Aluminum Shuttering Work Checklist

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1/ 6

Project:

Date :
Aluminum Shuttering work Activity Location.:

Aluminum shuttering Work Checklist


S. NO. Descriptions 1 2 3 4 5 6 7 8
YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO

A. GENERAL
1.0 Is all workmen safety induction done?
2.0 Is supervisor available for the job?
3.0 Is condition of lifeline PP rope is fine?
4.0 Is TBT is provided to workers?
5.0 Is catch nets provided below the working floor?
6.0 Is all workmen gone through vertigo test and passed?
Is all workmen provided with appropriate PPEs (Safety shoes,
7.0 Safety Helmet, Safety full body harness, safety goggles, ear plug,
safety hand gloves, gum boots)?

8.0 Is all power tools rotating parts guarded?


9.0 Is power tools provided with plug top?
10.0 Is sufficient illumaination level provided?
Is working crew is trained and aware of Hazards and its control
11.0 measures?
B. Bracket Inspection/Erection
Is below floor external working platform provided with walkway
1.0 jally?

2.0 Is vertical nets provided at the below external platform?


3.0 Is all workmen trained for bracket erection activities?
4.0 Is all parts of bracker is tied with PP rope while lifting ?
Bracket Condtions
Is physical conditions of the bracket (Cracks in holes/edges,
1.0 Wear, Bend) in good condition?

2.0 Is the material Rusted?


Tie Rod Conditions
Is physical conditions of the bracket (Cracks, Wear, Bend) in good
1.0 condition?

2.0 Is the material Rusted?


Wing Nut
1.0 Is any wear in the Thread?
2.0 Any other disortion
Walkway Gratings
1.0 Is there any bend?
2.0 Is any Crack in welding?
Railings
1.0 Is any crack in the L Bracket of short post?
2.0 IS any burr/damage in the insert point of the post?

Is insert part of the vertical railing is lubricated?


3.0

4.0 Is there any bend in vertical and horizontal?


C. Shutteringa/reinforcement Work
Is shuttering materials and rods/rings segregated/Stacked away
1.0
form the access?
Is all walkway gratings placed at external working platform?
2.0
Is vertical Safety net is provided on the external working
3.0 platform?
5.0 Is balcony area hard baricaded?
Is all shaft openings covered with reinforcement mesh?
6.0
Is lift shaft opening fully covered with walkway gratings?
7.0
8.0 Is the staircase handrail provided?
9.0 Is Life line rope provided at the slab top?
10.0 Is slab edge barrication done after slab shuttering?
D. Concreting
1.0 Is concrete pipelline supported properly?
2.0 Is lean strength of person allowed for concreting?
Is rotation method follow in concrete work to avoid continues
3.0
working ?
D. Dismantling of Bracket
1.0 Is workers provided with Safety full body harness?
2.0 Is PP rope used for lifting in good condition?
Is place for stacking the dismantled materials identified?
3.0
4.0 Is area underneath the dismantling work barricaded?
5.0 Is working platfrom free from dismantled materials?
Inspection Team:-

Sign site engg(SPPCL)

Sign safety engg(SCCPL)

Sign safety officer (SPBPL)


Revision No.:
Page No.:
Inspection Report No:-