Crono Adq Mat Huilloc Ok 16.05.2019

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 60

MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E.

PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
201040001 PETROLEO D-2 gal 586.98 12.39
### ASFALTO RC-250 gal 341.09 40.00
ASTA DE BANDERA
### und 4.00 600.00
203020002 FLETE TERRESTRE glb 1.00 170,000.00
### ALAMBRE NEGRO RECOCIDO N° 8 kg 2,788.65 3.50
### ALAMBRE NEGRO RECOCIDO N° 16 kg 8,981.80 3.50
204020010 ANGULO 1 1/2"x1 1/2"x1/8"x6m m 1,126.20 6.50
204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 141,870.79 3.50
### CLAVOS PARA MADERA CON CABEZA DE 3" kg 2,259.77 3.50
204120006 CLAVOS DE ACERO DE 3/4" kg 5,119.10 3.50
204120007 HIPOCLORITO DE CALCIO AL 70% kg 0.05 62.50
204180010 ARCO DE FUTBOL und 1.00 750.00
204180011 TABLERO DE BASQUET und 1.00 750.00
204210007 TEE DE ALUMINIO 1"X1"X1/8" X 6m m 7,166.74 8.40
204210008 TEE DE ACERO SCHEDULE 40 2" und 1.00 34.30
204210009 TEE DE ACERO SCHEDULE 40 4" und 3.00 68.67
204240030 ABRAZADERA DE PLATINA 1"X1/8" und 72.00 12.66
### CONEXIONES A CAJA PVC SEL 3/4" pza 916.00 0.80
### TUBERIA PVC SAP C-10 1" m 106.28 3.50
### TUBERIA PVC SAL 2" m 101.39 3.50
### TUBERIA PVC SAP PRESION C-10 1/2" m 140.26 1.80
### TUBERIA PVC SEL P/INST. ELECTRICAS DE 3/4" m 4,046.78 1.60
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
### TUBERIA PVC SAL 3" m 101.72 5.50
### TUBERIA PVC SAL 6" m 24.68 45.00
### TUBERIA PVC SAL 4" m 94.70 9.00
### CODO PVC SAP S/P 1/2" X 90° und 56.00 1.50
### CODO PVC SAP S/P 3/4" X 90° und 22.00 2.00
### CODO PVC SAP S/P 1" X 90° und 3.00 2.50
### CODO PVC SAP S/P 3" X 45° und 18.00 5.00
### CODO PVC SAP S/P 3" X 90° und 36.00 5.00
### CODO PVC SAP C/R 1/2" X 90° und 76.00 1.50
### CODO PVC SAL 4" X 90° und 7.00 7.00
### CODO PVC SAL 2" X 90° pza 6.30 2.50
### CODO PVC SAL 2" X 45° und 5.25 2.50
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
### TEE PVC SAP S/P 3/4" und 11.00 2.20
### TEE PVC SAL 4" X 2" und 24.00 7.00
### TEE PVC SAP 1" und 7.00 4.00
### TEE PVC SAP 1/2" und 22.00 2.00
### CURVA PVC SEL 3/4" und 1,357.00 0.50
### ADAPTADOR PVC ISO 4422-ACERO C-40 110mm - 4" und 1.00 28.85
### REDUCCION PVC-SAP S/P DE 3/4" A 1/2" und 12.00 2.00
### REDUCCION PVC SAP S/P DE 1" A 3/4" und 8.00 1.50
### UNION PVC SEL 3/4" und 1,537.00 0.50
### CAPACITACION AL PERSONAL DOCENTE Y ADMINISTRATIVO glb 1.00 30,790.00
### YEE PVC SAL 2" x 2" und 15.00 3.50
### YEE PVC SAL 4" x 2" und 24.00 5.00
### YEE PVC SAL 4" x 4" und 21.70 12.00
### PIEDRA CHANCADA 1/2" PUESTO EN OBRA m3 1,348.13 93.22
### MONITOREO ARQUEOLOGICO glb 1.00 36,665.80
### MONITOREO DE ESTUDIO DE IMPACTO AMBIENTAL glb 1.00 34,500.00
### PIEDRA MEDIANA DE 6" PUESTO EN OBRA m3 254.18 80.00
### ARENA FINA m3 234.52 127.00
### ARENA GRUESA PUESTO EN OBRA m3 923.04 93.22
207030001 HORMIGON PUESTO EN OBRA m3 904.30 84.74
207040002 MATERIAL DE PRESTAMO SELECCIONADO OBRA m3 2,052.15 70.00
### TIERRA DE CULTIVO m3 33.98 30.00
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
207070002 AGUA PARA LA CONSTRUCCION mes 12.00 350.00
207070005 ALMACEN Y OFICINA mes 12.00 1,500.00
209040003 TAPA CON MARCO FIERRO FUNDIDO PARA AGUA 12" X 12" pza 1.00 12.00
### TECNOPOR DE 1" m2 64.45 3.12
210060001 WATER STOP m 12.00 4.40
212030003 CODO DE ACERO SCHEDULE 40 4"X90 und 4.00 10.17
212030004 CODO DE ACERO SCHEDULE 40 2"X90 und 6.00 42.40
212040002 REDUCCION DE ACERO SCHEDULE 40 DE 4"-2" und 2.00 42.40
213010001 CEMENTO PORTLAND TIPO IP (42.5 kg) bol 21,013.15 24.00
### YESO BOLSA 28 kg bol 74.68 7.50
213050001 PORCELANA kg 79.38 4.60
### OCRE ROJO kg 156.59 12.00
### TUBERIA CPVC DE 1/2" X 5 m m 59.62 3.34
### TUBERIA CPVC DE 3/4" X 5 m m 19.95 5.67
### CODO CPVC DE 1/2" x 90° und 20.00 1.50
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
### TEE CPVC DE 1/2" und 6.00 1.50
### TEE CPVC DE 3/4" und 4.00 1.80
### TAPON HEMBRA CPVC DE 1/2" und 10.00 1.50
### LADRILLO KK DE ARCILLA 9X14X24 cm und 68,122.24 1.23
### LADRILLO PARA TECHO 8H DE 15X20X30 cm und 13,116.36 2.30
### LADRILLO PANDERETA 10X12X25 cm mll 1,186.97 1.23
216010017 MODULOS PREFABRICADOS PARA ESTUDIANTES DURANTE PROCESO CONSTRUCTIVO glb 6.00 30,000.00
### CANTONERA DE ALUMINIO DE 3" X 1" m 85.50 5.87
217020002 CANTONERA DE ALUMINIO 2" m 394.80 2.87
### TUBERIA F°G° 1" m 2.52 15.13
### TUBERIA F°G° 1 1/4" m 11.13 20.23
### TUBERIA F°G° 1 1/2" m 15.38 21.76
### TUBERIA F°G° 3" m 31.34 38.78
222030002 SIKA 1 (balde de 20 kg) bal 4.34 65.00
222080017 PEGAMENTO PARA LOSETAS Y CERAMICAS bol 443.05 65.00
222080018 PEGAMENTO PARA PVC gal 11.51 90.00
222100001 SILICONA und 180.08 12.30
222140008 BARNIZ SELLADOR PARA MADERA gal 1.13 36.90
### SELLADOR DE JUNTAS gal 18.33 160.15
225020137 CERAMICA ANTIDESLIZANTE H=7.5CM m 603.55 8.47
225020138 CERAMICA 0.45X0.45 m m2 333.39 29.66
225020139 CERAMICA ANTIDESLIZANTE 0.45X0.45 cm m2 1,227.09 29.66
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
### FRAGUA PARA CERAMICO kg 850.66 2.00
228180004 TEJA ANDINA (1.14x0.72 m.) pln 1,352.07 32.00
231010001 MADERA TORNILLO p2 45,488.98 5.74
231100002 MADERA CORRIENTE PARA ESTACAS p2 249.65 2.50
234020019 BALDOSA ACUSTICA PARA CIELORASO (FIBRA MINERAL) m2 1,054.53 34.92
### CERRADURA 3 GOLPES und 30.00 65.00
### BISAGRA CAPUCHINA ALUMINIZADA 3 1/2"x3 1/2" und 207.00 13.70
237120002 TIRAFON PARA 1/4" X 5" pza 2,426.42 2.11
237120004 TIRAFON 3" und 36.00 2.50
238010001 LIJA PARA MADERA plg 29.36 1.64
240010014 PASAMANO DE TUBO NEGRO DE 2" m 82.85 114.80
### PINTURA ESMALTE SINTETICO gal 14.17 60.00
240020016 IMPRIMANTE gal 300.83 30.00
240030005 PINTURA SATINADA gal 240.66 45.50
240050007 PINTURA EPOXICA gal 4.78 58.00
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
### CHARLAS DE SEGURIDAD CON EL PERSONAL glb 1.00 9,637.25
### THINNER gal 6.77 50.00
### IMPRIMANTE PARA SELLAR JUNTAS gal 1.33 225.63
240160001 BARNIZ MARINO gal 8.81 69.00
241020002 CINTA AISLANTE und 41.95 4.20
241030001 CINTA TEFLON und 46.44 1.80
241030002 CINTA TEFLON pza 30.09 1.80
243120001 VIDRIO INCOLORO e= 6mm p2 11,509.22 4.50
### DESAGUE DE CANASTILLA PARA LAVADERO DE 3 X 1½" und 1.00 5.00
### SUMIDERO CROMADO ROSCADO DE 2" und 24.00 4.80
### TUBO DE ABASTO 1/2" und 1.00 10.17
### TRAMPA P CROMADA P/LAVADERO 1½" und 1.00 10.00
### REGISTRO DE BRONCE DE 2" und 2.00 5.00
### REGISTRO DE BRONCE DE 4" und 7.00 10.00
247010004 LAVATORIO DE BUENA CALIDAD PARA GRIFERIA INCLUYE ACCESORIOS und 13.00 200.00
### INODORO TANQUE BAJO NORMAL BLANCO INCLUYE ACCESORIOS und 14.00 300.00
### LAVADERO DE ACERO INOXIDABLE CIRCULAR DE UNA POZA und 1.00 200.00
### TANQUE DE AGUA DE ETERNIT (POLIETILENO) DE 10000 LITROS INCLUYE ACCESORIOS INTERNOS und 2.00 10,000.00
### NIPLE DE FIERRO GALVANIZADO DE 3/4" x 2" und 16.00 10.00
### NIPLE DE FIERRO GALVANIZADO DE 1/2" x 1 1/2" und 16.00 20.00
249050002 UNION SIMPLE CPVC C-10 3/4" C/R und 12.99 1.50
249050003 UNION FLEXIBLE 2" und 1.00 5.08
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
249050004 UNION FLEXIBLE 4" und 1.00 7.50
### UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" und 32.00 9.00
252010003 TUBERIA PVC SAP PRESION C-10 3/4" m 64.89 1.69
### BRIDA ROMPE AGUA PARA TUB. DE 2" und 1.00 38.14
### BRIDA ROMPE AGUA PARA TUB. DE 4" und 2.00 67.80
253020006 VALVULA CHECK 2" und 1.00 39.36
253020009 VALVULA CHECK 4" und 1.00 186.44
VALVULA MAXI-VENT 2"
253040004 und 10.00 200.00
253110013 VALVULA DE ALIVIO DE 2" und 1.00 67.80
### VALVULA COMPUERTA DE BRONCE DE 4" und 2.00 585.00
### VALVULA COMPUERTA DE BRONCE DE 3/4" und 16.00 32.10
### VALVULA COMPUERTA DE BRONCE DE 2" und 2.00 76.27
### DUCHA GIRATORIA BRAZO Y LLAVE und 10.00 45.00
### LLAVE PARA PILETA (MODELO GANZO) und 17.00 70.00
### FLUORESCENTE CIRCULAR LED BLANCA und 51.00 79.90
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
261000003 LAMPARA DE EMERGENCIA und 36.00 69.90
261090020 LUMINARIA, REFLECTOR HALOGENURO METALICO DE 400W und 10.00 859.23
### INTERRUPTOR TERMOMAGNETICO 3 X50 A und 6.00 63.56
### INTERRUPTOR TERMOMAGNETICO 2 X20 A X 220 V und 12.00 32.20
### INTERRUPTOR TERMOMAGNETICO 2 X15 A X 220 V und 13.00 32.20
### INTERRUPTOR TERMOMAGNETICO 2 X30 A X 220 V und 13.00 32.20
### INTERRUPTOR BIPOLAR SIMPLE BAKELITA und 50.00 6.15
### INTERRUPTOR DOBLE BIPOLAR BAKELITA und 4.00 8.20
262090009 DRYWALL 6mm m2 369.56 95.00
262100002 ENERGIA ELECTRICA PARA LA CONSTRUCCION mes 12.00 350.00
### TOMACORRIENTE DOBLE PLANO BAKELITA und 88.50 13.14
### PLACA DE 01 SALIDAS PARA RJ45 und 86.00 16.85
### PLACA DE 02 SALIDAS PARA RJ45 und 4.00 50.00
### EQUIPO RACK und 1.00 75.00
### EQUIPO RACK - SWITCH 01 und 1.00 50.00
262150002 SUMINISTRO Y COLOCACION PUERTA DE MADERA DE TABLERO REBAJADO P-1 S/DISEÑO (1.50M X 2.83M) und 14.00 600.00
262150003 SUMINISTRO Y COLOCACION PUERTA DE MADERA DE TABLERO REBAJADO P-3 S/DISEÑO (0.80M X 2.83M) und 11.00 750.00
262150004 SUMINISTRO Y COLOCACION PUERTA DE MADERA DE TABLERO REBAJADO P-3 S/DISEÑO (0.70M X 1.80M) und 8.00 250.00
262150005 SUMINISTRO Y COLOCACION PUERTA DE MADERA DE TABLERO REBAJADO P-6 S/DISEÑO (1.00M X 1.80M) und 2.00 650.00
262150006 SUMINISTRO Y COLOCACION PUERTA DE MADERA DE TABLERO REBAJADO P-2 S/DISEÑO (1.00M X 2.83M) und 14.00 650.00
262150007 SUMINISTRO Y COLOCACION PUERTA DE MADERA DE TABLERO REBAJADO P-4 S/DISEÑO (0.80M X 2.83M) und 2.00 500.00
262150009 ESTRUCTURA METALICA REJA S/DISEÑO m2 21.22 50.00
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
262150026 SUMINISTRO Y COLOCACION PUERTA DE MADERA DE TABLERO REBAJADO P-8 S/DISEÑO (0.85M X 3.00M) und 1.00 650.00
262150030 PUERTA METALICA P-10 S/DISEÑO (PLAN. MET. ESTRIDAS C/ TUBO NEGRO) (3.50M X 3.00M) und 2.00 3,500.00
262150031 PUERTA METALICA P-9 S/DISEÑO (PLAN. MET. ESTRIDAS C/ TUBO NEGRO) (1.20M X 3.00M) und 1.00 2,000.00
262150032 SUMINISTRO Y COLOCACION PUERTA DE MADERA DE TABLERO REBAJADO P-11 S/DISEÑO (0.85M X 2.25M) und 1.00 500.00
262160003 JACK RJ45 CAT 6 PARA MONTAR EN PLACA und 45.00 9.26
267090015 MANIJA DE BRONCE PARA PUERTA und 31.00 15.00
267110022 TAPA PARA CAJA DE DESAGUE DE FIERRO FUNDIDO DE 12" X 24" und 9.00 45.00
267110025 ACONDICIONAMIENTO DE HUERTO ESCOLAR glb 2.00 10,000.00
268010001 CAJA OCTOGONAL FIERRO GALVANIZADO und 11.00 1.69
### CAJA RECTANGULAR GALV. 4"X2 1/8" und 460.00 2.90
### CAJA DE FºGº DE 100x100x50mm und 3.00 4.07
### CAJA DE REGISTRO CONCRETO PREFABRICADO 12" x 24" und 9.00 45.00
### CAJA DE REGISTRO CONCRETO PREFABRICADO 12" X 12" und 1.00 25.00
270000003 CABLE DOBLE DE AUDIO m 142.38 0.67
270010046 CABLE NYY 1 X 6 MM m 122.60 1.53
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
270010288 CABLE TW # 14 AWG m 630.79 1.27
270010289 CABLE TW # 12 AWG m 1,351.82 1.53
270010290 CABLE TW # 10 AWG m 148.58 2.97
270010295 CORDON DE RESPALDO PARA EL SELLO DE JUNTAS 7/8" m 402.80 1.05
270010296 CABLE DE RED UTP CAT. 6 m 351.59 1.90
270010297 KEYPAD und 1.00 96.00
270010298 PARLANTES CIRCULARES und 11.00 186.64
270110327 FLUORESCENTES RECTANGULAR (INCL. REJILLA ADOSAR 4X18W Y BRAQUETS) und 156.00 135.17
270110328 FLUORESCENTES RECTANGULAR (INCL. REJILLA ADOSAR 2X36W Y BRAQUETS) und 28.00 135.17
270110329 FAROLA T/CONICA DE 150W JP-250 und 7.00 52.50
### CABLE CONTRA INCENDIO FPL 4x18 AWG m 10.50 0.56
272010089 TUBO NEGRO 2"X1"X2MM und 1,432.64 12.05
272050010 FORMADOR DE EMPAQUETADURA gal 1.93 68.96
272050013 TARUGO und 36.00 1.50
### TABLERO DE DISTRIBUC. 3o, 380/220V, P/S.E AEREA DE 100 KVA und 9.00 29.66
### TABLERO TDI 0.25X0.20M PARA 5 TERMOMAGNETICOS pza 1.00 25.42
### PARARRAYO TIPO FRANKLIN INCL/ACCESORIOS PARA PUESTA A TIERRA INCL/INSTALACION und 2.00 15,000.00
276020077 SISTEMA DE PUESTA A TIERRA jgo 3.00 594.91
276020078 DISEÑO DE MEZCLAS DE CONCRETO und 3.00 350.00
279010048 TERRAZO PULIDO CLARO m2 90.23 49.20
290130022 AGUA m3 1,366.19 2.10
290130023 ARBUSTO und 193.79 5.00
MEJORAMIENTO DE LA PRESTACIÓN DE SERVICIOS EDUCATIVOS DE LA I.E. PRIMARIA N
DE OLLANTAYTAMBO - URUBAMBA - CUSCO

DETALLE DE LA GESTIÓN DE USO DE MATERIALES

Item Descripción Und. Cantidad Precio S/.

MATERIALES
290130024 PLANTON DE ARBOL und 193.79 5.00
### CARTEL DE IDENTIFICACION DE OBRA 3.60M X 2.40M und 1.00 1,500.00
### PC DE CONTROL und 1.00 1,400.00
### CONSOLA DE CONTROL und 1.00 1,260.00
### SIRENA und 2.00 110.20
### CENTRAL DE ALARMAS und 1.00 214.50
290230060 PRUEBA DE CALIDAD DEL CONCRETO ROTURA und 75.00 25.00
290230061 PRUEBA ELECTRICAS (AISLAMIENTO Y CONTINUIDAD) und 10.00 350.00
### UPS REGULADOR DE RED und 1.00 75.00
### CUMBRERA ARTICULADA SUPERIOR TEJA ANDINA pza 300.19 25.00
### CUMBRERA ARTICULADA INFERIOR TEJA ANDINA pza 300.19 25.00
MOBILIARIO Y EQUIPAMIENTO EDUCATIVO
### glb 1.00 348,601.76
291020003 ABONO ORGANICO kg 6.80 67.50
TOTAL
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

7,272.66 1,858.50 1,858.50 1,858.50 867.30 829.86 829.86


13,643.40
2,400.00
170,000.00 28,333.33 28,333.33 28,333.33 28,333.33 28,333.33 9,444.44 9,444.44 9,444.44
9,760.27 3,500.00 1,750.00 1,750.00 1,750.00 1,010.27 505.13 505.13
31,436.32 12,250.00 8,750.00 8,750.00 1,686.32
7,320.31 7,320.31 7,320.31
496,547.77 157,500.00 105,000.00 105,000.00 87,500.00 41,547.77 41,547.77
7,909.19 3,150.00 1,575.00 1,575.00 1,609.19
17,916.85 4,725.00 3,150.00 3,150.00 3,150.00 3,741.85 1,870.93 1,870.93
3.14
750.00 0.00
750.00
60,200.62 20,066.87 20,066.87
34.30
206.01
911.52
732.80
371.99
354.86
252.46
6,474.84
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

559.48
1,110.78
852.30
84.00
44.00
7.50
90.00
180.00
114.00
49.00
15.75
13.13
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

24.20
168.00
28.00
44.00
678.50 339.25 339.25
28.85
24.00
12.00
768.50 768.50
30,790.00
52.50 52.50
120.00 120.00
260.40 260.40
125,672.96 13,983.00 23,305.00 23,305.00 23,305.00 23,305.00 11,652.50 11,652.50
36,665.80 6,110.97 6,110.97 6,110.97 6,110.97 6,110.97
34,500.00 17,250.00 17,250.00
20,334.39 6,778.13 6,778.13 6,778.13 3,389.07 3,389.07
29,783.96 9,927.99 4,963.99 4,963.99
86,046.05 9,322.00 18,644.00 18,644.00 18,644.00 18,644.00 9,322.00 9,322.00
76,629.97 8,474.00 16,948.00 16,948.00 16,948.00 17,311.97 8,655.98 8,655.98
143,650.50 35,912.63 35,912.63 35,912.63 35,912.63 17,956.31 17,956.31
1,019.50
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

4,200.00 350.00 350.00 350.00 350.00 350.00 87.50 87.50 87.50


18,000.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 375.00 375.00 375.00
12.00
201.08 201.08 201.08
52.80
40.68
254.40
84.80
504,315.64 6,000.00 72,000.00 72,000.00 60,000.00 60,000.00 30,000.00 30,000.00
560.08 186.69 186.69
365.14
1,879.08
199.13
113.12
30.00
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

9.00
7.20
15.00
83,790.36 27,930.12 27,930.12 13,965.06 13,965.06
30,167.63 15,083.81 15,083.81
1,459.97 729.99 729.99 729.99
180,000.00 180,000.00
501.89
1,133.08
38.13
225.16
334.72
1,215.46
282.36 282.36
28,798.42
1,035.78 517.89
2,215.00
41.72
2,935.13
5,112.07
9,888.21
36,395.58
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

1,701.31
43,266.08
261,106.72 52,221.34 52,221.34 52,221.34 52,221.34 52,221.34 26,110.67 26,110.67
624.13 624.13
36,824.35
1,950.00
2,835.90
5,119.75
90.00
48.16
9,511.18
850.36
9,024.86
10,950.16
276.98
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

9,637.25 803.10 803.10 803.10 803.10 803.10 200.78 200.78 200.78


338.73
299.91
607.83
176.19
83.59
54.16
51,791.47
5.00
115.20
10.17
10.00
10.00
70.00
2,600.00
4,200.00
200.00
20,000.00
160.00
320.00
19.49
5.08
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

7.50
288.00
109.66
38.14
135.60
39.36
186.44
2,000.00
67.80
1,170.00
513.60
152.54
450.00
1,190.00
4,074.90
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

2,516.40
8,592.30
381.36
386.40
418.60
418.60
307.50
32.80
35,108.20
4,200.00 350.00 350.00 350.00 350.00 350.00 87.50 87.50 87.50
1,162.89
1,449.10
200.00
75.00
50.00
8,400.00
8,250.00
2,000.00
1,300.00
9,100.00
1,000.00
1,061.00
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

650.00
7,000.00
2,000.00
500.00
416.70
465.00
405.00
20,000.00
18.59
1,334.00
12.21
405.00
25.00
95.39
187.58
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

801.10
2,068.29
441.27
422.94
668.03
96.00
2,053.04
21,086.52
3,784.76
367.50
5.88
17,263.32
133.34 133.34 133.34
54.00
266.94
25.42
30,000.00
1,784.73
1,050.00 350.00 350.00 350.00
4,439.07
2,869.00 286.90 286.90 286.90 286.90 286.90 71.73 71.73 71.73
968.95
IA Nº 50617 DE HUILLOC, DISTRITO

FEB MAR ABR MAY JUN Jun-19

Parcial S/. MES 01 MES 02 MES 03 MES 04 MES 05 SEMANA 1 SEMANA 2 SEMANA 3

968.95
1,500.00 1,500.00
1,400.00
1,260.00
220.40
214.50
1,875.00 200.00 200.00 200.00 200.00 200.00 100.00
3,500.00
75.00
7,504.64
7,504.64
348,601.76
458.91
3,412,557.22 510,828.98 396,648.77 388,235.45 377,774.62 380,630.63
PRESUPUESTO DE ADELANTO DE MATERIALES JUN-19 AL ENE-20 1,739,069.40
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

28,333.33 9,444.44 9,444.44 9,444.44

20,066.87 20,066.87 20,066.87 20,066.87


34.30
206.01
911.52
732.80 732.80
371.99 186.00 186.00
354.86 177.43 177.43
252.46 126.23 126.23
6,474.84 3,237.42 3,237.42
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

559.48 279.74 279.74


1,110.78 555.39 555.39
852.30 426.15 426.15
84.00 84.00
44.00 44.00
7.50 7.50
90.00 90.00
180.00 180.00
114.00 114.00
49.00 49.00
15.75 15.75
13.13 13.13
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

24.20 24.20
168.00 168.00
28.00 28.00
44.00 44.00
0.00
28.85 28.85
24.00 24.00
12.00 12.00

18,469.96 9,234.98 9,234.98


6,110.97 6,110.97 6,110.97

9,927.99 4,963.99 4,963.99 9,927.99 4,963.99 4,963.99


2,148.05 1,074.02 1,074.02
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

87.50 350.00 87.50 87.50 87.50 87.50 350.00 87.50 87.50 87.50 87.50 350.00
375.00 1,500.00 375.00 375.00 375.00 375.00 1,500.00 375.00 375.00 375.00 375.00 1,500.00
12.00 12.00

52.80 52.80
40.68
254.40
84.80
60,000.00 20,000.00 20,000.00 20,000.00 60,000.00 20,000.00 20,000.00 20,000.00 60,000.00
186.69 93.35 93.35

199.13 199.13
113.12 113.12
30.00 30.00
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

9.00 9.00
7.20 7.20
15.00
27,930.12 13,965.06 13,965.06
15,083.81 7,541.91 7,541.91

501.89
1,133.08
38.13
225.16
334.72
1,215.46

14,399.21 14,399.21 14,399.21


517.89 172.63 172.63 172.63
1,107.50

5,112.07
4,944.11 4,944.11 4,944.11
12,131.86 12,131.86 12,131.86
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

850.66 850.66 850.66


21,633.04 10,816.52 10,816.52 21,633.04 10,816.52 10,816.52

18,412.17

2,559.88 1,279.94 1,279.94 2,559.88


90.00
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

200.78 803.10 200.78 200.78 200.78 200.78 803.10 200.78 200.78 200.78 200.78 803.10

83.59 83.59
54.16 54.16

115.20

10.00
10.00
70.00

160.00 160.00
320.00 320.00
19.49 19.49
5.08 5.08
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

7.50 7.50
288.00 288.00
109.66 109.66
38.14 38.14
135.60 135.60
39.36 39.36
186.44 186.44
2,000.00 2,000.00
67.80 67.80
1,170.00 1,170.00
513.60 513.60
152.54 152.54
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

17,554.10
87.50 350.00 87.50 87.50 87.50 87.50 350.00 87.50 87.50 87.50 87.50 350.00
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

405.00

18.59
667.00
12.21
405.00
25.00
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

8,631.66 4,315.83 4,315.83 8,631.66 4,315.83 4,315.83

4,439.07
71.73 286.90 71.73 71.73 71.73 71.73 286.90 71.73 71.73 71.73 71.73 286.90
GESTIÓN DE COSTOS - CRONOGRAMA DE MATERIALES

TIEMPO DE EJECUCIÓN
JUL Jul-19 AGO Aug-19 SET

SEMANA 4 MES 06 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 07 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 08

100.00 200.00 100.00 100.00 200.00 100.00 100.00 200.00

7,504.64 3,752.32 3,752.32


7,504.64 3,752.32 3,752.32

380,630.63 234,209.13 234,209.13 179,375.97 179,375.97 151,823.77


CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

6,821.70 6,821.70 6,821.70

3.14 3.14

34.30
206.01
911.52
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

10,263.33

1,019.50
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

87.50 87.50 87.50 87.50 350.00 87.50 87.50 87.50 87.50 350.00 87.50 87.50
375.00 375.00 375.00 375.00 1,500.00 375.00 375.00 375.00 375.00 1,500.00 375.00 375.00

40.68
254.40
84.80
30,000.00 30,000.00 22,800.00 11,400.00 11,400.00 22,800.00 11,400.00 11,400.00

365.14 365.14
939.54 939.54 939.54 939.54
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

15.00

501.89
1,133.08
38.13
225.16
334.72
1,215.46

14,399.21

1,107.50 1,107.50 553.75 553.75

2,935.13 2,935.13
5,112.07
4,944.11
12,131.86 12,131.86 12,131.86
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

850.66

18,412.17 18,412.17 18,412.17

1,417.95 472.65 472.65


2,559.88
90.00
48.16 48.16
9,511.18 4,755.59 4,755.59
850.36
4,512.43
5,475.08
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

200.78 200.78 200.78 200.78 803.10 200.78 200.78 200.78 200.78 803.10 200.78 200.78
338.73
299.91

176.19 176.19

5.00 5.00
115.20
10.17 10.17
10.00
10.00
70.00
2,600.00 2,600.00
4,200.00 4,200.00
200.00 200.00
20,000.00 20,000.00
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

450.00 450.00
1,190.00 1,190.00
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

2,516.40
8,592.30
381.36 381.36
386.40 386.40
418.60 418.60
418.60 418.60
307.50 307.50
32.80 32.80
17,554.10 17,554.10 17,554.10
87.50 87.50 87.50 87.50 350.00 87.50 87.50 87.50 87.50 350.00 87.50 87.50
1,162.89 1,162.89
1,449.10 1,449.10
200.00 200.00
75.00 75.00
50.00 50.00

1,061.00 1,061.00
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

416.70 416.70

405.00
10,000.00
18.59
667.00 667.00 667.00
12.21
405.00
25.00

187.58 187.58
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

801.10 801.10
2,068.29 2,068.29
441.27 441.27

668.03 668.03

21,086.52
3,784.76
367.50
5.88

54.00 54.00
266.94 266.94
25.42 25.42

1,784.73

4,439.07
71.73 71.73 71.73 71.73 286.90 71.73 71.73 71.73 71.73 286.90 71.73 71.73
CIÓN ENTREGABLE - (Meses)
Sep-19 OCT Oct-19 NOV Nov-19

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 09 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 10 SEMANA 1 SEMANA 2

100.00 100.00 200.00 100.00 100.00 75.00

151,823.77 101,642.66 101,642.66 141,089.51


Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

6,821.70
2,400.00 2,400.00

750.00 750.00
750.00 750.00
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

5,131.67 5,131.67 10,263.33 5,131.67 5,131.67 10,263.33 5,131.67 5,131.67

509.75 509.75
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

87.50 87.50 350.00 87.50 87.50 87.50 87.50 350.00 87.50 87.50 87.50 87.50
375.00 375.00 1,500.00 375.00 375.00 375.00 375.00 1,500.00 375.00 375.00 375.00 375.00

8,715.64 4,357.82 4,357.82


Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

41.72 41.72
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

1,950.00 975.00 975.00


472.65 1,417.95 708.98 708.98

850.36
4,512.43 4,512.43 4,512.43
5,475.08 5,475.08 5,475.08
0.00 276.98 276.98
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

200.78 200.78 803.10 200.78 200.78 200.78 200.78 803.10 200.78 200.78 200.78 200.78
338.73
299.91
607.83 607.83

25,895.74 12,947.87 12,947.87 25,895.74 12,947.87 12,947.87


Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

4,074.90 4,074.90
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

2,516.40
8,592.30

87.50 87.50 350.00 87.50 87.50 87.50 87.50 350.00 87.50 87.50 87.50 87.50

8,400.00 4,200.00 4,200.00


8,250.00 4,125.00 4,125.00
2,000.00 1,000.00 1,000.00
1,300.00 650.00 650.00
9,100.00 4,550.00 4,550.00
1,000.00 500.00 500.00
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

650.00 650.00
7,000.00 3,500.00 3,500.00
2,000.00 1,000.00 1,000.00
500.00 500.00

465.00 232.50 232.50

5,000.00 5,000.00 10,000.00 5,000.00 5,000.00

95.39 95.39
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

422.94 422.94

96.00 96.00
2,053.04 2,053.04
21,086.52
3,784.76
367.50
5.88

30,000.00 30,000.00
892.37 892.37

71.73 71.73
484.48 484.48 484.48 484.48
Nov-19 DIC Dec-19 ENE Jan-20

SEMANA 3 SEMANA 4 MES 11 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 MES 12 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4

484.48 484.48 484.48 484.48

1,400.00 1,400.00
1,260.00 1,260.00
220.40 220.40
214.50 214.50
75.00
1,750.00 1,750.00 1,750.00 1,750.00
75.00 75.00

174,300.88 174,300.88 174,300.88 87,150.44 87,150.44


458.91 458.91
141,089.51 331,166.21 331,166.21 219,131.51 219,131.51

You might also like