0% found this document useful (0 votes)
109 views60 pages

B Dep Pipeline Appendix 2

This document provides a disclaimer and terms and conditions for use of a report. It states that the report is provided as-is without warranty and that the government of Alberta and project partners disclaim any representation or warranty regarding the accuracy or completeness of the report. It also outlines terms for accessing and using the report, including only using it for personal and non-commercial purposes, retaining any disclaimers, and indemnifying the government of Alberta for any breach of the terms.

Uploaded by

cajasc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views60 pages

B Dep Pipeline Appendix 2

This document provides a disclaimer and terms and conditions for use of a report. It states that the report is provided as-is without warranty and that the government of Alberta and project partners disclaim any representation or warranty regarding the accuracy or completeness of the report. It also outlines terms for accessing and using the report, including only using it for personal and non-commercial purposes, retaining any disclaimers, and indemnifying the government of Alberta for any breach of the terms.

Uploaded by

cajasc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 60

Disclaimer

This Report, including the data and information contained in this Report, is provided to you on an
“as is” and “as available” basis at the sole discretion of the Government of Alberta and subject to the
terms and conditions of use below (the “Terms and Conditions”). The Government of Alberta has
not verified this Report for accuracy and does not warrant the accuracy of, or make any other
warranties or representations regarding, this Report. Furthermore, updates to this Report may not
be made available. Your use of any of this Report is at your sole and absolute risk.

This Report is provided to the Government of Alberta, and the Government of Alberta has obtained
a license or other authorization for use of the Reports, from:

Shell Canada Energy, Chevron Canada Limited. and Marathon Oil Canada Corporation, for
the Quest Project

(collectively the “Project”)

Each member of the Project expressly disclaims any representation or warranty, express or
implied, as to the accuracy or completeness of the material and information contained herein, and
none of them shall have any liability, regardless of any negligence or fault, for any statements
contained in, or for any omissions from, this Report. Under no circumstances shall the Government
of Alberta or the Project be liable for any damages, claims, causes of action, losses, legal fees or
expenses, or any other cost whatsoever arising out of the use of this Report or any part thereof or
the use of any other data or information on this website.

Terms and Conditions of Use


Except as indicated in these Terms and Conditions, this Report and any part thereof shall not be
copied, reproduced, distributed, republished, downloaded, displayed, posted or transmitted in any
form or by any means, without the prior written consent of the Government of Alberta and the
Project.

The Government of Alberta’s intent in posting this Report is to make them available to the public
for personal and non-commercial (educational) use. You may not use this Report for any other
purpose. You may reproduce data and information in this Report subject to the following
conditions:

• any disclaimers that appear in this Report shall be retained in their original form and
applied to the data and information reproduced from this Report
• the data and information shall not be modified from its original form
• the Project shall be identified as the original source of the data and information, while this
website shall be identified as the reference source, and
• the reproduction shall not be represented as an official version of the materials reproduced,
nor as having been made in affiliation with or with the endorsement of the Government of
Alberta or the Project
By accessing and using this Report, you agree to indemnify and hold the Government of Alberta and
the Project, and their respective employees and agents, harmless from and against any and all
claims, demands, actions and costs (including legal costs on a solicitor-client basis) arising out of
any breach by you of these Terms and Conditions or otherwise arising out of your use or
reproduction of the data and information in this Report.

Your access to and use of this Report is subject exclusively to these Terms and Conditions and any
terms and conditions contained within the Report itself, all of which you shall comply with. You will
not use this Report for any purpose that is unlawful or prohibited by these Terms and Conditions.
You agree that any other use of this Report means you agree to be bound by these Terms and
Conditions. These Terms and Conditions are subject to modification, and you agree to review them
periodically for changes. If you do not accept these Terms and Conditions you agree to immediately
stop accessing this Report and destroy all copies in your possession or control.

These Terms and Conditions may change at any time, and your continued use and reproduction of
this Report following any changes shall be deemed to be your acceptance of such change.

If any of these Terms and Conditions should be determined to be invalid, illegal or unenforceable
for any reason by any court of competent jurisdiction then the applicable provision shall be severed
and the remaining provisions of these Terms and Conditions shall survive and remain in full force
and effect and continue to be binding and enforceable.

These Terms and Conditions shall: (i) be governed by and construed in accordance with the laws of
the province of Alberta and you hereby submit to the exclusive jurisdiction of the Alberta courts,
and (ii) ensure to the benefit of, and be binding upon, the Government of Alberta and your
respective successors and assigns.
Tri Ocean Document No. Revision No.
09223-0-DB-GQ-00001.00 0
Client Document No. Page
07-2-LA-7180-0005 1 of 48
Project
Quest CCS Project
Title
Design Basis Engineering Package

Appendix J

Alignment Sheets and Crossing Drawings


LEGEND:

T T

H
RU T RU T
E R R
NO E NO

P P

CARRIER PIPE SPECIFICATIONS

WARNING

BURIED
CO 2
PIPELINE

LOCATION DETAIL

NOTES:
DETAIL PLAN

PROFILE

NO. MATERIAL SUMMARY QTY.


Tri Ocean Document No. Revision No.
09223-0-DB-GQ-00001.00 0
Client Document No. Page
07-2-LA-7180-0005 1 of 6
Project
Quest CCS Project
Title
Design Basis Engineering Package

Appendix K

Line List
Quest CCS Project

Line List

Prepared for Shell Canada Energy

A 2011.08.16 Issue for Internal Review NES MZ NES/MZ


Date
Rev. Issue Originator Checker Approver Client
(yyyy.mm.dd)

Tri Ocean Document No. 09223-0-LI-PQ-00001.00

Client Document No.

Revision No. A

Page 1 of 5
Page 2 of 5

PERMIT TO PRACTICE STAMP PROCESS ENGINEER DATE


PROJECT No.: 09223 Dwg.No. Rev.

FILE No.: 09223-0-LI-PQ-00001.00 A


PIPING ENGINEER STAMP
P&ID Nos.: PROJECT TITLE AND LOCATION
09223-0-DG-BC-00001.01 - 10.01 09223-1-
DG-BC-00001.01 - 14.01
No. REVISION PROCESS ENG. / DATE PIPING ENG. / DATE

A ISSUED FOR INTERNAL REVIEW TRI OCEAN ENGINEERING LTD.


QUEST CCS Project
APEGGA PERMIT P2034

LINE LIST
DESIGN CODE CSA Z662/ASME B31.3
OPERATING
REFERENCE INSULATION DESIGN CONDITIONS LINE DESIGNATION

NSPECTION CODE
SYSTEM - LINE No.

HEAT TRACING
CONDITIONS
PIPE

PAINTING /

CSA CLASS
COATING

PIPELINE
SERVICE
DESIGN LEAK TEST

( L, V, G, 2 )
STRENGTH TEST (1)

LOCATION
BURIED
WALL

PIPING CLASS
SOUR
INSULATE
PHASE

FLANGES
THICKNESS

REV.
THK

LINE NO.
SYSTEM
(3)
FLUID NOTES MAX. MAX. INST. MAX MIN MAX MIN or

NPS
P&ID DWG. No. ORIGIN TERMINATION PRESS TEMP MIN.
PRESS TEMP TEMP TEST TEST TEST TEST SCH
TEMP MEDIUM
(2) PRESS PRESS PRESS PRESS

IN
S

P
Y/N Y/N Y/N Y/N Y/N kPa g ºC kPa g ºC ºC ºC kPa g kPa g kPa g kPa g mm

GC249001 09223-0-DG-BC-00001.01 8-GC-249XXX-PJL( C) 12-GC-249002-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 9.5 8 GC 249001 CO2Z A

GC249002 09223-0-DG-BC-00001.01 SP-24901 PIG LAUNCHER 12-GC-249003-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249002 CO2Z A

VA249005 09223-0-DG-BC-00001.01 SP-24901 PIG LAUNCHER ATM CO2 G - - - - N N - 300 49 14790 49 -20 24715 Water 5.54 2 VA 249005 C6 A

GC249003 09223-0-DG-BC-00001.01 12-GC-249002-CO2Z 12-GC-249101-CO2Z CO2 L N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249003 CO2Z A

GC249004 09223-0-DG-BC-00001.01 8-GC-249001-CO2Z SP-24901 PIG LAUNCHER CO2 L - - - - N N - 13790 49 14790 60 -20 24715 Water 7.9 6 GC 249004 XXXX A

GC249101 09223-0-DG-BC-00002.01 12-GC-249003-CO2Z 12-GC-249102-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249101 CO2Z A

GC249102 09223-0-DG-BC-00002.01 12-GC-249101-CO2Z 12-GC-249103-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249102 CO2Z A

GC249103 09223-0-DG-BC-00002.01 12-GC-249102-CO2Z 12-GC-249201-CO2Z CO2 L - - - - - N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249103 CO2Z A

GC249105 09223-0-DG-BC-00002.01 12-GC-249102-CO2Z 4-GC-249104-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249105 CO2Z A

VA249104 09223-0-DG-BC-00002.01 4-GC-249105-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249104 C6 A

VA249107 09223-0-DG-BC-00002.01 4-GC-249104-C6 4-GC-249108-C6 CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249107 C6 A

GC249106 09223-0-DG-BC-00002.01 12-GC-249101-CO2Z 4-VA-249108-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249106 CO2Z A

VA249108 09223-0-DG-BC-00002.01 4-VA-249116-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249108 C6 A

GC249201 09223-0-DG-BC-00003.01 12-GC-249103-CO2Z 12-GC-249202-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249201 CO2Z A

GC249202 09223-0-DG-BC-00003.01 12-GC-249201-CO2Z 12-GC-249203-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249202 CO2Z A

GC249203 09223-0-DG-BC-00003.01 12-GC-249202-CO2Z 12-GC-249301-CO2Z CO2 L - - - - - N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249203 CO2Z A

GC249205 09223-0-DG-BC-00003.01 12-GC-249202-CO2Z 4-GC-249204-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249205 CO2Z A

VA249204 09223-0-DG-BC-00003.01 4-GC-249205-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249204 C6 A

VA249207 09223-0-DG-BC-00003.01 4-VA-249204-C6 4-GC-249208-CO2Z CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249207 C6 A

GC249206 09223-0-DG-BC-00003.01 12-GC-249201-CO2Z 4-VA-249208-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249206 CO2Z A

VA249208 09223-0-DG-BC-00003.01 4-GC-249206-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249208 C6 A

GC249301 09223-0-DG-BC-00004.01 12-GC-249203-CO2Z 12-GC-249302-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249301 CO2Z A

GC249302 09223-0-DG-BC-00004.01 12-GC-249301-CO2Z 12-GC-249303-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249302 CO2Z A

GC249303 09223-0-DG-BC-00004.01 12-GC-249302-CO2Z PIG RECEIVER SP-24902 CO2 L - - - - - N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249303 CO2Z A

GC249305 09223-0-DG-BC-00004.01 12-GC-249302-CO2Z 4-VA-249304-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249305 CO2Z A

VA249304 09223-0-DG-BC-00004.01 4-GC-249305-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249304 C6 A

FOR NOTES REFER TO LAST PAGE


Page 3 of 5

OPERATING
REFERENCE INSULATION DESIGN CONDITIONS LINE DESIGNATION

INSPECTION CODE
SYSTEM - LINE No.

HEAT TRACING
CONDITIONS
PIPE

PAINTING /

CSA CLASS
COATING

PIPELINE
SERVICE
DESIGN LEAK TEST

( L, V, G, 2 )
STRENGTH TEST (1)

LOCATION
BURIED
WALL

PIPING CLASS
SOUR
INSULATE
PHASE

FLANGES
THICKNESS

REV.
THK

LINE NO.
SYSTEM
(3)
FLUID NOTES MAX. MAX. INST. MAX MIN MAX MIN or

NPS
MIN.
P&ID DWG. No. ORIGIN TERMINATION PRESS TEMP PRESS TEMP TEMP TEST TEST TEST TEST
TEMP MEDIUM SCH
(2) PRESS PRESS PRESS PRESS

Y/N Y/N Y/N Y/N Y/N kPa g ºC kPa g ºC ºC ºC kPa g kPa g kPa g kPa g mm

VA249307 09223-0-DG-BC-00004.01 4-VA-249304-C6 4-GC-249308-C6 CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249307 C6 A

GC249306 09223-0-DG-BC-00004.01 4-GC-249307-C6 12-GC-249301-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249306 CO2Z A

VA249308 09223-0-DG-BC-00004.01 4-GC-249306-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249308 C6 A

GC249401 09223-0-DG-BC-00005.01 12-GC-249303-CO2Z 12-GC-249403-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249401 CO2Z A

GC249403 09223-0-DG-BC-00005.01 PIG LANCHER SP-24903 12-GC-249404-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249403 CO2Z A

GC249400 09223-0-DG-BC-00005.01 PIG RECEIVER SP-24902 12-GC-249401-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 249400 CO2Z A

GC249404 09223-0-DG-BC-00005.01 12-GC-249403-CO2Z 12-GC-249501-CO2Z CO2 L N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249404 CO2Z A

VA249405 09223-0-DG-BC-00005.01 PIG RECEIVER SP-24903 ATM CO2 G N N - 300 28 14790 38 -20 24715 Water 5.54 2 VA 249405 C6 A

VA249406 09223-0-DG-BC-00005.01 PIG LAUNCHER SP-24902 ATM CO2 G N N - 300 28 14790 38 -20 24715 Water 5.54 2 VA 249406 C6 A

GC249402 09223-0-DG-BC-00005.01 12-GC-249401-CO2Z PIG LANCHER SP-24903 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 249402 CO2Z A

GC249501 09223-0-DG-BC-00006.01 12-GC-249404-CO2Z 12-GC-249502-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249501 CO2Z A

GC249502 09223-0-DG-BC-00006.01 12-GC-249501-CO2Z 12-GC-249503-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249502 CO2Z A

GC249503 09223-0-DG-BC-00006.01 12-GC-249502-CO2Z 12-GC-249601-CO2Z CO2 L - - - - - N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249503 CO2Z A

GC249505 09223-0-DG-BC-00006.01 12-GC-249502-CO2Z 4-VA-249504-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249505 CO2Z A

VA249504 09223-0-DG-BC-00006.01 4-GC-249505-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249504 C6 A

VA249507 09223-0-DG-BC-00006.01 4-VA-249504-C6 4-VA-249508-C6 CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249507 C6 A

GC249506 09223-0-DG-BC-00006.01 12-GC-249501-CO2Z 4-VA-249508-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249506 CO2Z A

VA249508 09223-0-DG-BC-00006.01 4-VA-249506-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249508 C6 A

GC249601 09223-0-DG-BC-00007.01 12-GC-249503-CO2Z 12-GC-249602-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249601 CO2Z A

GC249602 09223-0-DG-BC-00007.01 12-GC-249601-CO2Z 12-GC-249603-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249602 CO2Z A

GC249603 09223-0-DG-BC-00007.01 12-GC-249602-CO2Z 12-GC-249701-CO2Z CO2 L - - - - - N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249603 CO2Z A

GC249605 09223-0-DG-BC-00007.01 12-GC-249602-CO2Z 4-VA-249604-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249605 CO2Z A

VA249604 09223-0-DG-BC-00007.01 4-GC-249605-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249604 C6 A

VA249607 09223-0-DG-BC-00007.01 4-GC-249606-CO2Z 4-VA-249608-C6 CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249607 C6 A

GC249606 09223-0-DG-BC-00007.01 12-GC-249601-CO2Z 4-VA-249608-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249606 CO2Z A

VA249608 09223 0 DG BC 00007.01


09223-0-DG-BC-00007 01 4 GC 249606 CO2Z
4-GC-249606-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 20
-20 24715 Water 8.56
8 56 4 VA 249608 C6 A

GC249701 09223-0-DG-BC-00008.01 12-GC-249603-CO2Z 12-GC-249702-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249701 CO2Z A

GC249702 09223-0-DG-BC-00008.01 12-GC-249701-CO2Z 12-GC-249703-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249702 CO2Z A

GC249703 09223-0-DG-BC-00008.01 12-GC-249702-CO2Z 12-GC-249801-CO2Z CO2 L - - - - - N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249703 CO2Z A

GC249705 09223-0-DG-BC-00008.01 12-GC-249702-CO2Z 4-VA-249704-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249705 CO2Z A

VA249704 09223-0-DG-BC-00008.01 4-GC-249705-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249704 C6 A

VA249707 09223-0-DG-BC-00008.01 4-VA-249704-C6 4-VA-249708-C6 CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249707 C6 A

FOR NOTES REFER TO LAST PAGE


Page 4 of 5

OPERATING
REFERENCE INSULATION DESIGN CONDITIONS LINE DESIGNATION

INSPECTION CODE
SYSTEM - LINE No.

HEAT TRACING
CONDITIONS
PIPE

PAINTING /

CSA CLASS
COATING

PIPELINE
SERVICE
DESIGN LEAK TEST

( L, V, G, 2 )
STRENGTH TEST (1)

LOCATION
BURIED
WALL

PIPING CLASS
SOUR
INSULATE
PHASE

FLANGES
THICKNESS

REV.
THK

LINE NO.
SYSTEM
(3)
FLUID NOTES MAX. MAX. INST. MAX MIN MAX MIN or

NPS
MIN.
P&ID DWG. No. ORIGIN TERMINATION PRESS TEMP PRESS TEMP TEMP TEST TEST TEST TEST
TEMP MEDIUM SCH
(2) PRESS PRESS PRESS PRESS

Y/N Y/N Y/N Y/N Y/N kPa g ºC kPa g ºC ºC ºC kPa g kPa g kPa g kPa g mm

GC249706 09223-0-DG-BC-00008.01 12-GC-249701-CO2Z 4-VA-249708-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249706 CO2Z A

VA249708 09223-0-DG-BC-00008.01 4-GC-249706-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249708 C6 A

GC249801 09223-0-DG-BC-00009.01 12-GC-249703-CO2Z 12-GC-249802-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249801 CO2Z A

GC249802 09223-0-DG-BC-00009.01 12-GC-249801-CO2Z 12-GC-249803-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249802 CO2Z A

GC249803 09223-0-DG-BC-00009.01 12-GC-249802-CO2Z 12-GC-249901-CO2Z CO2 L - - - - - N Y 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249803 CO2Z A

GC249805 09223-0-DG-BC-00009.01 12-GC-249802-CO2Z 4-VA-249804-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249805 CO2Z A

VA249804 09223-0-DG-BC-00009.01 4-GC-249805-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249804 C6 A

VA249807 09223-0-DG-BC-00009.01 4-VA-249804-C6 4-VA-249808-C6 CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249807 C6 A

GC249806 09223-0-DG-BC-00009.01 12-GC-249801-CO2Z 4-VA-249808-C6 CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 249806 CO2Z A

VA249808 09223-0-DG-BC-00009.01 4-GC-249806-CO2Z ATM CO2 G/L N N - 13790 38 14790 38 -20 24715 Water 8.56 4 VA 249808 C6 A

GC249901 09223-0-DG-BC-00010.01 12-GC-249803--CO2Z PIG RECEIVER SP-24904 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 12.7 12 GC 249901 CO2Z A

GC702903 09223-0-DG-BC-00010.01 12-GC-249901-CO2 4-GC-702350-CO2Z CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702903 CO2Z A

GC249902 09223-0-DG-BC-00010.01 PIG RECEIVER SP-24904 4-GC-702903-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 4.8 2 GC 249902 CO2Z A

VA249904 09223-0-DG-BC-00010.01 PIG RECEIVER SP-24904 ATM CO2 G N N - 300 28 14790 38 -20 24715 Water 5.54 2 VA 249904 C6 A

-20 A

GC702451 09223-1-DG-BC-00001.01 4-GC-702433-CO2Z S-70201 CO2 PARTICLE FILTER CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702451 CO2Z A

GC702452 09223-1-DG-BC-00001.01 S-70201 CO2 PARTICLE FILTER 4-GC-702454-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702452 CO2Z A

GC702453 09223-1-DG-BC-00001.01 4-GC-702452-CO2Z 4-GC-702454-CO2Z CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 GC 702453 CO2Z A

GC702454 09223-1-DG-BC-00001.01 4-GC-702452-CO2Z 4-GC-702455-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702454 CO2Z A

VA702464 09223-1-DG-BC-00001.01 S-70201 CO2 PARTICLE FILTER 2-VA-702462-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702464 C6 A

VA702460 09223-1-DG-BC-00001.01 S-70201 CO2 PARTICLE FILTER 2-VA-702461-C6 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 VA 702460 CO2Z A

VA702461 09223-1-DG-BC-00001.01 1-VA-702460-CO2Z VENT TO SAFE LOCATION CO2 G N N - 300 28 14790 38 -20 24715 Water 5.54 2 VA 702461 C6 A

GC702455 09223-1-DG-BC-00001.01 4-GC-702454-CO2Z WELLSITE # 1 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702455 CO2Z A

VA702462 09223-1-DG-BC-00001.01 4-GC-702454-CO2Z 2-VA-702463-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702462 C6 A

VA702463 09223-1-DG-BC-00001.01 2-VA-702462-C6 2-VA-702461-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702463 C6 A

GC702551 09223-1-DG-BC-00003.01 4-GC-702533-CO2Z S-70202 CO2 PARTICLE FILTER CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702551 CO2Z A

GC702552 09223-1-DG-BC-00003.01 S-70202 CO2 PARTICLE FILTER 4-GC-702554-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702552 CO2Z A

GC702553 09223-1-DG-BC-00003.01 4-GC-702552-CO2Z 4-GC-702554-CO2Z CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 GC 702553 CO2Z A

GC702554 09223-1-DG-BC-00003.01 4-GC-702552-CO2Z 4-GC-702555-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702554 CO2Z A

VA702564 09223-1-DG-BC-00003.01 S-70202 CO2 PARTICLE FILTER 2-VA-702562-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702564 C6 A

FOR NOTES REFER TO LAST PAGE


Page 5 of 5

OPERATING
REFERENCE INSULATION DESIGN CONDITIONS LINE DESIGNATION

INSPECTION CODE
SYSTEM - LINE No.

HEAT TRACING
CONDITIONS
PIPE

PAINTING /

CSA CLASS
COATING

PIPELINE
SERVICE
DESIGN LEAK TEST

( L, V, G, 2 )
STRENGTH TEST (1)

LOCATION
BURIED
WALL

PIPING CLASS
SOUR
INSULATE
PHASE

FLANGES
THICKNESS

REV.
THK

LINE NO.
SYSTEM
(3)
FLUID NOTES MAX. MAX. INST. MAX MIN MAX MIN or

NPS
MIN.
P&ID DWG. No. ORIGIN TERMINATION PRESS TEMP PRESS TEMP TEMP TEST TEST TEST TEST
TEMP MEDIUM SCH
(2) PRESS PRESS PRESS PRESS

Y/N Y/N Y/N Y/N Y/N kPa g ºC kPa g ºC ºC ºC kPa g kPa g kPa g kPa g mm

VA702560 09223-1-DG-BC-00003.01 S-70202 CO2 PARTICLE FILTER 2-VA-702561-C6 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 VA 702560 CO2Z A

VA702561 09223-1-DG-BC-00003.01 1-VA-702560-CO2Z VENT TO SAFE LOCATION CO2 G N N - 300 28 14790 38 -20 24715 Water 5.54 2 VA 702561 C6 A

GC702555 09223-1-DG-BC-00003.01 4-GC-702554-CO2Z WELLSITE # 2 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702555 CO2Z A

VA702562 09223-1-DG-BC-00003.01 4-GC-702554-CO2Z 2-VA-702563-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702562 C6 A

VA702563 09223-1-DG-BC-00003.01 2-VA-702562-C6 2-VA-702561-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702563 C6 A

GC702150 09223-1-DG-BC-00005.01 4-GC-702133-CO2Z S-70203 CO2 PARTICLE FILTER CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702150 CO2Z A

GC702151 09223-1-DG-BC-00005.01 S-70203 CO2 PARTICLE FILTER 4-GC-702153-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702151 CO2Z A

GC702152 09223-1-DG-BC-00005.01 4-GC-702151-CO2Z 4-GC-702153-CO2Z CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 GC 702152 CO2Z A

GC702153 09223-1-DG-BC-00005.01 4-GC-702151-CO2Z 4-GC-702155-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702153 CO2Z A

VA702164 09223-1-DG-BC-00005.01 S-70203 CO2 PARTICLE FILTER 2-VA-702162-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702164 C6 A

VA702160 09223-1-DG-BC-00005.01 S-70203 CO2 PARTICLE FILTER 2-VA-702161-C6 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 VA 702160 CO2Z A

VA702161 09223-1-DG-BC-00005.01 1-VA-702160-CO2Z VENT TO SAFE LOCATION CO2 G N N - 300 28 14790 38 -20 24715 Water 5.54 2 VA 702161 C6 A

GC702155 09223-1-DG-BC-00005.01 4-GC-702153-CO2Z WELLSITE # 3 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702155 CO2Z A

VA702162 09223-1-DG-BC-00005.01 4-GC-702153-CO2Z 4-GC-702053-CO2Z CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702162 C6 A

VA702163 09223-1-DG-BC-00005.01 2-VA-702162-C6 2-VA-702161-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702163 C6 A

GC702251 09223-1-DG-BC-00007.01 4-GC-702233-CO2Z S-70204 CO2 PARTICLE FILTER CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702251 CO2Z A

GC702252 09223-1-DG-BC-00007.01 S-70204 CO2 PARTICLE FILTER 4-GC-702254-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702252 CO2Z A

GC702253 09223-1-DG-BC-00007.01 4-GC-702252-CO2Z 4-GC-702254-CO2Z CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 GC 702253 CO2Z A

GC702254 09223-1-DG-BC-00007.01 4-GC-702252-CO2Z 4-GC-702255-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702254 CO2Z A

VA702264 09223-1-DG-BC-00007.01 S-70204 CO2 PARTICLE FILTER 2-VA-702262-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702264 C6 A

VA702260 09223-1-DG-BC-00007.01 S-70204 CO2 PARTICLE FILTER 2-VA-702261-C6 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 VA 702260 CO2Z A

VA702261 09223-1-DG-BC-00007.01 1-VA-702260-CO2Z VENT TO SAFE LOCATION CO2 G N N - 300 28 14790 38 -20 24715 Water 5.54 2 VA 702261 C6 A

GC702255 09223-1-DG-BC-00007.01 4-GC-702254-CO2Z WELLSITE # 4 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702255 CO2Z A

VA702262 09223-1-DG-BC-00007.01 4-GC-702254-CO2Z 2-VA-702263-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702262 C6 A

VA702263 09223-1-DG-BC-00007.01 2-VA-702262-C6 2-VA-702261-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702263 C6 A

GC702350 09223-1-DG-BC-00009.01 4-GC-702903-CO2Z S-70205 CO2 PARTICLE FILTER CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702350 CO2Z A

GC702351 09223-1-DG-BC-00009.01 S-70205 CO2 PARTICLE FILTER 4-GC-702353-CO2Z CO2 L - - - - - N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702351 CO2Z A

GC702352 09223-1-DG-BC-00009.01 4-GC-702351-CO2Z 4-GC-702353-CO2Z CO2 L - - - - N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 GC 702352 CO2Z A

GC702353 09223-1-DG-BC-00009.01 4-GC-702351-CO2Z 4-GC-702354-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702353 CO2Z A

FOR NOTES REFER TO LAST PAGE


Page 6 of 5

OPERATING
REFERENCE INSULATION DESIGN CONDITIONS LINE DESIGNATION

INSPECTION CODE
SYSTEM - LINE No.

HEAT TRACING
CONDITIONS
PIPE

PAINTING /

CSA CLASS
COATING

PIPELINE
SERVICE
DESIGN LEAK TEST

( L, V, G, 2 )
STRENGTH TEST (1)

LOCATION
BURIED
WALL

PIPING CLASS
SOUR
INSULATE
PHASE

FLANGES
THICKNESS

REV.
THK

LINE NO.
SYSTEM
(3)
FLUID NOTES MAX. MAX. INST. MAX MIN MAX MIN or

NPS
MIN.
P&ID DWG. No. ORIGIN TERMINATION PRESS TEMP PRESS TEMP TEMP TEST TEST TEST TEST
TEMP MEDIUM SCH
(2) PRESS PRESS PRESS PRESS

Y/N Y/N Y/N Y/N Y/N kPa g ºC kPa g ºC ºC ºC kPa g kPa g kPa g kPa g mm

VA702364 09223-1-DG-BC-00009.01 S-70205 CO2 PARTICLE FILTER 2-VA-702362-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702364 C6 A

VA702360 09223-1-DG-BC-00009.01 S-70205 CO2 PARTICLE FILTER 2-VA-702361-C6 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 4.5 1 VA 702360 CO2Z A

VA702361 09223-1-DG-BC-00009.01 1-VA-702360-CO2Z VENT TO SAFE LOCATION CO2 G N N - 300 28 14790 38 -20 24715 Water 5.54 2 VA 702361 C6 A

GC702354 09223-1-DG-BC-00009.01 4-GC-702353-CO2Z WELLSITE # 5 CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702354 CO2Z A

VA702362 09223-1-DG-BC-00009.01 4-GC-702353-CO2Z 4-GC-702353-CO2Z CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702362 C6 A

VA702363 09223-1-DG-BC-00009.01 2-VA-702362-C6 2-VA-702361-C6 CO2 L N N - 13790 38 14790 38 -20 24715 Water 5.54 2 VA 702363 C6 A

GC249431 09223-1-DG-BC-00011.01 12-GC-249603-CO2Z 6-GC-701432-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 249431 CO2Z A

GC701432 09223-1-DG-BC-00011.01 6-GC-249431-CO2Z 4-GC-702433-CO2Z CO2 L N Y 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 701432 CO2Z A

GC702433 09223-1-DG-BC-00011.01 6-GC-701432-CO2Z 4-GC-702451-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702433 CO2Z A

GC249531 09223-1-DG-BC-00012.01 12-GC-249703-CO2Z 6-GC-701532-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 249531 CO2Z A

GC701532 09223-1-DG-BC-00012.01 6-GC-249531-CO2Z 4-GC-702533-CO2Z CO2 L N Y 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 701532 CO2Z A

GC702533 09223-1-DG-BC-00012.01 6-GC-701532-CO2Z 4-GC-702554-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702533 CO2Z A

GC249131 09223-1-DG-BC-00013.01 12-GC-249703-CO2Z 6-GC-701132-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 249131 CO2Z A

GC701132 09223-1-DG-BC-00013.01 6-GC-249131-CO2Z 4-GC-702133-CO2Z CO2 L N Y 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 701132 CO2Z A

GC702133 09223-1-DG-BC-00013.01 6-GC-701132-CO2Z 4-GC-702150-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702133 CO2Z A

GC249231 09223-1-DG-BC-00014.01 12-GC-249803-CO2Z 6-GC-701232-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 249231 CO2Z A

GC701232 09223-1-DG-BC-00014.01 6-GC-249231-CO2Z 4-GC-702233-CO2Z CO2 L N Y 2 13790 49 14790 60 -20 24715 Water 7.9 6 GC 701232 CO2Z A

GC702233 09223-1-DG-BC-00014.01 6-GC-701232-CO2Z 4-GC-702251-CO2Z CO2 L N N 2 13790 49 14790 60 -20 24715 Water 5.6 4 GC 702233 CO2Z A

1- STRESS LIMITATIONS BASED ON YIELD STRENGTH APPLY AS REQ'D. BY CODE. ABBREVIATIONS: H- HYDROTEST, P- PNEUMATIC TEST, S- SERVICE TEST, A- ALTERNATIVE.

2- FOR BURIED PIPELINES ONLY. PIPELINE TEMPERATURE AT TIME OF RESTRAINT SHALL NOT BE LESS THAN DESIGN INSTALLATION TEMPERATURE.

3- HIGHLIGHTED VALUES TO BE CONFIRMED

FOR NOTES REFER TO LAST PAGE


Tri Ocean Document No. Revision No.
09223-0-DB-GQ-00001.00 0
Client Document No. Page
07-2-LA-7180-0005 1 of 3
Project
Quest CCS Project
Title
Design Basis Engineering Package

Appendix L

Regulations, Codes and Standards


SUBJECT INDEX
Technical Standards List
Quest CCS Project - Pipeline and Wellsites
Std. Rev. Rev. Responsible App'd Needed
Doc. No. Document Name
Type # Date Specialist Y/N For Quest

ELECTRICAL
DEP
Electrical Engineering Design for North American Mark Throckmorton
33.64.20.10-Gen 0 Feb-11 Y YES
Application (Jim Richard)

STD July 07
Mark Throckmorton
15-1.20 Electric Heat Tracing - Design 2 amended Y YES
(Jim Richard)
March 08
STD
Mark Throckmorton
15-3.01 Electrical - Installation 2 Jan. 07 Y YES
(Jim Richard)

GENERAL, DRAFTING, and SAFEGUARDING


DEP
The use of SI quantities and units (endorsement of
00.00.20.10-Gen Dec-07 Ken Souriseau Y YES
ISO 31, ISO 1000 and ISO 80000)

DEP 01.00.01.30-Gen Definition of Temerature, Pressure, and toxicity Jan-10 Ken Souriseau
Y YES
Levels
DEP 01.00.02.12-Gen Preparation of Safeguarding Memoranda and Eric Wakley
process Safeguarding Flow Schemes Jan 2010 Y YES

DEP 80.45.10.12-Gen Emergency Depressuring and Sectionalizing Eric Wakley


Jan-10 Y YES
DEP 80.00.10.11-SCAN Layout of Onshore Facilities Sep-05 Eric Wakley Y YES
DEP 30.00.60.18-Gen Human Factors Engineering - Design and Eric Wakley
Jan-10 Y YES
Procurement of Skid-packaged Units
DEP 80.80.00.15-Gen Selection of Safety Critical Elements Jan-07 Eric Wakley Y YES
DEP 82.00.10.10-Gen Project Quality Assurance Dec-95 Dave Rider Y YES
INSPECTION, TESTING, & MAINTENANCE

STD 15-3.02 2 Jun. 00


Inspection and Testing Requirements for Electrical Mark Throckmorton
Y YES
Installation (Jim Richard)

EG 108-08.01 Plant Equipment - Criticality Based Design 1 Mar-05 Eric Wakley Y YES
EG 118-2.11 Inspection Guidelines for Shop-Applied, Non-Metallic 1 Aug-98 Simon Yuen
Y YES
Coatings and Linings (Maziar Shirazian)
STD 16-3.02 Instrumentation Field Checkout & Testing orig. Oct. 04 Jim McKibbon
Y YES
(Bob Sherven)
STD 18-2.01 Testing and Non-Destructive Examination Methods 1 Mar 06 Simon Yuen
and Procedures for Pressure Equipment and Piping (Maziar Shirazian) Y YES

STD 18-2.11 Hydrostatic Pressure Testing - Plant Piping 2 Oct-03 Simon Yuen
Y YES
(Maziar Shirazian)
STD 18-2.12 Pressure Testing of Pipelines and Pipeline 1 Mar-00 Reg MacDonald
Y YES
Equipment (Maziar Shirazian)
DEP 31.10.00.10-Gen Material traceability and positive material Jan-10 Simon Yuen
Y YES
identification (PMI) (Maziar Shirazian)
DEP 61.10.08.11-Gen Field inspection prior to commissioning of mechanical Mar-07 (Dave Rider)
Y YES
equipment
DEP 90.00.00.01-SCAN Use of Ultrasonic Testing in Lieu of Radiographic Oct-08 Simon Yuen
Testing for Examination of Piping Girth Welds (Maziar Shirazian) Y YES

INSTRUMENTATION & CONTROL, & COMMUNICATIONS


STD 16-1.11 Instrument - Design orig. Oct. 04 Jim McKibbon
Y YES
(Bob Sherven)
STD 16-1.16 Instrument Winterization - Design orig. Oct. 04 Jim McKibbon
Y YES
(Bob Sherven)
STD 16-1.18 Programmable Controllers - Program Design orig. Aug. 06 Jim McKibbon
Y YES
(Bob Sherven)
DEP 30.00.60.16-SCAN Human Factors Engineering - Attention Hierarchy orig. Jun-06 Jim McKibbon
Y YES
Coding for Graphical Displays (Bob Sherven)
STD 16-3.11 Instrumentation - Installation 2 Oct. 04 Jim McKibbon
Y YES
(Bob Sherven)
DEP 32.80.10.14-Gen Alarm Management Jim McKibbon
Jan 2010 (Bob Sherven) Y YES

DEP 32.01.23.17-Gen Process Control domain - Security requirements Jim McKibbon


Mar 2010 Y YES
for vendors (Bob Sherven)
Communications
STD 16-1.35 Communication Standards and Practices - Design 1 Jun-07 Jim McKibbon
Y YES
(Bob Sherven)
DEP 32.71.00.14-Gen Telecommunications towers and guyed masts Dec-08 Jim McKibbon
Y YES
(Bob Sherven)
Rotating Equipment
DEP 31.29.12.30-SCAN Reciprocating positive displacement pumps and Oct. 05 Joe Spiller
metering pumps (amendments/supplements to API (Chris Gilmour)
674 and API 675) Y YES

Shell Quest Technical Standards Short List Aug 2011 Page 1 of 2 8/16/2011
INSULATION, COATINGS, and
CATHODIC PROTECTION
STD 5-1.02 Cold Service Insulation - Design orig. Mar. 05 Paul Harte
Y YES
(Ken MacVicar)
STD 5-2.02 Cold Service Insulation -Manufacturing orig. Mar. 05 Paul Harte
Y YES
(Ken MacVicar)
STD 5-3.02 Cold Service Insulation - Installation orig. Mar. 05 Paul Harte
Y YES
(Ken MacVicar)
STD 19-1.11 External Coatings for Underground Pipe - Design 1 Apr. 06 (Maziar Shirazian)
Y YES

STD 19-2.11 External Shop Coating of Pipe for Underground 2 Aug-09 (Maziar Shirazian)
Y YES
Service - Manufacturing
STD 19-3.11 External Field Coating for Underground Pipe - 2 Aug-09 (Maziar Shirazian)
Y YES
Installation
DEP 30.10.73.10-Gen Cathodic protection Nov 03 (Maziar Shirazian) Y YES
DEP 30.10.73.31-Gen Design of cathodic protection systems for onshore Dec 92 (Maziar Shirazian)
Y YES
buried pipelines
DEP 30.10.73.33-Gen Installation and Commissioning of cathodic protection Jan 00 (Maziar Shirazian)
Y YES
systems
MECHANICAL - HEAT TRANSFER
MATERIALS & WELDING
DEP 30.10.02.31-Gen Metallic materials - prevention of brittle fracture Jan-10 (Maziar Shirazian)
Y YES
DEP 31.40.20.35-Gen Linepipe for non-critical service Dec-99 (Maziar Shirazian)
Y YES
(amendments/supplements to ISO 3183-1)
DEP 30.10.02.15-Gen Materials for use in H2S Environments 0 Jan-10 Magdy Girgis
(ammendments supplements to ISO 15156 - 2009) (Maziar Shirazian) Y YES

STD 3-2.13 Linepipe for Sour Service 1 Apr-06 Reg MacDonald


Y YES
(Maziar Shirazian)
DEP 39.01.10.11-Gen Selection of materials for life cycle performance Jan 2010 (Maziar Shirazian)
(EP) - Materials selection process Y YES

DEP 39.01.10.12-Gen Selection of materials for life cycle performance Jan 2010 (Maziar Shirazian)
Y YES
(EP) - Upstream equipment
STD 57-2.01 Welding of Pressure Equipment and Piping (Plant) 0 May 2004 Simon Yuen
Y YES
(Maziar Shirazian)
STD 57-2.31 Welding of Sweet Gas and Oil Pipeline Systems 2 Feb 2005 Reg MacDonald
Y YES
(Maziar Shirazian)
STD 57-2.32 Welding of Sour Gas and Sour Oil Pipeline 2 Feb 2005 Reg MacDonald
Y YES
Systems (Maziar Shirazian)
EG 118-57.11 ASME/ANSI Registered Welding Procedures 1 Mar-08 (Maziar Shirazian) Y YES
MECHANICAL - VESSELS - TANKS
STD 8-1.04 Pressure Equipment - Design orig. Jun. 05 Simon Yuen
Y YES
(Maziar Shirazian)
DEP 31.22.20.31-SCAN Pressure Vessels (Amendments/supplements to Oct-04 Simon Yuen
Y YES
ASME VIII ) (Maziar Shirazian)

PIPE, VALVES, FITTINGS, PIPELINES


STD 84-1.01 Instrument and Utility Air Systems - Design orig Nov 88 Ken Sourisseau
Y YES
(Maziar Shirazian)
DEP 31.37.00.11-Gen Instrument air supply Jan 05 Simon Yuen
Y YES
(Maziar Shirazian)
DEP 31.38.01.11-Gen Piping Design - General Requirements Feb-11 Simon Yuen
Y YES
(Maziar Shirazian)
DEP 31.38.01.31-SCAN Shop and field fabrication of piping Dec-05 Simon Yuen
Y YES
(Maziar Shirazian)
STD 3-3.11 Pipeline Installation Metallic Jul-89 (Maziar Shirazian) Y YES
STD 3-1.12 Pipe Valves and Fittings - Piping Classes 0 Apr-90 Reg MacDonald
Y YES
Upstream Field Facilities (Maziar Shirazian)
STD 3-1.02 Pipe Valves and Fittings - Piping Classes 1 Nov-91 Simon Yuen
Y YES
Upstream Plant Facilities (Maziar Shirazian)
STD 118-3.02 Requirements for Maintenance of Pipeline 0 Mar-01 Reg MacDonald
Y YES
Systems Resources Operations (Maziar Shirazian)
Y YES
CIVIL
STD 13-1.01 Standard for Structural Engineering Criteria orig. Jan-07 (Jim Wright) Y YES
STD 13-1.02 Standard for Design of Steel Structures orig. Jan-07 (Jim Wright) Y YES
STD 13-2.01 Standard for Fabrication of Steel Structures orig. Jan-07 (Jim Wright) Y YES
STD 17-2.01 Pre-Engineered Buildings orig. Nov. 04 (Jim Wright) Y YES
STD 14-2.12 Driven Steel Piles - Manufacture and Installation orig. Feb-07 (Jim Wright)
Y YES

OP PS 36 50001 Supply Installation of Driven Steel Piles H Piles 3 Jan-08 (Jim Wright)
Y YES
Screw Piles
OP PS 36 20 02 Supply Fabrication of Skid Mounted Building Skids 0 Jan-08 (Jim Wright)
Y YES

Shell Quest Technical Standards Short List Aug 2011 Page 2 of 2 8/16/2011