Document Control Procedure
Document Control Procedure
It is essential to keep certain documents at site for making a permanent record of each and
every item related to the project. Such items may include tests conducted at site, test
certificates, instruction issued to contractor, record of drawings issued to the contractor,
inventory of the material at site. All such site documents play an important role not only in
assuring the quality of the work, but also in making the total management of the project
comparatively easier. All these documents with a unique identification number have been listed
in the end of Chapters as Appendix A.
Document control is an art for transmittal, receipt, recording, processing filing and retrieval of
documents, and to ensure common format. The most important documents for QA/QC are final
design documents, test reports and instructions. Document control procedures, including
guidelines for correspondence control, are outlined below.
An important part of the Quality Control Manager’s work as regards to QA/QC procedures is to
keep adequate records. These records enable an appraisal to be made at any time of the
progress of work, they form the basis of fixing an accurate assessment in monitoring the
contractor’s work, they enable all material to be ordered in proper time, they enable the
designers to be assured that the assumptions made for design purposes are valid, they assist in
the solving of new design problems that they may arise during construction, and they form a
source of information on the subsequent behaviour of the completed works.
Project
Manager
Q.A/Q.C Administrative
Manager Engineer
Safety
Site Engineer Lab Technician
Engineer
Foreman
Supervisor
Manpower
All the Documents under the Document Control Procedure shall originate at the Site from the
Site / Field level Staff. The Project Manager is authorised to approve and transmit documents to
the Engineer / Client.
The General Site records and documents like Site Order Book, Daily Progress Report etc. shall
be initiated by the Field / Site Staff. These records shall be reviewed by the Works Q.A /Q.C
Manager, Signed and submitted to the Project Manager for further transmittal. Project Manager
shall review the Document, Sign and after proper recording in the Outward register would
submit it to Engineer and the Client.
Likewise, the Documents and Reports pertaining to Quality Control and Assurance shall
originate from QC field staff / QC Lab technician level. The QC documents / reports shall be
properly reviewed and signed by the QC Manager and submitted to the Project Manager for
further transmittal. Project Manager shall review the Document, Sign and after proper recording
in the Outward register would submit it to Engineer and the Client.
All the documents / reports shall be made in quadruplicate. One copy shall be filed at the Site
Office, One Copy shall be filed at the Project Manager’s Office and one copy each shall be
transmitted to the Engineer and the Client. This shall ensure that the documents / records are
available at all levels.
Generally, all the documents / records shall be transmitted to the Engineer /Client with two days
of origin from the Site level.
All the documents / records shall be maintained in Hard as well as Soft copy format and shall be
available in both formats for review at any time.
SOCODEV would maintain a file of site orders issued to contractor for record and compliance.
It is desirable to follow concrete pour card method. This is a method of giving written
instructions to the contractor in a card form about the concreting to be done in accordance
with the contractual provisions giving salient features of concrete mix proportion, water
cement ratio, test to be carried out such as slump test, casting of cube for strength test. It shall
be maintained by the contractor as per format No. C/DCP - 4 of Appendix A.
Each sample need take up not more than two or three down the page, and perhaps not all
the columns need have an entry for each sample. It is important to keep the system simple
and brief, so that no one has any trouble keeping it going.
1.8.4 Completion Records and Drawings
As built records are very important and consist of pictorial records (the Record Drawings, etc.)
of all the work as completed, showing the where about regarding dimensions of all parts as
they exist at completion, together with factual descriptions of their origin, operation and
their performance under test.
The work on record drawings would continue throughout the contract, a special set of
contract drawings being provided on which the Site Engineer marks out all deviations from
the original design from time to time, where extensive alteration are encountered, or where
preliminary surveys are made, completely new record drawings will have to be made.
UCTION QUALITY MANAGEMENT AND SURVEILLANCE SYSTEM
QUALITY ASSURANCE QUALITY CONTROL MANUAL
APPENDIX
SITE DOCUMENTS
Sl. No Name of Document Responsibility
Form No C/ DCP-1
Date :
Name of work :
Place/Site :
Agreement No :
Name of Contractor :
Description
COMMENTS ON THE PROGRESS AND QUALITY
Compliance
Site In-charge.
*(3 copies per set- one copy each to be sent to Client/Engineer by the contractor, one copy to be
retained at site)
STRUCTION QUALITY MANAGEMENT AND SURVEILLANCE SYSTEM
QUALITY ASSURANCE QUALITY CONTROL MANUAL
Form No C/DCP-2
MATERIAL REGISTER
Name of Work :
Contract Agreement No. :
Name of Contractor :
Name of Item :
Total Quantity Required :
Source :
Minimum Size of One Lot :
Sl. Date Previous Invoice Cumul Issued Cumul Balance Present Signature
Additio
No. Quantity / Bill ative / ative Outstan require of contrac
nal
No Quan consu Issue ding ment tor
Quantity
tity med Quan
Procured
tity
Name of Work :
Contract Agreement No. :
Name of Contractor :
Date :
EQUIPMENT AT SITE
Available :
Under Repair :
Sl. Name of Item Quan- Loca- Labour engaged
No. compo- Execu- Tity tion
nent ted Skilled Non Fitter Mason Others
skilled
1
Signature : Signature :
Name : Name :
Date : Date :
For Contractor For Client/Engineer
CONCRETE POUR RECORD Form No C/DCP-4
Name of Work :
Contract Agreement No. :
Name of Contractor :
Steel checked By :
Form work Checked By :
Scaffolding checked By :
Slump checked By :
Cube filled in the presence of :
Signature : Signature :
Name : Name :
Designation :
Name of Work :
Contract Agreement No. :
Name of Contractor :
Sl. Descripti Date of Size of Name of Status Status of Date Sign. Sign.
No. on of sampling sample Laboratory of D T Manufact and of of
sample Inspec uring Result contra DWSS
tion Certificate of Test tor
DESIGN AND DRAWING RECORD Form No C/DCP-6
Name of Work :
Contract Agreement No. :
Name of Contractor :
Sl. Details of Drawing Date of Status of Contractor’s Client’s
No. Title/ No Receipt of Drawing Signature Signature
Drawing (Original/
Revised)
ONSTRUCTION QUALITY MANAGEMENT AND SURVEILLANCE SYSTEM
QUALITY ASSURANCE QUALITY CONTROL MANUAL
Name of Work :
Name of Contractor :
Nature of non-conforming
Comments:
Yes No
i) Whether the item is structurally sound.
Signature : Signature :
Name : Name :
Date : Date :