2 A Company Asked Their Employees How Long They Took To Travel To Work One Day
2 A Company Asked Their Employees How Long They Took To Travel To Work One Day
2 A company asked their employees how long they took to travel to work one day.
The table summarises the times for 120 employees.
Time
(t minutes) 0 1 t G 20 20 1 t G 40 40 1 t G 60 60 1 t G 80 80 1 t G 100
Frequency 12 28 45 22 13
Time
(t minutes) tG0 t G 20 t G 40 t G 60 t G 80 t G 100
Cumulative
0 120
frequency
[1]
(ii) On the grid, draw a smooth cumulative frequency curve to represent these results.
120
100
80
Cumulative
frequency
60
40
20
0
0 20 40 60 80 100
Time (t minutes)
[2]
(c) Calculate an estimate of the mean time taken for the employees to travel to work.
2 Sunil recorded the lengths, in minutes, of the 150 phone calls he made one month.
His results are summarised in the table.
Frequency
density
0
0 10 20 30 40 50
Length of call (t minutes)
[3]
(c) Find an estimate for the percentage of Sunil’s calls that were longer than 25 minutes.