Total Quality Management
Total Quality Management
Total Quality Management
Work flow
Customer satisfaction
a. Waste
b. No material
c. Breakdown
d. All of the above
Customer
Customer need
8- -------------
helps organization reduce employee turnover and
absenteeism.
Customer need
ISO-14000
Plan-Do-check-Act
Step in activity
Decision making
a. provide Resources
b. define EMS
c. monitor the effectiveness of the system
d. All of the above
Prevention
21- Service Assurance is
a. Formulation stage
b. Maintenance stage
c. Implementation stage
d. All of the above
Bill Cosby
26- One of the most powerful aspects to emerge from TQM is the
concept of the internal customer and supplier. This means that:
Marketing costs
28- Which one of the following would normally be considered as one
of the ‘costs of quality’?
Appraisal costs
32- Appraisal costs are those costs incurred when trying to stop
problems, failures and errors from occurring.
False
33- What is the aim of fool proofing technique used for total quality
management?
to achieve zero defects
TS 16949
37- What is quality assurance?
Quality assurance deals with activities which prove that products
and services meet the required quality standard
38- Which of the following statements is/are false?
a. time wastage
b. labour wastage
c. cost of excessive inventory
d. all of the above
Systematic approach
F, T
45- What are the core principles of the TQM in a company-wide
effort?
48- How many stages are needed for inspection and testing in TQM
as per ISO 9001?
Facts only
Controlling
Clan control
Set standards
Post-control
Kaizen
55- Where was Total Quality Management first developed?
Japan
Assumptions
58- What is the term for the monitoring of events both internal and
external to the organisation that affects strategy?
Strategic surveillance