Daily Check List of EHT For Urea
Daily Check List of EHT For Urea
Daily Check List of EHT For Urea
4 EHT-12 174 After EHT-004 170 132 130 130 130 132 152
To #22 Unit
Hydrolyzer To
5 EHT-001 174 45 45 45 45 45 45 45
Tank Return
EHT-002A 7 DN-P-301A,B
6 45 36 34 34 35 36 38
EHT-002B 67 Suc & Disch
Hydrolyzer To
7 EHT-003 80 170 102 97 98 98 103 105
Pit Drain
#22 Supply
8 EHT-004 150 170 169 171 165 164 165 167
#21 Common
#23 Supply
9 EHT-005 150 170 169 165 166 166 167 170
#22 Common
#21 Supply
10 EHT-006 150 170 121 116 116 116 116 116
#23 Common
Hydrolyzer To
11 EHT-007 82 154 152 155 138 154 152 152
Quench Tank
Hydrolyzer
12 EHT-008 79 45 45 44 45 44 45 45
Vent To Tank
EHT-009A 56 DN-P-302A,B
13 45 46 51 57 62 67 72
EHT-009B 24 Suc & Disch
#21 SCR
14 EHT-021 60 170 145 146 147 147 144 146
(Reactor-#A)
#21 SCR
15 EHT-022 50 170 144 145 146 146 143 145
(Reactor-#B)
EHT-023 23 Tank To
16 45 36 35 35 35 36 38
EHT-024 56 Hydrolyzer
Atmosphere Temp(℃) 32 21 20 22 22 24
EHT-015,010,012,004 RTD 부위 재시공함
Remark
EHT-15,16(23호기 Pipe Rack위) 배관수정 완료 보온 해체 상태, 작업 완료후 c/i(2.18)
YANBU II POWER AND WATER PROJECT
Power & Water production facilities
Atmosphere Temperature[℃] 32 21 20
#23
Remark
No.1(EHT-017,018) 배관수정완, 작업 완료, c/i(2.18)
Remark
EHT-029,030 c/o(11.27) For Cable 재시공 예정, 완료 c/i(1.4),c/o후 재c/i(2.18)
T- #22 & #23
rent Temp(02.06~02.11)
Tue(3.08)Wends(3.09)
Thur(3.10)
N N Y
22 22 24
N N N
Ω] c/i
4),c/o후 재c/i(2.18)