YANBU II POWER AND WATER PROJECT

Power & Water production facilities

Daily Check List Of Urea System EHT- #21

Serial Length Temp Curent Temp(03.05~03.10)


EHT No. Location
No. [m] Setting Sat(3.05) Son(3.06) Mon(3.07) Tue(3.08) Wends(3.09) Thur(3.10)
EHT-15 174 After EHT-005
1 170 122 118 118 117 119 121
EHT-16 174 To #23 Unit
EHT-19 120 After No.3 To
2 170 141 140 142 142 140 141
EHT-20 120 #21 SCR
EHT-10 147 After EHT-006
3 170 139 137 136 136 134 136
EHT-11 147 To #21 Unit

4 EHT-12 174 After EHT-004 170 132 130 130 130 132 152
To #22 Unit
Hydrolyzer To
5 EHT-001 174 45 45 45 45 45 45 45
Tank Return
EHT-002A 7 DN-P-301A,B
6 45 36 34 34 35 36 38
EHT-002B 67 Suc & Disch

Hydrolyzer To
7 EHT-003 80 170 102 97 98 98 103 105
Pit Drain

#22 Supply
8 EHT-004 150 170 169 171 165 164 165 167
#21 Common

#23 Supply
9 EHT-005 150 170 169 165 166 166 167 170
#22 Common

#21 Supply
10 EHT-006 150 170 121 116 116 116 116 116
#23 Common

Hydrolyzer To
11 EHT-007 82 154 152 155 138 154 152 152
Quench Tank

Hydrolyzer
12 EHT-008 79 45 45 44 45 44 45 45
Vent To Tank
EHT-009A 56 DN-P-302A,B
13 45 46 51 57 62 67 72
EHT-009B 24 Suc & Disch

#21 SCR
14 EHT-021 60 170 145 146 147 147 144 146
(Reactor-#A)

#21 SCR
15 EHT-022 50 170 144 145 146 146 143 145
(Reactor-#B)
EHT-023 23 Tank To
16 45 36 35 35 35 36 38
EHT-024 56 Hydrolyzer

Hydrolyzer Outlet Temp[℃] 131 132 132 133 135 135

Atmosphere Temp(℃) 32 21 20 22 22 24
EHT-015,010,012,004 RTD 부위 재시공함

Remark
EHT-15,16(23호기 Pipe Rack위) 배관수정 완료 보온 해체 상태, 작업 완료후 c/i(2.18)
YANBU II POWER AND WATER PROJECT
Power & Water production facilities

Daily Check List Of Urea System EHT- #22 & #

Serial Length Temp Current Temp(02.06~02


Unit EHT No. Location
No. [m] Set Sat(3.05) Son(3.06)Mon(3.07)
EHT-013 174 Above Pipe Rack
1 170 133 131 131
EHT-014 174 Pipe Rack & Vertical

2 EHT-023 120 Vertical Before No.3 170 168 172 169

3 EHT-024 120 Vertical 170 166 168 169

4 EHT-025 60 To #A Reactor 170 172 171 167

#22 5 EHT-026 50 To #B Reactor 170 148 148 148

Condition Of Oper(Y: Oper, N: Not Oper) N N N

EHT-025, 026 Cable 작업 완료(SCR전 배관 계측기 및 Vv 부위 보강 재시공 완료), c/i(

EHT-025(12.21) Breaker 교체(12.25)후 양호


Remark

Atmosphere Temperature[℃] 32 21 20

EHT-017 174 Above Pipe Rack


1 170 121 108 104
EHT-018 174 Pipe Rack & Vertical
Vertical Line Before
2 EHT-027 120 170 157 150 149
No.3

3 EHT-028 120 Vertical Line 170 169 171 171

4 EHT-029 60 To #A Reactor 170 172 171 172

5 EHT-030 50 To #B Reactor 170 171 168 167

Condition Of Oper(Y: Oper, N: Not Oper) N N N

#23

EHT-028: EHT Insulation Resistance 0.3[MΩ], 2.20: 1.76[MΩ] c/i

Remark
No.1(EHT-017,018) 배관수정완, 작업 완료, c/i(2.18)

Remark
EHT-029,030 c/o(11.27) For Cable 재시공 예정, 완료 c/i(1.4),c/o후 재c/i(2.18)
T- #22 & #23

rent Temp(02.06~02.11)
Tue(3.08)Wends(3.09)
Thur(3.10)

132 132 161

169 171 169

171 166 161

171 172 168

148 148 154

N N Y

보강 재시공 완료), c/i(12.20)

22 22 24

119 127 138

152 157 154

168 166 166

171 170 172

169 170 170

N N N

Ω] c/i
4),c/o후 재c/i(2.18)