Sample Project Estimation

The document outlines a 92 day construction timeline for a project involving equipment lifting and installation, piping erection, cable tray and panel erection, pipe support installation, hydrotesting, tie-ins and commissioning. It includes details on the main and parallel activities over time, manpower and equipment requirements, bulk materials, equipment, consumables and services needed.

Uploaded by

Rosnani Resdi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
236 views6 pages

Sample Project Estimation

The document outlines a 92 day construction timeline for a project involving equipment lifting and installation, piping erection, cable tray and panel erection, pipe support installation, hydrotesting, tie-ins and commissioning. It includes details on the main and parallel activities over time, manpower and equipment requirements, bulk materials, equipment, consumables and services needed.

Uploaded by

Rosnani Resdi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Timeline

Main Activity Parallel Activity Days


Mobilization 4
Site Clearing & Excavation 3
Foindation preparation 1
Lean Concrete Pouring 1
Rebar and Formwork 6
Concrete Pouring 1
Concrete Drying 3
Rebar and Formwork 6
Concrete Pouring 1
Concrete Drying 3
Pipe Spool and Support Fabrication
Equipment Lifting and Installation
- Coolin Tower Train 1 40 1
- Coolin Tower Train 2 1
- Coolin Tower Train 3 1
- GRP Tank 1
- Supply Pump 1
Equipment Levelling
- Coolin Tower Train 1 2
- Coolin Tower Train 2 2
- Coolin Tower Train 3 2
- GRP Tank
Pump Preallignment
Piping Erection 14
Cable Tray & Panel Erection
Pipe Support Installation Cable Pulling 10
Hydrotest Cable Termination 3
Touchup Paint Motor Solo Run 2
Pipe Blowing 2
Hot Shaft Allignment
Tie in 2
Bolt Tightening Backfilling & Levelling 1
Commissioning 7
Start Up 7
Demobilize 4
Duration = 92

Manpower
Trade Total Remark
Supervisor 1pax
Technician c/w Tools & PPE 1pax
Rigger Foremen c/w Tools & PPE 1pax
Fitter Foremen c/w Tools & PPE 1pax
Rigger c/w Tools & PPE 4pax
Fitter c/w Tools & PPE 6pax
Welder c/w Tools & PPE 3pax
Carpenter c/w Tools & PPE 6pax
Civil Worker only for 2 weeks
Bar Bender c/w Tools & PPE 6pax
Semiskill c/w Tools & PPE 6pax
Helper 4pax
TOTAL 39pax

Machinery & Equipment


Description Total Duration
4WD Pickup 1 3 Months
Mobile Crane 200ton 1 3 Days
Mobile Crane 25ton 1 3 Months
JCB 1 3 Days
Compactor 1 1 Day
Tipper Lorry 1 1 Day
Genset 100Kva 1 2 Months
DB 1 2 Months
JB 3 2 Months
Miller 2 2 Months
GTAW Welding Machine 6 1 Month
Diesel Dewatering Pump/Vibrator 2 7 Days
20ft Site Cabin Office c/w Aircond 1 3 Months
Canopy Rest Shelter 2 3 Months
Portable Toilet 2 3 Months
IBC Tank 4 3 Months

Service
Description Duration
Portable Toilet Desludge Daily
Freshwater Topup Daily
PMT Accomodation 4person 3 months
Roro bin every week 3 months
NDT
Scaffolding
Remark

JCB
JCB & Compactor
6m3 Low Grade Concrete

52m3 M30

200ton Mobile Crane

JCB

Days

r
Remark Daily Charge RM

Civil Worker only for 2 weeks


nt
Duration RM
3 Months
3 Days
3 Months
3 Days
1 Day
1 Day
2 Months
2 Months
2 Months
2 Months
1 Month
7 Days
3 Months
3 Months
3 Months
3 Months
Construction Bulk MTO
Description Total RM
6m x DN150 Sch.40 Seamless Pipe, A106
6m x DN300 Sch.20 Seamless Pipe, A106 5
6m x DN125 Sch.40 Seamless Pipe, A106 4
6m x DN100 Sch.20 Seamless Pipe, A106 1
DN150 x 150# Sch 40 WN Flange RFFE ASME B16.5, A105 4
DN300 x 150# Sch 20 WN Flange RFFE ASME B16.5, A105 4
DN125 x 150# Sch 40 WN Flange RFFE ASME B16.5, A105 6
DN100 x 150# Sch 40 WN Flange RFFE ASME B16.5, A105 2
DN300 x 150# Blind Flange RFFE ASME B16.5, A105 4
DN125 Sch.40 LR 90 Deg. Elbow ASME B 16.9, A234 6
DN125 Sch.40 LR 90 Deg. Elbow ASME B 16.9, A234
DN150 Sch.40 x DN100 Sch.40 Ecc Reducer ASME B 16.9, A234 2
12mm x 4m x 6m A36 Plate 1
6m HEA 100 Beam, A36 10
Angle
Angle
Cable Tray
Cable Gland
Cable
Gasket
Bolt
Anchor Bolt

Equipment
Description Total RM
Cooling Tower 3 RM91,000.00
GRP Sectional Water Tank 1
Supply Pump 1
On/Off Panel 4
DN 150 Strainer 1
DN 150 Valve 2
PSV 1
Consumable
Description Total RM
SMAW Welding Electrode
GTAW Welding Rod
Argon Gas
Oxygen Gas
Acetylene Gas
Diesel
Plywood
Freshwater
4" Cutting Disc
4" Grinding Disc