Kesimpulan
Untuk perencanaan diambil daya dukung ijin sebagai berikut :
P ijin Tekan = 45 ton
P ijin Tarik = 10 ton
file:///conversion/tmp/scratch/435233483.xlsx
Driven Pile Load Capacity ( BH-2<PT Daya Creasi Mitrayasa>)
P allowable = ( Qp + Qs ) / 3 (Compression)
P allowable = Qs / 5 (Tension)
- Tahanan Friksi
- Tahanan Ujung
qp = 25 x Np
= 25 x 50
= 1,250 Ton/m2
K = 4 x 0.25 = 1.00 m
file:///conversion/tmp/scratch/435233483.xlsx
Driven Pile Load Capacity ( BH-5<PT Daya Creasi Mitrayasa>)
P allowable = ( Qp + Qs ) / 3 (Compression)
P allowable = Qs / 5 (Tension)
- Tahanan Friksi
- Tahanan Ujung
qp = 25 x Np
= 25 x 50
= 1,250 Ton/m2
K = 4 x 0.25 = 1.00 m
file:///conversion/tmp/scratch/435233483.xlsx
Driven Pile Load Capacity ( BH-6<PT Daya Creasi Mitrayasa>)
P allowable = ( Qp + Qs ) / 3 (Compression)
P allowable = Qs / 5 (Tension)
- Tahanan Friksi
- Tahanan Ujung
qp = 25 x Np
= 25 x 50
= 1,250 Ton/m2
K = 4 x 0.25 = 1.00 m
file:///conversion/tmp/scratch/435233483.xlsx
Driven Pile Load Capacity ( BH-6<PT Daya Creasi Mitrayasa>)
P allowable = ( Qp + Qs ) / 3 (Compression)
P allowable = Qs / 5 (Tension)
- Tahanan Friksi
- Tahanan Ujung
qp = 25 x Np
= 25 x 50
= 1,250 Ton/m2
K = 4 x 0.25 = 1.00 m
file:///conversion/tmp/scratch/435233483.xlsx
Driven Pile Load Capacity ( BH-5<PT Daya Creasi Mitrayasa>)
P allowable = ( Qp + Qs ) / 3 (Compression)
P allowable = Qs / 5 (Tension)
- Tahanan Friksi
- Tahanan Ujung
qp = 25 x Np
= 25 x 50
= 1,250 Ton/m2
K = 4 x 0.25 = 1.00 m
file:///conversion/tmp/scratch/435233483.xlsx
Daya Dukung Tiang Pancang 450 x 450 mm
Depth vs Pizin
-1.00
meter
-2.00
-3.00
0 5 10 15 20 25 30 35
ton
BH-1 (-14m)