Desk Study Report of Saurya
Desk Study Report of Saurya
Desk Study Report of Saurya
OF
SAURYA KHOLA DAM PROJECT (SKDP)
ARGHAKHANCHI DISTRICT
JUNE 2018
JESTHA 2075
SUBMITTED BY:
MANNINGS CONSULT PVT.LTD
KUPONDOLE, LALITPUR
SUBMITTED TO:
OFFICE OF PANINI RURAL MUNICIPALITY, ARGHAKHACHI,
NEPAL
TABLE OF CONTENTS
1. INTRODUCTION ...........................................................................................................................1
2. SURVEY LICENSE FOR FURTHER STUDIES ..........................................................................1
3. LOCATION .....................................................................................................................................1
4. AVAILABLE MAPS.......................................................................................................................1
5. HYDROLOGICAL DATA .............................................................................................................1
6. THE PROJECT................................................................................................................................3
7. POWER AND ENERGY OUTPUT ................................................................................................4
8. REVENUE .......................................................................................................................................5
10. COST ESTIMATE ........................................................................................................................5
ANNEX ...............................................................................................................................................6
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 1
1. INTRODUCTION
A preliminary desk study has been carried out base done on the available maps and site
observation with a view of identifying potential dam sites on Arghakhanchi districts. A team
consisting of civil engineers has a plan to visit the site to verify the site of the project. The
details from this investigation are presented in this document.
To verify the findings of this preliminary study and also to upgrade it, additional studies will
be required. This would include visits to site, survey of the area, and some field investigations
to proceed to “Feasibility Study” level. Survey License is to be taken from department of
electricity for hydropower production.
3. LOCATION
Saurya Khola is one of the small tributaries of Kaligandagi River. The proposed Saurya Khola
Dam Project (SKDP) is located Argha Gaun( Kharjing), Arghakhanchi district of the State – 5
of Nepal. The proposed Dam of the project lies at approximately 830 16’ 13’’ E and 270 56’ 25’
N and an elevation of 716.0 masl.
The location of the project area is shown in Appendix A. The villages bordering the project
area are shown in Table 2.
4. AVAILABLE MAPS
1:25,000 topographical counter map (Sheet No. 2785 02A) published by Survey Department
of Government of Nepal operation with Government of Finland has been used in the desk
study.
5. HYDROLOGICAL DATA
Saurya Khola is an ungauged stream, therefore at the stage of study, the methods applicable
for ungauged catchment HYDEST (WECS), MHSP and CAR with Jhimruk Khola (Station No.
339.5) methods are used. Sauryakhola is one of the small tributary of Kaligandagi River.
The catchment area of Saurya Khola Dam Project at Dam site is shown in Appendix A.
1
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 2
HYDEST results
The parameters used for the estimation of flow at intake is Shown in Table 3.
Summary of results from the various method of analysis is shown in Table 4 to Table 5. Table
6 gives the flow duration curve based on CAR method. The flow for 40% probability of
exceedance is used to estimate the installed capacity of the project.
Table 5 Flow Duration Data for Saurya Khola at Proposed Dam Site
2
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 3
6. THE PROJECT
The Project has been studied in different dam options. The dam height will be varied from 10
to 30m. The reservoir volume and pondage area available is presented in table 7.
The live storage in the impounded reservoir can be utilized further for small scale hydropower
project. The area capacity curve of the dam axis is shown below.
Cum. Volume
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
750
745
740
Elevation (m)
735
730
725
720
715
710
50.00 45.00 40.00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00
Area (Ha)
Figure 1 Reservoir Area capacity Curve
At the preliminary stage of study of 30m dam, live storage will be 1.90 million cubic meter
(MCM). For the design discharge of 1.29 m3/s the duration available for hydroelectricity
3
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 4
generation will be approximately 2 days continuously. The project has powerhouse at toe of
the dam to generate hydropower. The gross head for the project will be 25m.
Monthly Average
Monthly Average
Overal Efficiency
Available Flow
Energy (GWh)
Energy (GWh)
Monthly Avg.
Net Head (m)
Net Turbine
No.of Units
Discharge
Capacity
Month
Days
Jan 1.92 1.29 2 0.64 100% 88.29% 23.13 0.26 31 0.19 0.01 0.18 0.18
Feb 1.61 1.29 2 0.64 100% 88.29% 23.13 0.26 28 0.17 0.01 0.16 0.16
Mar 1.45 1.29 2 0.64 100% 88.29% 23.13 0.26 31 0.19 0.01 0.18 0.18
Apr 1.15 1.04 2 0.52 81% 87.48% 23.48 0.21 30 0.15 0.01 0.14 0.14
May 1.25 1.13 2 0.57 88% 88.11% 23.34 0.23 31 0.17 0.01 0.16 0.16
Jun 5.38 1.29 2 0.64 100% 88.29% 23.13 0.26 30 0.19 0.01 0.18 0.18
Jul 21.35 1.29 2 0.64 100% 88.29% 23.13 0.26 31 0.19 0.01 0.18 0.18
Aug 28.56 1.29 2 0.64 100% 88.29% 23.13 0.26 31 0.19 0.01 0.18 0.18
Sep 23.72 1.29 2 0.64 100% 88.29% 23.13 0.26 30 0.19 0.01 0.18 0.18
Oct 9.64 1.29 2 0.64 100% 88.29% 23.13 0.26 31 0.19 0.01 0.18 0.18
Nov 3.70 1.29 2 0.64 100% 88.29% 23.13 0.26 30 0.19 0.01 0.18 0.18
Dec 2.30 1.29 2 0.64 100% 88.29% 23.13 0.26 31 0.19 0.01 0.18 0.18
365 2.199 0.11 2.09 1.01 1.08
4
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 5
8. REVENUE
The PPA rate defined by NEA for dry month is 8.4 month and 4.8 for wet month for which the
total yearly revenue from the generating power will be approximately NRs 1.4 crore.
C Hydropower Construction
Intake, Waterway Construction 5,000,000
Powerhouse 1 6,000,000
Hydromechanical (Penstock Pipe,
Gates and accessories) 2,000,000
Electromechanical (Turbine and
Accessories) 2 8,000,000
Sub Total 21,000,000
Total (A+B+C) 670,858,000
5
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 6
ANNEX
PONDAGE AREA MAP
CATCHMENT AREA MAP
GOOGLE MAP OF PROJECT LOCATION
TYPICAL DAM SECTION
MAP OF PADINI RURAL MUNICIPALITY, ARGHAKHACHI
PHOTOGRAPHS
JUNE 2018
6
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 7
Dam Axis
Pondage Area
PONDAGE AREA MAP (DAM HEIGHT 10M DAM TOP AT 725 AMSL)
Dam Axis
Pondage Area
PONDAGE AREA MAP (DAM HEIGHT 15M DAM TOP AT 730 AMSL)
7
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 8
Dam Axis
Pondage Area
PONDAGE AREA MAP (DAM HEIGHT 20M DAM TOP AT 735 AMSL)
Dam Axis
Pondage Area
PONDAGE AREA MAP (DAM HEIGHT 25M DAM TOP AT 740 AMSL)
8
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 9
9
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 10
Dam Axis
10
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 11
11
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 12
PHOTOGRAPHS
12
PRELIMINARY DESK STUDY REPORT of SAURYA KHOLA DAM PROJECT(SKDP) 13
13