Reference Drawings: Saudi Arabian Oil Company

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES:

SAUDIARAMCO.
1.ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.

2. CATHODIC PROTECTION INSTALLATION SHALL BE IN


ACCORDANCE WITH SAES-X-400.

3. FOR CATHODIC PROTECTION JUNCTION BOX


INSTALLATION SEE SAUDI ARAMCO STANDARD
DRAWING AB-036540.

OF
4. FOR CATHODIC PROTECTION CABLE MARKER AND ANODE

CONSENT
MARKER PLATE INSTALLATION SEE SAUDI ARAMCO
STANDARD DRAWING AB-036351.

5. FOR INSTALLATION OF CATHODIC PROTECTION


POSITIVE AND NEGATIVE CABLE SEE SAUDI ARAMCO

TTEN
STANDARD DRAWING AA-036675.

WRI
6. ALL BURIED GROUND CABLES ARE INSULATED
(JACKETED).

THE
7. TEST STATIONS AND ANODES SHALL BE OFFSET
A FROM ROAD CENTERLINES IN ACCORDANCE WITH

THOUT
SAUDI ARAMCO STANDARDS.

068
8. INSTALLATION OF CATHODIC PROTECTION TEST

ANCHOR
19+262.

WI
INSULATING GASKET STATIONS AND JUNCTION BOXES SHALL BE IN
ACCORDANCE WITH STANDARD DRAWING AA-036352,

NG
DRAWI
AB-036907 AND AB-036540.

DRAG
ACCESS PLATFORM

STA
M
A 9. INSTALLATION OF GALVANIC ANODES FOR ROAD AND
TOP EL 1.150 T
C
2500 H CAMEL PIPELINE CROSSINGS SHOULD BE IN
L
I

S
1200
N

THI
ACCORDANCE WITH STANDARD DRAWING AA-036352.
(PROVISION FOR S E
E
E ST
TEMPORARY SCRAPER) PROPOSED 20" CS DISCH. P/L ( WEST FLANK)
10. INSTALLATION OF GALVANIC ANODES AT ISOLATION
D A
X

VS
W

FROM
G 20 CASING ROAD CROSSING SHOULD BE IN ACCORDANCE
.P +
B 05 WITH STANDARD DRAWING AA-036352.
20" BA VA STA 21+122.561 -3 0
4 .0

N
A/G U/G 0 11. FOR BONDING DETAILS REFER TO AA-036674.

NED
CLASS 1500# END OF 20" DISCH. HEADER 0 0

2
0

8
0 F

7
(WEST FLANK @ ABQQ-314 6

OBTAI
0 OR

8
. 12. FOR DETAILS OF CABLE CONNECTIONS TO PIPELINES

6
15

0
N 2 879 147.469

0
C AND STRUCTURES REFER TO AB-036381.
E 370 175.091 O
N
T
.

BE
.19
28
+2
20
A
ST

PART,SHALL
3
7 .05
T-2 222
P 8 0
87 0. 44
N
2 82
69
3
E T
SE
ING
TH
0

N
0 0
N

4 0

2
0 0
2

8
7 7
8

7
3 6 TA
7

3 REFERENCE DRAWINGS

9
DA
9

N
E

0
27

I
4

0
E
0

RV

0
0

CU
DWG. CONTROL FOR J.O.10-01883-0001 PD-100001

FULL,OR
'15"
°50
8
=5 0m
CP DETAIL DRAWING PB-320003.001
} 00

N
10.
=2 0m

2
R 42 PLAN AND PROFILE PB-540008.016
ROAD

8.

8
1
=1

7
1m
65

8
T
5.

6
1
=2

N
STA 21+122.561 L

I
T

PROPOSED 20" CS U/G DISCH. P/L ( WEST FLANK)


MI

MRL

END OF 20" DISCH. HEADER

ON
NG LI

(WAST FLANK NEAR ABQQ-314

REPRODUCTI
T
N 2 879 350.963

E 370 366.051
ROW
DRAWI

X
X
X

20"

(PROVISION FOR
B2
49

TEMPORARY SCRAPER)
1
LEGEND
ANCHOR

84

SAUDIARAMCO.NO
21+166.

. 7
43 7 9.68
+4 -2 76
20 PI
A. 8 57
2
ST 9 87 0.
7 6.03 2 82
-2 85
N
6 9
PC 8 6 3 T
87 160
. E SE
2 90 NG
DRAG

N I
69 TH
3 NO
STA

T B2 BONDING STATION
E SE
HING
T
NO

N
T TEST STATION WITH

2
N

N
KILOMETER READING

8
N

7
2

0 0 0

2
0

8
2

0 0
8

0 0

8
4 2
8

8
7

0
0 0 9
7
9

OF
9

0
7 7 6
9
4

0
3 3 3
2

3
0

0
0
0

0
E E E E
0

PROPERTY
SOLE
FOR CATHODIC PROTECTION

THE
DETAILS OF VALVE STATION,

ISOLATION AND BONDING

ARE
FACILITIES SEE SA
0 25 50 75 100 125 150 175 200 225 250
DWG. NO. PB-320003

N
METERS

HEREI
SCALE: 1:2500M

NED
REVISION VALIDATION

CONTAI
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-01883-0001-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER

ON
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

NFORMATI
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

KMS HFA
01/15/18 01/15/18

REV.NO. DATE REVISION DESCRIPTION

C 01/15/18 ISSUED FOR 100% PROJ. PROPOSAL

I
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-01883-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE

CATHODIC PROTECTION LAYOUT

NG
CAT

DRAWI
20" U/G DISCH. P/L (WEST FLANK)

GOSP-5

S
THI
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

113 X PB-340006 016 C


Saudi Aramco 2634 ENG. (05/05)

RESTRICTED VECTOR CADD-05

You might also like