Sub Sea Well HeadSite Supervisors
Installations
Module – 12
Well Completions
Schlumberger Private
Section – 8
Sub Sea Well Heads
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
1/22
8. Sub Sea Well Head Installations
Contents
y Offshore Operations Evolution
y Why go Subsea?
Schlumberger Private
y Subsea Development Options
y Subsea System Overview
y Technical Challenges
y Schlumberger Subsea
y SRC
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
2/22
8. Sub Sea Well Head Installations
Offshore Operations Evolution
Offshore Deepwater Subsea
Schlumberger Private
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
3/22
8. Sub Sea Well Head Installations
Deepwater Potential
US Reserves 1977 Added 77-97
Lower 48 23.4 35.9
4.2 Alaska 8.4 8.8
Peak U.S.
Schlumberger Private
Production Modeled
Alaska
Deepwater
Billions of bbls
3.6 Peak
Production
Horizontal Impact
Wells
3.0
2.4
Total U.S.
Lower 48 GOM: 20-46 Billion bbls
1.8
Global: 200+ Billion bbls
1949 1960 1980 2000 2020
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
4/22
8. Sub Sea Well Head Installations
Subsea Market
Total Worldwide Subsea Completions
2000
1800
Schlumberger Private
1600
1400
1200
1000
800
600
400
200
0
1960- 1965- 1970- 1975- 1980- 1985- 1990- 1995- 2000-
1965 1970 1975 1980 1985 1990 1995 2000 2005
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
5/22
8. Sub Sea Well Head Installations
Subsea Development Options
Schlumberger Private
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
6/22
8. Sub Sea Well
Deepwater Head Installations
Development Options
Schlumberger Private
Tension Leg Platform
(TLP)
Tanker FPSO
Semi submersible FPS
Spar
Fixed Platform
Subsea Tieback
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
7/22
8. Sub Sea Well Head Installations
Deepwater Development Options
Fixed Platforms Current Depth
Tension Leg Potential Depth
Schlumberger Private
Platforms
Tanker FPSO
Semisub FPS
SPAR
Subsea Tieback
0 3000 6000 9000
Water Depth ft
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
8/22
8. Sub Sea Well Head Installations
Subsea System Overview
y Wells
y Subsea Production trees
y Tiebacks
Schlumberger Private
y Templates
y Manifolds
y Pipelines
y Control Systems
y Umbilical
y Control Pods
y Pumps
y Separators
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
9/22
8. Sub Sea Well Head Installations
Sub Sea Tree Design Options
Conventional (Concentric) Tree Horizontal (Spool) Tree
Schlumberger Private
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
10/22
8. Sub Sea Well Head Installations
Conventional Trees
y Tubing Hanger installed in the
Wellhead
y Flow Control valves in line with
tubing
y
Schlumberger Private
Consist of three sub-systems
1. Surface Equipment
y Surface Flow Tree
y Swivel
y Coiled Tubing Lifting Frame
2. Riser System
y Dual bore risers and
monobosre risers
3. Subsea Equipment
y Lower Riser Package
y Emergency Disconnect
Package
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
11/22
8. Sub Sea Well Head Installations
Horizontal Trees
y Tubing Hanger is landed in the
tree
y Flow Control valves are outside
Schlumberger Private
of the tubing flow path
y Configuration allows for full bore
access to tubing hanger
y Well intervention without
disturbing tree, flow line
connections or umbilical
y Reduce cost and tree size
y Allows for 7” production tubing
y Higher production per tree
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
12/22
8. Sub Sea Well Head Installations
Tiebacks
y Simple wellhead / pipeline
configurations are often not
practical
y Water depth
Schlumberger Private
y Environment
y Subsea Solution – Tiebacks
y Multiple wellheads
connected to a manifold by
flowlines
y Production connected to
y Floating Production
Systems
y Neighboring Platforms
y Onshore facilities
y Record distance 68 miles
(GOM Mensa field)
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
13/22
8. Sub Sea Well Head Installations
Templates and Manifolds
Templates Manifolds
y Provide support for manifolds y Interface between the production
and wells pipeline, flow line and the well.
y Can be deployed in 2500 m water y Collect and distribute produced fluids from
Schlumberger Private
depth individual subsea wells
y Inject gas, inject chemicals and control
fluids.
y Distribute the electrical and hydraulic
systems.
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
14/22
8. Sub Sea Well Head Installations
Control Systems
y Downhole valves, valves on tree, flow
lines and manifolds are controlled
hydraulically from surface
Schlumberger Private
y Topside controls linked to Subsea
Control Modules (SCM) with Umbilical
y Dual redundant, electro-hydraulic
computerized systems:
y Control Valves
y Monitor instruments
y Send data (P, T, Flow Control and
Sand detection)
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
15/22
8. Sub Sea Well Head Installations
Subsea Challenges
y Zero tolerance for compromising
safety
y Complexity of Offshore
environment
Schlumberger Private
y Well Accessibility
y Weather, Currents
y Technology
y Hydrates, Scales, Corrosion
y Multi-zone production
y Hostile, unconsolidated
y Extended Reach operations
y Risks
y Little previous experience
y Financial Exposure
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
16/22
8. Sub Sea Well Head Installations
Schlumberger Subsea
y Johnston introduced Subsea Safety Trees to the industry in 1974.
y The E-Z TREE allowed floating drilling vessel to quickly leave
location for the DST Exploration Market.
Schlumberger Private
y The latest product is now called SenTREE 3.
y In Q3 1996, SBC (Subsea Business Center) was formed in
Aberdeen to Develop Subsea Well Control Systems for
Development Wells and Intervention Market.
y Responsible for Marketing and System Level Development.
y SRC (then SPT) was responsible for Development and
Manufacturing of the critical Subsea Products.
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
17/22
8. Sub Sea Well Head Installations
Schlumberger Subsea
• Core competency at the moment
y Completion Installations
y Exploration testing using the
SenTree3
y
Schlumberger Private
Well Control and Intervention using
the SenTREE 7 systems
y Light Weight Intervention
y The Commander Telemetry presents
opportunities for Subsea Power and
Control Systems
y Schlumberger’s Subsea role is best
described with the name:
y Subsea Completion Management
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
18/22
8. Sub Sea Well Head Installations
Providing Access
y Beyond 4000 ft, floating installations
are kept on station using DP
technology
y Requires different techniques to
Schlumberger Private
provide access, well shut-in and
emergency disconnects
y Primary Subsea Safety System:
y Isolates landing string from
completion
y Rapid Disconnect
y Prevents Discharge
y Allows Reconnection
y Two Systems
y SenTree 3
y SenTREE 7
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
19/22
8. Sub Sea Well Head Installations
SenTREE 7 primary functions
Applications
y Testing
y Installing Completion
y Well Intervention
Schlumberger Private
It is the primary subsea safety
device and provides fast acting
and reliable means to:
y Shut-in the well with two
barriers
y Prevent discharge of its
contents into the riser
y Disconnect the landing
string from the test string.
y Allows Chemicals to be
pumped into the landing
string.
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
20/22
8. Sub Sea Well Head Installations
SenTREE 7 Operation
Schlumberger Private
Emergency Disconnect
Ball Valve
Operational Overview
Latch
Flapper Valve
Quartz School. Module 12: Well Completions / Section 8: Sub Sea Well Head Installations
21/22
8. Sub Sea Well Head Installations
Subsea Technology at SRC
y SenTREE 7 System
Engineering
y Subsea Accumulator
Module - SAM
Schlumberger Private
y Subsea Control Module -
SCM
y Subsea Spanner Joint
y Ball, Retainer and Flapper
Valves
y Deep Water Control
System - DWCS
y Building of SenTREE 7 Systems
y Acceptance and System
Integration Tests