 0.89 3.84 7.52 12.45 18.31 25.82 33.62 42.20 49.98 58.29 66.95 75.64 83.01 90.05 94.27 97.42 100.00
Jangka waktu pelaksanaan pekerjaan pisik = 120 (seratus dua puluh) hari kalender
Penawar :
CV. PRALAKSANA
H. DJUSMAN AMIR
Direktur
DAFTAR PERSONIL INTI
H. DJUSMAN AMIR
Direktur
JENIS, KAPASITAS, KOMPOSISI
DAN JUMLAH PERALATAN UTAMA MINIMAL YANG DIBUTUHKAN
H. DJUSMAN AMIR
Direktur
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT
KOMPONEN DALAM NEGERI (TKDN)
Kegiatan : Revitalisasi KP Sukarami
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
Nilai Gabungan Barang/Jasa (Rp.) TKDN
Total
Uraian Pekerjaan
DN LN Ribu % Barang/Jasa Gabungan
(Rp.) KDN
Barang
I. Material Langsung ###### ### 100.00 ### ###
(Bahan Baku)
II. Peralatan (Barang Jadi) ###### ### 100.00 ### ###
A. Sub Total Barang ###### ### 100.00 ### ###
Jasa
III. Manajemen Proyek ###### ### 100.00 ### ###
dan Perekayasaan
IV. Alat Kerja/Fasilitas Kerja 44,948,000.00 ### 44,948,000.00 100.00 44,948,000.00 44,948,000.00
V. Konstruksi dan Fabrikasi 89,896,000.00 ### 89,896,000.00 100.00 89,896,000.00 89,896,000.00
VI. Jasa Umum 44,948,000.00 ### 44,948,000.00 100.00 44,948,000.00 44,948,000.00
B. Sub Total Barang ###### ### 100.00 ### ###
3105/UN35/PS
Rehabilitasi Labor MIPA ( Labor Kampus UNP Air tawar Universitas Negeri 18 Agustus
1 DIPA/BOPTN/201 ### 12/15/2015
Fisika) Universitas negeri Padang Padang Padang 2015
5
42.02/2257/Dikm
e
Dinas Pendidkan 14 Desember n 2016
Biaya konstruksi Fisik Pembanguna Nagari Koto Gaek Kab. 011/01.430/DIKM
2 dan Kebudayaan ### 2016 01-Sep-16 Tgl. 5
Masjid SMAN 2 Sumbar Solok EN/2016
Prov. Sumbar Desember
2016
B.894.a/Kk.03.11
Pembangunan Gedung Balai Kantor Kementerian B1296.a/Kk.03.11
- 11 Desember
3 Nikah Dan manasik Haji Kec. Talawi Kota Sawahlunto Agama ### /f/ KS.00/12/2017
f/KS00/08/2017 2017
Kec. talawi Kota sawahlunto Tgl. 11 Des-2017
14 Agustus 2017
Pemeliharaan/Perbaikan kamar,
Universitas Negeri 2888/UN35/PS-
5 Ruang Rapat dan Dapur Mess Kampus UNP Bukittinggi ### 29 juli 2016 17 Agustus 2016
Padang DIPA/PNBP/2016
Disamping Labor Perhotelan UNP
Pemeliharaan/Perbaikan Halaman Universitas Negeri 2327/UN35/PS-
6 Kampus UNP Bukittinggi ### 22 Juni 2015 5 Agustus 2015
Parkir Kampus Bukittinggi UNP Padang DIPA/PNBP/2015
359/REGIONAL
Renovasi dan Standarisasi KPRK
8 KPRK Sungai Penuh PT POS INDONESIA III/DEPUM/HK/10 ### 2/10/2017 3/12/2017
Sungai Penuh 37100
17
H. DJUSMAN AMIR
Direktur
JADWAL PELAKSANAAN PEKERJAAN
2 Bobot Rencana Komulatif #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Konsultan Perencana
CV. INTIKARYA TIGAMITRA (INKATIM)
Kegiatan :
Pekerjaan : Rehab Gedung Kantor Dinas Kebudayaan Dan Pariwisata Provinsi Sumatera Barat
Lokasi : Jln. Khatib Sulaiman No. Padang
I PEKERJAAN PENDAHULUAN
1 Pembuatan Job Mix Formula (JMF) + Laporan Ls 1.00 750,000.00 750,000.00
2 Pek. Bongkar + Buang Komponen Site/Bangunan Lama Ls 1.00 2,500,000.00 2,500,000.00
3,250,000.00
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 8.00 54,450.55 435,604.40
2 Pek. Galian Tanah M3 5.32 69,025.00 367,213.00
3 Pek. Urugan Kembali Galian Tanah M3 1.33 23,008.33 30,601.08
4 Pek. Lantai Kerja Beton Cor K.100 M3 0.82 605,599.80 496,591.84
5 Pas. Pondasi Batu Bata 1 : 4 (Teras dan Dudukan Closed) M2 4.41 104,218.65 459,604.25
1,789,614.57
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 20 x 30 cm
a. Pembesian Kg 201.25 10,562.06 2,125,615.08
b. Cetakan M2 19.32 #REF! #REF!
c. Beton K.175 M3 1.93 744,814.65 1,437,492.28