Saudi Arabian Oil Company: Notes

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES:

SAUDIARAMCO.
1.ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.

2. CATHODIC PROTECTION INSTALLATION SHALL BE IN


ACCORDANCE WITH SAES-X-400.

3. FOR CATHODIC PROTECTION JUNCTION BOX


INSTALLATION SEE SAUDI ARAMCO STANDARD
DRAWING AB-036540.

OF
4. FOR CATHODIC PROTECTION CABLE MARKER AND ANODE

CONSENT
MARKER PLATE INSTALLATION SEE SAUDI ARAMCO
STANDARD DRAWING AB-036351.

5. FOR INSTALLATION OF CATHODIC PROTECTION


POSITIVE AND NEGATIVE CABLE SEE SAUDI ARAMCO

TTEN
STANDARD DRAWING AA-036675.

WRI
6. ALL BURIED GROUND CABLES ARE INSULATED
(JACKETED).

THE
7. TEST STATIONS AND ANODES SHALL BE OFFSET
FROM ROAD CENTERLINES IN ACCORDANCE WITH

THOUT
SAUDI ARAMCO STANDARDS.

8. INSTALLATION OF CATHODIC PROTECTION TEST

WI
MA STATIONS AND JUNCTION BOXES SHALL BE IN
TC ACCORDANCE WITH STANDARD DRAWING AA-036352,

NG
HL

DRAWI
IN AB-036907 AND AB-036540.
SE E S
E T
DW A 6 9. INSTALLATION OF GALVANIC ANODES FOR ROAD AND
G. +
$ PB 550 CAMEL PIPELINE CROSSINGS SHOULD BE IN

S
-3 .0

THI
ACCORDANCE WITH STANDARD DRAWING AA-036352.
40 00
00

K)
F
6. OR 10. INSTALLATION OF GALVANIC ANODES AT ISOLATION
00 CO

FROM
AN
$ 5 NT CASING ROAD CROSSING SHOULD BE IN ACCORDANCE
. WITH STANDARD DRAWING AA-036352.

FL
0
0
11. FOR BONDING DETAILS REFER TO AA-036674.

NED
0
4

T
K

6
N $

ES

OBTAI
2
12. FOR DETAILS OF CABLE CONNECTIONS TO PIPELINES

E
N 8
$ 6 N
8

(W
2
8 $ 2
0 2 AND STRUCTURES REFER TO AB-036381.
6 0 8
8 6
4 7
0 $ 8
0 0

BE
L
0

P/
$ $
N

PART,SHALL
2

H.
8
6

0
$ 8

0
0 $

8
0 $

SC
3
0 K

6
AS $

3
PH

DI
3 AL
$ $
03

E
9. T
15 36 1 RO $
PI
- 8 35 AD
86 3. $
01

G
2 4 $
N 36
$

U/
T
SE $ REFERENCE DRAWINGS

N
E N G

I
I $
TH
NO TA
DA DWG. CONTROL FOR J.O.10-01883-0001 PD-100001

FULL,OR
B2

S
6 15 $ $

"C
14 E PR
8. RV $ $
56 CU OP CP DETAIL DRAWING PB-320003.001
7+
A. 09
4
2" OS

20
ST 4. 9' 01
2
-
15 45 8 °3 4. ED $ STA 6+857.19
K PLAN AND PROFILE PB-540008.006
PC 8 01 78
0m 42
86 3. = 7+ 20
00 00 2 PT- 14
2 } 5. A 87 "C
N 4 10 ST 0.
$

ED
N 6 9m
3 T 15 34
$

N
=
2 SE 01 - 8 S $ N 2 868 077.076

I
R .
PT 8 48 $
8 E NG
I 86 4m 86 3. U/
6
TH = 13 93

OS
8 4. 2 E 363 495.371
NO T 3 G

ON
6 14 N 6 $

0
3 T

7.
0
0
= SE DI NOTHING SET N

REPRODUCTI
L SC
E NG

OP
I
TH H. $ 2
NO 8

M
P/ 6

K.
B2 $ $ 8

PR
L 0
0
(W $ 0
ES
T T PI- 14
K

0
$ FL

0
AN

8
ST N 2 868 174.920

3
$ A. K)

6
PC 7+

3
$ 02 E 363 462.861
- LEGEND

SAUDIARAMCO.NO
14 0.

E
N 64 NOTHING SET
2 3
E 86
$ $ 8
36 20
NO 8 K
TH 3 .81 Q
N I
NG 5 58 4 }
2
$ SE .98 = K B2 BONDING STATION
8 3 R 89 CU
6
8
4 $
T
T
=
10
5.
°1
1'
32
RV
E
Q
0 = 00 " 14
0 10
L 0m DA

0
N 3 T TEST STATION WITH

0
= .53 TA
2

6
16 0 KILOMETER READING
8 $

3
6 3. m
45

6
8

3
6 3m
0

E
0

OF
M $
A
T
C W

PROPERTY
H W
L K
IN
S E
E N
E ST 2
8
D A K 6
W 8

0
G 7+ 2

0
0
.

4
0
P 90

SOLE
6
B
-3 0.

3
4 00

E
0
0 0
0
6 FO

THE
.
0 R
0 C
7 O
N

ARE
T
.
0 25 50 75 100 125 150 175 200 225 250

N
METERS

HEREI
SCALE: 1:2500M

NED
REVISION VALIDATION

CONTAI
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-01883-0001-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER

ON
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

NFORMATI
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

KMS HFA
01/15/18 01/15/18

REV.NO. DATE REVISION DESCRIPTION

C 01/15/18 ISSUED FOR 100% PROJ. PROPOSAL

I
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-01883-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE

CATHODIC PROTECTION LAYOUT

NG
CAT

DRAWI
20" U/G DISCH. P/L (WEST FLANK)

GOSP-5

S
THI
ABQAIQ SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

113 X PB-340006 006 C


Saudi Aramco 2634 ENG. (05/05)

RESTRICTED VECTOR CADD-05

You might also like