Training Activity Matrix: S P T C K
Training Activity Matrix: S P T C K
Read Information Sheet 4.1-1 to Joseph Ang Install consumer service Practical Work Feb 27, 2017 Ang, Echavez, Uy,
Information Sheet 4.1-3 Gary connection facility Area 8:00 AM to 12:00 NN Chavez and Cabral
Do the self-check 4.1-1 to 4.1-3 Echavez Competency Base-Learning Workstation # 4 1:00 PM – 5:00 PM may proceed to LO2
Check answer base on the answer key Keth Uy Material Install consumer
4.1-1 to 4.1-3 Fred Tools, equipment, hardware service
Perform Task Sheet 4.1-3 Chavez and PPE (see range of connection facility
Andrea variables)
Evaluate performance based on Cabral Site or work area
Performance Criteria Checklist 4.1-3 timber hardware
Line truck
Prepared by:
REYNALDO S. MANUEL
Line Construction (Electric Power Distribution) NCII - Trainer