Hugo Blanco Peñarrieta
Hugo Blanco Peñarrieta
Hugo Blanco Peñarrieta
EDUCATION
PERSONAL DATA
EXPERIENCE HISTORY
Workovers in Caranda, Colpa, La Peña and Rio Grande fields. Squeezes, fishing operations, gas
lift design and operations, opened windows with K Mill Tool for gravel packing, gravel pack
using High Density Gravel Pack technique.
Completion Operations in cased hole, open hole, gravel packing in cased hole and open hole
with Baker One Trip Single Zone High Density Gravel Pack Technique.
Drilling Engineer/company man in Caranda, Colpa, La Peña and Rio Grande Fields.
Production Operations in Porvenir Field. Slick Line, Wire Line Operations with Oxy-Wire Line
Unit. Build Up, Fall Off, Static Gradient Surveys, Pack Off installations, sludge removal jobs in
gas injection wells. Production logging (spinner, worm, pressure and gradiomanometer) in
producers and gas injection wells.
Carmen No 1 Deep well. Drilling Engineer. Office and well site duties (1985-1986).
1
Teniente Acosta No 1 Deep well. Drilling Engineer. Office and well site duties (1987-1988).
Nazaret No 1. Deep well. Drilling Engineer. Office and well site duties (1987-1988).
Bordo Alto No 1. Drilling engineer. Both well site and office duties. Well Planning. Well
programming and carry out daily cost estimation.
Porvenir No 1 Deep Workover. Programming, supervision and logistics.
Duties included:
Well Planning
Tenders Evaluation & Recommendations – Rig, Drilling Fluids, Cementing, Rental Tools,
Directional Services, etc
Well Drill Programming
AFE process and well cost estimations
Completions and Workover operations. Programming and Supervision. Hydraulic pumping and
ESP pumping.
Duties included:
Well Planning
Tenders Evaluation & Recommendations – Rig, Drilling Fluids, Cementing, Rental Tools,
Directional Services, etc
Well Drill Programming
AFE process and well cost estimations
Post Well Analysis
2
OCCIDENTAL BOLIVIANA - DIAMOND SHMAROCK 1992-1993
Drilling & Well Operations Manager.
Duties included:
Well Planning
Tenders Evaluation & Recommendations – Rig, Drilling Fluids, Cementing, Rental Tools,
Directional Services, etc
Well Drill Programming
AFE process and well cost estimations
Received four months trainee in all Smith product lines in Houston, Laffayette and Houma, USA.
Conducted Sales & Services in Comodoro Rivadavia, Neuquen, Mendoza and Tartagal
Independencia-X1 Well. Well construction, Office and well site duties. Remote location.
Managed Technical Issues for the local government
Corvina Platform - Offshore operations, High angle deviated wells ERW: CX11-14D, CX11-
18D, CX11-20D, CX11-15D, CX11-15DST(Geo), CX11-17D, CX11-19D, CX11-22D, CX11-
23D, CX11-23ST(Geo)
Albacora Platform – Offshore operations, A-14XD, A-15D, A-17D. Deeper wells, J & S type.
Same well geometry and technology applications.
Well planning and supervision
Hole instability and hole cleaning issues
Geomecanical Analysis
Implementation of new technologies, Drilling with Casing, Compact well Heads, Agitator,
Hydro Cleans, Torque reducers, 5 7/8” DP, 16” Bicone bits, Slider, Mud Stripper.
Drilling Performance Improvement Plan – KPI’s, Benchmarking
Single Selective and dual Semi-Intelligent Completions.
Participate in the design of the CX15 Cell Sparr Bouyant Tower to be implemented in Corvina
Field. Project of 80 MM$us.
Implemented the drilling operation on CX-15 platform which is the world's first application of a
proprietary design that it is a fusion and combination of existing and proven technology from Deep
Water Cell Sparr Floating platforms, compliant tower structures and shallow pile foundations.
Two Opposing Cantiliver with 12 slots each
20" x 110 Ft Bend Limiter Conductors, welded and peening
13 3/8" TTR Casing
Boot strap derrick
1600HP compact Drawworks
Joy Stick controls
Planning and preparing the "Basic Well Design" for a Deep Water. Well name:Naylamp-1X.
Offset Wells Analysis
Geomechanics
Basic Well Design
AFE
Logistics Study
Personal References