Installation/billing Commencement Report Installation/billing Commencement Report
Installation/billing Commencement Report Installation/billing Commencement Report
Installation/billing Commencement Report Installation/billing Commencement Report
airtel limited
installation/billing commencement report
(Once the report is signed, billing shall commence from the date of installation)
Installation Door No 17 Narasingapuram Street Mount Road Ground Floor Na CHEN2 Tamil Nadu
Address
Old CPE Recovered for Upgrade Yes No Recovered CPE Make & Model:
I (Rakesh_OM Sai_Vendor) as Airtel representative confirm that I have verified and physically installed the connection at
the above address and as per the details provided.
Engineer's Signature
Declaration