0% found this document useful (0 votes)
23 views1 page

Anggaran Dana NO Anggaran Pengeluaran Jumlah Total

This document contains a budget listing 17 items with details on quantity, price per unit, and total cost. The largest expenses are Rp. 500,000 for uniforms and Rp. 2,000,000 for transportation from Jambi to Bungo. In total, the budget amounts to Rp. 4,508,000.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Anggaran Dana NO Anggaran Pengeluaran Jumlah Total

This document contains a budget listing 17 items with details on quantity, price per unit, and total cost. The largest expenses are Rp. 500,000 for uniforms and Rp. 2,000,000 for transportation from Jambi to Bungo. In total, the budget amounts to Rp. 4,508,000.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ANGGARAN DANA

NO ANGGARAN PENGELUARAN JUMLAH TOTAL


1. Transportasi Jambi- Bungo @400.000X 5 orang Rp. 2.000.000
Transportasi Bungo-ke lokasi @ 200.000x 5 orang Rp. 1.000.000
2. Beras 5 kg @ 60.000 Rp. 60.000
3. Sarden @ 10.000x 3 klg Rp. 30.000
4. Pop mie @ 4.000x 12 Rp. 48.000
5. Susu SKM sachet @ 8.000x 7 pack Rp. 56.000
6. Gelas plastik @ 20.000 Rp. 20.000
7. Roti tawar @ 11.000x5 pack Rp. 55.000
8. Minyak goreng @ 15.000 Rp. 15.000
9. Buku @ 36.000x 4 pack Rp. 144.000
10. pensil @20.000x 4 pack Rp. 80.000
11. sikat gigi 1 pack isi 3 @ 10.000x 14 pack Rp. 140.000
12. Pasta Gigi @ 10.000x 5 pcs Rp. 50.000
13. Sabun @ 3.000 x 5 pcs Rp. 15.000
14. Shampo @ 15.000 x 5 pcs Rp. 75.000
15. Snack @ 5.000 x 40 Rp. 200.000
16. Plastik pembungkus snack @ 20.000 Rp. 20.000
17. Seragam Pelaksana @ 100.000 x 5 pcs Rp. 500.000
TOTAL =Rp. 4.508.000

You might also like