Usage Guidelines :
Test script format - The format/flow of the test script is generic. Specific changes to the flow will be required
be done by the client team to meet client requirement.
Test script content - The content explains the process in a generic manner. Specific changes will be required
be done by client team to suit cleint requirement.
Master data & Transaction Data - This test script assumes that master data and transactional data is as
available in CNR COE landscape.
any part thereof may be copied or
ge without the prior consent of
d supplement without prior notice.
Version Details :
Version Version details Date
Document Control:
Document Information
Location
Owning Team
Contributing Team(s)
Document History
Author(s) Date Version Comments
Document Review
Name Position Action
S = Signed Approval Required, QA, Quality Assurance Review Required, FR = Formal Review Required, IR = Informal Review, I = For Information
Document Summary
Short Description
Related Documents
mal Review, I = For Information.
Client XYZ
Project XYZ
ORGANIZATION HIERARCHY
Plant BP01
Distribution Channel 01
Division 01
MASTER DATA
TRANSACTIONAL DATA
PREREQUSITIES/ENTRY CRITERIA
<<mention value/doc
<<Mention pre-requisites here>> number here >>
Test Case Name: Make To Order Scenario for Depo Sales
Step # Step Description T-Code
Schedule line
Order incompletion
20 MRP run
Navigate Request for MRP MD02
execution Logistics -->
Production - Process --> MRP -->
Planning --> MD02 - Multilevel
Single-Item Planning
30 MRP evaluation
Stock Requirement List: Navigation MD4C
Logistics --> Production - Process
--> MRP -->Evaluation --> MD05 -
Stock/Requirements List
Press Execute
Release Order
180 Confirmation, GI and GR for Bar
Production Order Confirmation for CO11N
first operation (Rolling mill) and other
operations
Press Save
Select Ok for the popup appear
Press Save
Materia = Sales Order Material created in 1a
Plant = 1700
Processing key = NETCH
Create purchase req. : 1
Delivery Schedules : 3
Create MRP list : 1
Planning Mode : 1
Scheduling : 2
Radio button "Also plan unchanged components" selected
Press
r (REM process)
Material no. = 11000001
Plant = 1700
Put selection button on Material and Material no. = 11000001
Plant = 1700
Inspection Lot Origin = 13
Material = 11000001
On pressing result recording button, system displays result recording
screen with MICs specification.
Plant = 1700
Inspection Lot Origin = 04
Material = 11000001
On pressing result recording button, system displays result recording
screen with MICs specification.
On pressing Usage decision button, system displays UD screen for the
Inspection lot.
Plant = 1700
Inspection Lot Origin = 04
Material = 11000002
On pressing result recording button, system displays result recording
screen with MICs specification.
On pressing Usage decision button, system displays UD screen for the
Inspection lot
In the Production Order Header screen, Order qty Order start date and
Finish date will appear from the Planned Order. Since Liquid Steels are
configurable and Production is happening in MTS scenario, so
configuration of the Order will come from Material master.
If the Production of the Liquid Steel is happening to make a particular
type of Steel Bar with different Sub grade value then in Production
Order Fast Entry tab after selecting character display gr.' Liquid Steel'
Sub grade, Customer and Sales Order no. to be entered
Plant = 1700
Inspection Lot Origin = 03
Material = Any Liquid Steel Matererial variant
For Liquid Steel In-process Inspection point wise Inspection will be
done for three operations like BOF, LRF and VD depending upon the
type of Material.
For operation BOF after putting Inspection result for all MICs & on
saving, system will ask for the partial lot no. Only for this operation
partial Lot to be created. Heat wise Lot no. to be entered and Heat no
will be entered in the Batch field. By defaulf UD will come accepted but
if required it can be changed as per actual decision.
For LRF operation after putting Inspection result for all MICs & on
saving, system will ask for the partial lot no. Here no need to create
partial lot. Need to select proper partial lot created for BOF operation.
By defaulf UD will come accepted but if required it can be changed as
per actual decision.
For VD operation after putting Inspection result for all MICs & on
saving, system will ask for the partial lot no. Here no need to create
partial lot. Need to select proper partial lot created for BOF operation.
By defaulf UD will come accepted but if requied it can be changed as
per actual decision.
After completion of valuation of all partial lot for each Production Order,
the final UD to be done.
teel
Order: Enter Order no. from 80
Yield: Enter the quantity to be confirmed.
On pressing enter system wil propose Activity and Goods movement as
per BOM and Routing.
For Last operation (LRF/VD based on type of Liquid Steel), Auto Goods
receipt will happen. Here Heat no. to be entered in the Batch field as
well as in the Batch characteristics.
Save it.
In the Production Order Header screen, Order qty, Order start date and
Finish date will appear from the Planned Order. Since Liquid Steels are
configurable and Production is happening in MTS scenario, so
configuration of the Order will come from Material master.
If the Production of the Billet is happening to make a particular type of
Steel Bar with different Sub grade value, then in Production Order Fast
Entry tab after selecting character display grade 'Billet Variant' Sub
grade, Customer and Sales Order no. to be entered.
Auto Goods receipt will happen for CCM operation. In th GR Batch field,
the same Batch no (Heat no.) to be entered as that of component
Liquid Steel Batch (Heat no.)
Here Heat no. to be entered in the Batch field as well as in the Batch
characteristics.
Save it.
Plant = 1700
Inspection Lot Origin = 04
Material =
On pressing result recording button, system displays result recording
screen with MICs specification.
On pressingUsage decision button, system displays UD screen for the
Inspection lot
Order released
For 2nd operation after putting the result recording while saving
system will ask for the partial lot no. Here as per the no. of partial lot
proper description will be given and manually Batch no. to be entered.
In the yeld field actual quantity confirmed to be entered.
Here Heat no. to be entered in the Batch field as well as in the Batch
characteristics.
Save it.
After selecting Plant 1700 and STO no. from step no.220 press
execution button.
ery
For doing Proforma Invoice, STO Delivery no. to be entered and
pressed.
As per STO, Price Condition record for the Material price will get
updated and other conditions ge calculated.
Save the Invoice.
All TCD related characters will appear as per variant table K_TDC with primary
Key TDC no. and Customer.
System will perform ATP check for MTO with scope of ATP 01/AE.
After ATP check, system shall create schedule line for the Order as per
requirement date.
If all data entered automatically, system will tell the Order is complete.
In this lists RS type Planned Order will be displayed as per lot size with active
Production version.
System will display Production version wise load with available Capacity.
If required per day Planned Orders can be created as per Production load and
new RS Planned Order will be created.
If no old Inspection lot exists, system will create a new Inspection lot.
System populates all details from Planned Order, like Backflush qty, Component
details.
After entering Actual consumption of component and activities & on saving GR will
be done with 131 movement for Sinter Material and component consumption will
happen with 261 movement. Total cost of Production for GI, GR and Activity will
be collected on Product Cost Collector.
While doing GR, Stock will be posted in Quality. Post process Inspection lot will be
created.
After UD lot will be cleared and Stock will be posted in Unrestricted Stock.
In this lists RS type Planned Order will be displayed as per lot size with active
Production version.
System will display Production version wise load with available Capacity.
If required per day Planned Orders can be created as per Production load and
new RS Planned Order will be created.
System populates all details from Planned Order, like Backflush qty, Component
details.
After entering actual consumption of component and activities & on saving, GR
will be done with 131 movement for Sinter Material and component consumption
will happen with 261 movement. By-product Production will happen with 531
movement. Total cost of Production for GI, GR and Activity will be collected on
Product Cost Collector.
While doing GR, Stock will be posted in Quality. Post process Inspection lot will be
created.
After UD lot will be cleared and Stock will be posted in Unrestricted Stock.
The Production Order no. will be generated and In-process Inspection lot will be
created against the Order.
While doing UD Batch characters will get updated from Inspection result
recording. Final Inspection result either LRF or VD will get updated in Batch
characters.
GR will be posted against 101 movement. Material and FI/CO document will be
generated.
While doing GR Stock will be posted in Quality. Post process Inspection lot will be
created.
A Production Order screen will appear
GR will be posted against 101 movement. Material and FI/CO document will be
generated.
While doing GR Stock will be posted in Quality. Post process Inspection lot will be
created.
Some of the Batch characters will get populated from Production Order
configuration.
After UD lot will be cleared and Stock will be posted in Unrestricted Stock.
A Production Order screen will appear
Some of the Batch characters will get populated from Production Order
configuration and some of them from Original Batch.
ZSTO type STO will be created with Sales Order account assignment.
In the Activity Due for Shipping Purchase Order, Fast Display screen Line item will
come with Purchase Order no.
On selecting the line, press create Back ground will create Delivery against the
STO.
Goods movement will happen through 641 movement type and Material will be
moved from 1700 Plant to Stock in Transit.
Report will show all Stock in Transit qty in different line item.
System will do GR against 101 movement. Sales Order Sp. Stock will be posted in
1711 Plant.
System will retrieve all details of Sales order
Goods movement will happen through 601 movement and Material will be moved
from 1711 Plant to Customer.
Single-Item,
Multilevel screen is
displayed with the
planning log