Api - 653 Exame Preparatory
Api - 653 Exame Preparatory
23/11/2016
1-in the case of apparent conflicts between the requirement of this stander and
API 650 or its predecessor API 12 C this standard shall govern for tanks that have
been in service
2-all requirement of API 650, ANNEX M shall be considered before changing the
service of operation at temperature above 200 F.
7- Give product specific gravity less than 1 of unknown material and give
thickness of first shell course is 0.5 in and required bottom plate minimum
thickness is 0.17.
9- Visual external inspection is required at least every five years or RCA /4N
years whichever is less.
10- The RPI assessment shall be reviewed and approved by a team as above at
interval not exceed 10 year.
12-corrosion rate from low inspection effectiveness such as spot UT shall not be
used in the RBI process.
13- the results of any experiences with coating and lining shall be documented
on repair / alteration history .
14-the minimum repair plate dimension is 4 in.
15- Give thickness ½ ‘’ and required the distance from the splice weld to existing
shell penetration H is 3’’.
16-welded –on patch plate shall not be placed over area of the tank bottom that
have global dishing.
17-welded –on patch plates are not permitted in the critical zone on a tank
bottom with an operating temperature exceeding 200 F for carbon steel.
18 - give connection size NPS equal 18’’ and required minimum shell plate
thickness is ½ ‘’.
19- Flange –to – nozzle –neck welds do not require welder identification.
21-hydrostatic test exemption by the tank owner / operator has authorized the
exemption in writing and fitness for service evaluation.
22- Radiographs and radiograph records of all repaired welds shall be marked
with the letter ‘R ‘.
23- give tank diameter 65 ft. and required minimum number of elevation points
is 8.
25- The new nameplate shall be attached to the tank sell adjacent to the
existing nameplate.
29- Presence of crushed rock under the steel bottom usually in service
underside corrosion
33- Internal corrosion of these tanks in the vapor space caused by hydrogen
sulfide vapor, water vapor, oxygen.
35- The lowest one –day mean temperature for LOS Angeles is 35 F.
36- Corrosion and abrasion protection: of column wear plate nominal thickness
and minimum fillet weld shall not less than 6 mm (¼’’) shall be welded to the
tank bottom with a 6mm (¼’’) minimum fillet weld.
37- The slope of the frangible roof at the top angle attachment does not exceed
2: 12
43- thick- film linings shall be inspected by using high – voltage detector
44- Thin- film linings should be performed with a low – voltage (67.5 votes)
46- Heat affected zone portion of base metal no melted but mechanical
properties or microstructure have been altered.
48- To minimize burn through, the first weld should be made with 3/32 in (4.76
mm) or smaller diameter welding electrode.
55- How many RT films shall be taken for completed joints of replaced
rectangular portion of the tank shell? 6 films
57- Inorganic zinc (zinc silicates) is often applied to internal tank surface
however it is not considered a thin film coating according to API 653
58- IF welder is qualified for welding for welding of plate groove it also qualified
for most fillet weld.
59- The best way to determine the extent of lining before repair is by visual
inspection.
60- During visual inspection the tank ground connection is observed to have
electrical damage so your action is its resistance can be checked.
61-the best method to measure the depth of isolated pitted area pit gauging.
62- Connected pipe outside tank and go underneath ground, the soil around
pipe shall be removed and the pipe inspected visually.
63- Carbon steel and 300 series ss have serious corrosion problems in high
strength caustic solutions above 150 F.
66- Usually, close visual inspection is sufficient when checking for crack – like
flaws but for increased sensitivity, liquid penetrant or magnetic particle
examination should be used.
71- The external visual inspection shall be every five year, when this inspection
can be made before this period, if the interval is calculated to be less than the
one-fourth corrosion rat life.
73- Corrosion rat to problem for change the service tank wok at 10year with oil
and after 10 year work with water.
74- If the drains are blocked an accumulation of liquid can cause floating roofs
to sink
75- If the internal inspection is required solely for the purposed of determine
the condition and integrity of the tank bottom, the internal inspection may be
accomplished with the tank bottom, the internal inspection may be
accomplished with the tank in –service utilizing various ultrasonic robotic
thickness measurement.
76- Abrasive blasting should not be performed if the temperature of the steel
surface is less than (3 c) 5 F above the dew point (10 F)
77-newly welded bottom joints shall be tested using vacuum box and solution
film or by mean of: tracer gas and detector examination.
78- UT test inspection of the shell plate for laminations in the affected area is
mandatory when a reinforcement plate is added to an existing un-reinforced
shell penetration.
79- A tank has a shell corrosion rat of mils per year and remaining corrosion
allowance of .017 ‘’. For this tank, the maximum interval for service UT
thickness measurement is 15 year.
80- Corroded roof plates shall be repaired or replaced, when the: average
thickness is less than 0.009 in a 100 square inch area.
81- The critical zone for repairs to tank bottoms is that portion of the bottom or
annular plate within 3’’ of the inside edge of the shell, measured radially
inward.
82- For tank to be reconstructed a 48 ft. high tank has a diameter of 127 ft. .
What is the max out- of –plumpness allowed? 5’’
86- procedure is qualified on plate 0.5 thick which of the following thicknesses is
not qualified?
87- if piping near the tank enters the ground , the soil should be excavated -------
--------inches for inspection .
88- in order to comply with API 650 , the finished surface of a weld
reinforcement on plate ½’’ thick horizontal butt joint may have a reasonably
uniform crown not to exceed ------------------------for radiographic examination .
1- 120F
2- 140 F
3- 160 F
4- 200 F ( 1 ½’’ )
90- How many root bend and face bend are required to qualify a 3/8’’ plate
groove weld?
a- 0
b- 1
c- 2 ( I root , 1 face )
d- 4
a- 1/64
b- 1/32
c- 1/16
d- 1/8
92-prior to welding the new vertical joint the existing horizontal weld shall be
cut for minimum distance 12 in by one the new vertical joint.
94-all corner for repair plate shall be rounded to a minimum radius is 2’’
95- Minimum repair plate dimension is 4’’, and the maximum vertical and
horizontal dimension of repair plate is 48 in and 72 in respectively.
98- The minimum dimension for a welded –on patch plate that overlap bottom
seam or existing patch is 12 ‘’
101- The critical combination of factors in brittle fracture can occur: the stress
concentration effect of a flaw.
104- Bolting and flange shall conform to ASTM A 193 B 7 (API 650 4.7 A)
105-such as API standard that applies if the tank were built today (current
applicable standard)
111- According the WPS AND PQR given AWS E-7018 and the inspector found
the welder start welding by E-7010 what action taken by the inspector:
112 –GIVE thickness rig in WPS from ¼’’ to 1 ½’’ And thickness for PQR IS 0.5’’
1- 24’’
2- 28’’ (able 5-18 API 650 )
3- 32’’
4- 34 ‘’
117- Tank is constructed as per API 650 GIVEN H=40 ft., D= 160 ft. , WIDTH OF
COURES = 8 ft. And L= 24 in and designed the CA = 0125 ‘’ AND minimum
thickness t2 is among following reading (0.345’’, 0.4’’, 0.3’’, 0.25’’, 0.45’’) if the
location of the critical length is 1 feet from the second course of the shell what
is the value of H in the formula for calculating t min?
a- 32 feet
b- 31 feet ( H = 40 -8 -1 = 31 feet )
c- 40feet
d- 28 feet
118- Before decision for the lining repair the inspector should be inspection by