DESIGN ON SLAB PUNCHING SHEAR
PROJECT : IR
JOB NO. : Universal Studio
LOCATION : FC-07
PREPARED BY : KS
A. INPUT DATA
fcu = 55 N/mm2
fy = 460 N/mm2
fyv = 460 N/mm2
Thickness of Slab, h = 600 mm
Concrete Cover, c = 50 mm
Slab Reinft. Provided, Ast = T 16 - 200 c/c (TT) and T 0- 250 c/c (T)
= 1005 mm2 + 0 mm2
= 1005 mm2
Asb = T 16 - 200 c/c (BB) and T 0- 250 c/c (B)
= 1005 mm2 + 0 mm2
= 1005 mm2
Effective depth, d= 534 mm
Column Size, Cx = 800 mm
Cy = 800 mm
Column Load, Vult = 1875 KN
B. CONCRETE SHEAR STRESS
CP 65 Cl.3.4.5.4 & Table 3.9
(100*Asb)/(bv*d) = 0.188 should not be greater than 3.
400/d = 0.749 or 1.0 whichever is greater.
(fcu/30)1/3 = 1.224
vc = 0.412 N/mm2
C. CHECK SHEAR @ COLUMN FACE
CP 65 Cl.3.7.6.4 & Cl.3.7.7.2
Uc = 2*(Cx+Cy)
= 3200 mm
v= Vult/(Uc*d)
= 1.097 N/mm2 less than vmax, O.K.
where
vmax = 0.8*fcu^0.5 or 5 N/mm2 whichever smaller
= 5 N/mm2
D. CHECK SHEAR @ 1.5d FROM COLUMN FACE (ZONE 1)
av = 1.5d = 801 mm
Perimeter, Up = 12*d+2*(Cx+Cy)
= 9608 mm
CP 65 Cl.3.7.7.3 & Cl.3.7.7.4
v= Vult/(Up*d)
= 0.365 N/mm2 less than vc,
O.K., No Shear Links is required.
vc = 0.412 N/mm2
v/vc = 0.89
SAsv*sina >= No Shear Links required.
CP 65 Cl.3.7.7.6 & Fig.3.17
Provided Links, 10 T 13 - 250 c/c, Asv = 10202 mm2, N.A.
(At least two perimeters of Links) (<=1.5d)
(<= 801 mm )
DESIGN ON SLAB PUNCHING SHEAR
PROJECT : IR
JOB NO. : MICHAEL
LOCATION : CX22-CY2-1
PREPARED BY : KS
A. INPUT DATA
fcu = 55 N/mm2
fy = 460 N/mm2
fyv = 460 N/mm2
Thickness of Slab, h = 2500 mm
Concrete Cover, c = 50 mm
Slab Reinft. Provided, Ast = T 32 - 250 c/c (TT) and T 0- 250 c/c (T)
= 3217 mm2 + 0 mm2
= 3217 mm2
Asb = T 40 - 125 c/c (BB) and T 0- 250 c/c (B)
= ### mm2 + 0 mm2
= ### mm2
Effective depth, d= 2410 mm
Column Size, Cx = 1200 mm
Cy = 1200 mm
Column Load, Vult = ### KN
B. CONCRETE SHEAR STRESS
CP 65 Cl.3.4.5.4 & Table 3.9
(100*Asb)/(bv*d) = 0.417 should not be greater than 3.
400/d = 0.166 or 1.0 whichever is greater.
(fcu/30)1/3 = 1.224
vc = 0.537 N/mm2
C. CHECK SHEAR @ COLUMN FACE
CP 65 Cl.3.7.6.4 & Cl.3.7.7.2
Uc = 2*(Cx+Cy)
= 4800 mm
v= Vult/(Uc*d)
= 2.42 N/mm2 less than vmax, O.K.
where
vmax = 0.8*fcu^0.5 or 5 N/mm2 whichever smaller
= 5 N/mm2
D. CHECK SHEAR @ 1.5d FROM COLUMN FACE (ZONE 1)
av = 1.5d = 3615 mm
Perimeter, Up = 12*d+2*(Cx+Cy)
= ### mm
CP 65 Cl.3.7.7.3 & Cl.3.7.7.4
v= Vult/(Up*d)
= 0.345 N/mm2 less than vc,
O.K., No Shear Links is required.
vc = 0.537 N/mm2
v/vc = 0.64
SAsv*sinS >= No Shear Links required.
CP 65 Cl.3.7.7.6 & Fig.3.17
Provided Links, 2 T 0- 250 c/c, Asv = 0 mm2, N.A.
(At least two perimeters of Links) (<=1.5d)
(<= 3615 mm )
DESIGN ON SLAB PUNCHING SHEAR
PROJECT : IR
JOB NO. : Maxims
LOCATION : CX24-CY4
PREPARED BY : KS
A. INPUT DATA
fcu = 55 N/mm2
fy = 460 N/mm2
fyv = 460 N/mm2
Thickness of Slab, h = 1200 mm
Concrete Cover, c = 50 mm
Slab Reinft. Provided, Ast = T 25 - 250 c/c (TT) and T 32 - 250 c/c (T)
= 1963 mm2 + 3217 mm2
= 5180 mm2
Asb = T 20 - 250 c/c (BB) and T 40 - 250 c/c (B)
= 1257 mm2 + 5027 mm2
= 6283 mm2
Effective depth, d= 1130 mm
Column Size, Cx = 800 mm
Cy = 800 mm
Column Load, Vult = 11100 KN
B. CONCRETE SHEAR STRESS
CP 65 Cl.3.4.5.4 & Table 3.9
(100*Asb)/(bv*d) = 0.556 should not be greater than 3.
400/d = 0.354 or 1.0 whichever is greater.
(fcu/30)1/3 = 1.224
vc = 0.591 N/mm2
C. CHECK SHEAR @ COLUMN FACE
CP 65 Cl.3.7.6.4 & Cl.3.7.7.2
Uc = 2*(Cx+Cy)
= 3200 mm
v= Vult/(Uc*d)
= 3.07 N/mm2 less than vmax, O.K.
where
vmax = 0.8*fcu^0.5 or 5 N/mm2 whichever smaller
= 5 N/mm2
D. CHECK SHEAR @ 1.5d FROM COLUMN FACE (ZONE 1)
av = 1.5d = 1695 mm
Perimeter, Up = 12*d+2*(Cx+Cy)
= ### mm
CP 65 Cl.3.7.7.3 & Cl.3.7.7.4
v= Vult/(Up*d)
= 0.586 N/mm2 less than vc,
O.K., No Shear Links is required.
vc = 0.591 N/mm2
v/vc = 0.99
SAsv*sinS >= No Shear Links required.
CP 65 Cl.3.7.7.6 & Fig.3.17
Provided Links, 2 T 0- 300 c/c, Asv = 0 mm2, N.A.
(At least two perimeters of Links) (<=1.5d)
(<= 1695 mm )
DESIGN ON SLAB PUNCHING SHEAR
PROJECT : IR
JOB NO. : MICHAEL
LOCATION : CX17-CY22
PREPARED BY : KS
A. INPUT DATA
fcu = 55 N/mm2
fy = 460 N/mm2
fyv = 460 N/mm2
Thickness of Slab, h = 1200 mm
Concrete Cover, c = 50 mm
Slab Reinft. Provided, Ast = T 25 - 250 c/c (TT) and T 0- 250 c/c (T)
= 1963 mm2 + 0 mm2
= 1963 mm2
Asb = T 20 - 250 c/c (BB) and T 40 - 250 c/c (B)
= 1257 mm2 + 5027 mm2
= 6283 mm2
Effective depth, d= 1130 mm
Column Size, Cx = 800 mm
Cy = 800 mm
Column Load, Vult = 6500 KN
B. CONCRETE SHEAR STRESS
CP 65 Cl.3.4.5.4 & Table 3.9
(100*Asb)/(bv*d) = 0.556 should not be greater than 3.
400/d = 0.354 or 1.0 whichever is greater.
(fcu/30)1/3 = 1.224
vc = 0.591 N/mm2
C. CHECK SHEAR @ COLUMN FACE
CP 65 Cl.3.7.6.4 & Cl.3.7.7.2
Uc = 2*(Cx+Cy)
= 3200 mm
v= Vult/(Uc*d)
= 1.798 N/mm2 less than vmax, O.K.
where
vmax = 0.8*fcu^0.5 or 5 N/mm2 whichever smaller
= 5 N/mm2
D. CHECK SHEAR @ 1.5d FROM COLUMN FACE (ZONE 1)
av = 1.5d = 1695 mm
Perimeter, Up = 12*d+2*(Cx+Cy)
= ### mm
CP 65 Cl.3.7.7.3 & Cl.3.7.7.4
v= Vult/(Up*d)
= 0.343 N/mm2 less than vc,
O.K., No Shear Links is required.
vc = 0.591 N/mm2
v/vc = 0.58
SAsv*sinS >= No Shear Links required.
CP 65 Cl.3.7.7.6 & Fig.3.17
Provided Links, 2 T 0- 300 c/c, Asv = 0 mm2, N.A.
(At least two perimeters of Links) (<=1.5d)
(<= 1695 mm )
DESIGN ON SLAB PUNCHING SHEAR
PROJECT : KAKI BUKIT DORMITORY
JOB NO. : N/A
LOCATION : 2F FLAT SLAB
PREPARED BY : NADA
A. INPUT DATA
fcu = 35 N/mm2
fy = 460 N/mm2
fyv = 460 N/mm2
Thickness of Slab, h = 200 mm
Concrete Cover, c = 30 mm
Slab Reinft. Provided, Ast = T 10 - 200 c/c (TT) and T 10 - 400 c/c (T)
= 393 mm2 + 196 mm2
= 589 mm2
Asb = T 10 - 200 c/c (BB) and T 0- 100 c/c (B)
= 393 mm2 + 0 mm2
= 393 mm2
Effective depth, d= 160 mm
Column Size, Cx = 250 mm
Cy = 900 mm
Column Load, Vult = 111 KN
B. CONCRETE SHEAR STRESS
CP 65 Cl.3.4.5.4 & Table 3.9
(100*Asb)/(bv*d) = 0.245 should not be greater than 3.
400/d = 2.5 or 1.0 whichever is greater.
(fcu/30)1/3 = 1.053
vc = 0.538 N/mm2
C. CHECK SHEAR @ COLUMN FACE
CP 65 Cl.3.7.6.4 & Cl.3.7.7.2
Uc = 2*(Cx+Cy)
= 2300 mm
v= Vult/(Uc*d)
= 0.302 N/mm2 less than vmax, O.K.
where
vmax = 0.8*fcu^0.5 or 5 N/mm2 whichever smaller
= 4.733 N/mm2
D. CHECK SHEAR @ 1.5d FROM COLUMN FACE (ZONE 1)
av = 1.5d = 240 mm
Perimeter, Up = 12*d+2*(Cx+Cy)
= 4220 mm
CP 65 Cl.3.7.7.3 & Cl.3.7.7.4
v= Vult/(Up*d)
= 0.164 N/mm2 less than vc,
O.K., No Shear Links is required.
vc = 0.538 N/mm2 <
v/vc = 0.31
SAsv*sinS >= No Shear Links required.
CP 65 Cl.3.7.7.6 & Fig.3.17
Provided Links, 0 T 0- 100 c/c, Asv = 0 mm2, N.A.
(At least two perimeters of Links) (<=1.5d)
(<= 240 mm )
DESIGN ON SLAB PUNCHING SHEAR
PROJECT : JALAN LEMPENG
JOB NO. : N/A
LOCATION : 8 TH FLAT SLAB
PREPARED BY : PS
A. INPUT DATA
fcu = 30 N/mm2
fy = 460 N/mm2
fyv = 460 N/mm2
Thickness of Slab, h = 200 mm
Concrete Cover, c = 25 mm
Slab Reinft. Provided, Ast = T 10 - 200 c/c (TT) and T 0 - 400 c/c (T)
= 393 mm2 + 0 mm2
= 393 mm2
Asb = T 10 - 200 c/c (BB) and T 0 - 100 c/c (B)
= 393 mm2 + 0 mm2
= 393 mm2
Effective depth, d = 165 mm
Column Size, Cx = 200 mm
Cy = 200 mm
Column Load, Vult = 11 KN
B. CONCRETE SHEAR STRESS
CP 65 Cl.3.4.5.4 & Table 3.9
(100*Asb)/(bv*d) = 0.238 should not be greater than 3.
400/d = 2.424 or 1.0 whichever is greater.
(fcu/30)1/3 = 1.000
vc = 0.52 N/mm2
C. CHECK SHEAR @ COLUMN FACE
CP 65 Cl.3.7.6.4 & Cl.3.7.7.2
Uc = 2*(Cx+Cy)
= 800 mm
v = Vult/(Uc*d)
= 0.083 N/mm2 less than vmax, O.K.
where
vmax = 0.8*fcu^0.5 or 5 N/mm2 whichever smaller
= 4.382 N/mm2
D. CHECK SHEAR @ 1.5d FROM COLUMN FACE (ZONE 1)
av = 1.5d = 247.5 mm
Perimeter, Up = 12*d+2*(Cx+Cy)
= 2780 mm
CP 65 Cl.3.7.7.3 & Cl.3.7.7.4
v = Vult/(Up*d)
= 0.024 N/mm2 less than vc,
O.K., No Shear Links is required.
vc = 0.52 N/mm2 <
v/vc = 0.05
SAsv*sinS >= No Shear Links required.
CP 65 Cl.3.7.7.6 & Fig.3.17
Provided Links, 1 T 10 - 200 c/c, Asv = 3275 mm2, N.A.
(At least two perimeters of Links) (<=1.5d)
(<= 247.5 mm )