On 25.02.2014 due to heavy wind and rainfall some poles feeding supply to the Nardhana Substation had
fallen and now since May 2016 there are a lot of power failure from the MSEB feeder, due to these the plant
Nardhana
is suffering from heavy financial loss.
Abhay Cotex Pvt. MIDC, Phase Power The issue was closed on
1 MSEDCL 22.06.2016 08.07.2016- MSEDCL update: MSEDCL has put up 7 poles to resolve the issue and the power supply is Closed
Ltd. II, Sindkhed Connection 12.08.2016
regular. MAITRI to check with investor and verify.
Taluka, Dhule
20.07.2016- Investor update: The investor has confirmed that the power failure issue has been resolved.
The issue to be closed in the upcoming investor meeting.
Investor initially applied for Provisional Fire NOC at Directorate Of Maharashtra Fire Services Office, Mumbai
Plot No. on 3.05.2016. However, due to unavailability of the required supporting documents, the application was
1,5,6,10 and cancelled. Investor re-submitted the application on 19.05.2016 and a meeting was held for scrutiny on MAITRI to follow up with the
Maharashtra Provisional
2 Alfa Laval India Ltd. 14, Tal. 19.05.2016 1.06.2016. The department has recommended the release of payment chalan to pay the requisite fees. department to expedite the Open
Fire Services fire NOC
Khandala, However, investor has not yet received the payment chalan from the department. case.
Distt. Satara 02.08.2016- Department update: MAITRI has forwarded the application and reminder email to Fire services
department. The file is currently under process with Director, Maharashtra Fire Services for signature.
Investor visited Collector office, Raigad on 29.02.2016 to apply for permission to operate the Methanol tank
at the factory premises. They have already obtained permission from District Explosives department.
However, Collector officer informed the investor to obtain a NOC from Gram Panchayat first. When investor
approached the Gram Panchayat, they informed that, no such NOC exists with Gram Panchayat and hence no
such NOC will be given by them. Investor is asking for assistance.
29.03.2016-Investor update: Collector agreed to obtain MIDC NOC instead of gram panchayat NOC. MIDC has
Plot no N-
issued NOC and further, Collector has asked for NOC of SP and Tehsildar by writing to them According to MIDC,
32/1, Addl
13.05.2016 - Department update: The site visit is completed by the officer from Tehsildar office , the report Godown/warehouses are
Balaji Formalin Pvt. Patalganga Revenue NOC (to store
3 29.02.2016 on the same will be forwarded to the Tehsildar by the end of this week. allowed at the said plot. Jt. Open
Ltd MIDC, Near Department Methanol)
03.06.2016- department update: NOC is pending with Tehsildar and SP /local police office. CEO to look into matter and
Rasayani,
05.07.2016- department update the NOC is pending for Tehsildar signature. update MAITRI on the same.
Raigad
08.07.2016- IM Decision: Sicom to produce all files & the timeline taken by each officer with regards to this
case.
26.07.2016- SP office update: The file is sent back to Rasayani police station for queries. The issue is
pending at Tehsildar office and Police.
27.07.2016- MIDC update: MIDC has issued a letter to Dist. Collector that the said land parcel cannot be used
for warehousing purpose.
Page 1 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Investor has subsequently applied for Environment Clearance on 25.08.2015. EIA report has also been
submitted to the department however, Environment Clearance has not yet been granted.
09.10.2015- Investor meeting update: The case to be taken in the next SEIAA meeting.
14.01.2016- Department update-The proposal was recommended by SEAC-1 in its 115th meeting held on
03.12.2015. The proposal will be considered in ensuing meeting of SEIAA on 15.03.2016.
27.04.2016- Investor update: Compliance is requested from investor as per the minutes. Investor has made MAITRI to follow up with the
Balaji Formalin Pvt. Environment Environment
4 Raigad 25.08.2015 compliance too on 30.04.2016 department to expedite the Open
Ltd. Department Clearance
01.06.2016- Department update: The issue is discussed in 101th SEIAA meeting dated 10.05.2016. MOM case.
are awaited.
06.07.2016- Department update: Env Clearance is subject to compliance by the investor. The investor will
make compliance in some time.
21.07.2016- Investor Update: since the investor had already complied, he has submitted a declaration to the
SEIAA committee.
Due to delayed power supply received from MSEDCL - unit started production from 01.02.2008 (one month
after inaugural function of 01.01.2008). Accordingly Directorate of Industries granted EC for period
01.02.2008 - 31.01.2015. MAITRI to follow up with the
Daregaon
In July 2010, DI issued addenda to the original EC with change in effective period as 01.01.2008- department for the letter
Bhagyalaxmi MIDC, Directorate Eligibility
5 02.11.2015 31.12.2014. The investor has availed IPS claims from 01.08.2008 only and has submitted that they have intimating that changes in the Open
Rolling Mills Tal.Jalna, Of Industries Certificate
started the production from 01.02.2008 only. Eligibility Certificate will not be
Distt.Jalna
Investor is seeking for approval of IPC period as 01.02.20108- 31.01.2015 as mentioned in original EC. considered.
20.05.2016- IM decision: According to the department, changes in the Eligibility Certificate will not be
considered, hence the department to intimate the investor and after that, MAITRI to close the case.
The investor has made an online application for Consent to Boiler fuel change for the existing factory in
Cadbury India Survey no.
Dist.Pune. The application was filed through online at MPCB which is under process with the department
Limited (Mondelez 532, 533, Consent to
(reference no. MPCB-CONSENT-0000003682) The issue was closed on
6 India Foods Private Talegaon, MPCB Boiler fuel 28.04.2016 Closed
08.07.2016- MPCB update: The case will be taken up in CAC meeting 12.08.2016
Limited -MIFPL) Induri village, change
15.07.2016- Department update: The issue was discussed in the CAC meeting held on 08.07.2016 and the
(Expansion) Taluka Maval
consent has been recommended, hence the issue to be closed in the next investor meting.
Page 2 of 35
Maharashtra Industry Trade Investment Facilitation Cell
A sub-station of MSEDCL is located at Plot no A-1 an A-2 of investor's land. The unit applied to MSEDCL for
shifting the sub-station to MIDC layout in 2011with undertaking to bear the entire cost of shifting it.
13.09.2012 - Joint meeting between MIDC, MSEDCL and unit update: MIDC and MSEDCL agreed to shift the
sub-station. Joint visits held on 2.11.2013 and 12.11.2014. Further, MSEDCL accorded administrative
approval by its letter dated 30.09.2014 for shifting of Sub-Station. The shifting cost will be borne by the
investor.
MSEDCL had requested MIDC to give land on free hold/ 999 years lease since the land of existing substation
was given on freehold. The investor has agreed to give free land (of equivalent area 10,000 Sq. mtr) to MIDC
for the said purpose vide letter dated 24.07.2015. Hence, the request to transfer cummin's land to MSEDCL
and MSEDCL existing land in name of Cummins is pending. MIDC has informed MSEDCL on 9.12.2015 about
policy of lease for 95 years only. The file is under process with
Phaltan, MSEDCL/ Shifting of Sub 11.12.2015-MIDC update: MIDC has informed MSEDCL that it will renew lease tenure for 95 years each time legal of MSEDCL, after which
9 Cummins 11.08.2011 Open
satara MIDC station without any financial implications till 999 years. Issue pending with MSEDCL. the agreement will be signed
10.03.2016- MSEDCL Update: MSEDCL has approved the proposal by MIDC for renewable 95 year lease between MSEDCL and MIDC.
17.03.2016- MSEDCL update: MSEDCL has issued instruction to SE Satara to carry out the shifting work, at
cost of unit.
01.04.2016- MSEDCL update: Cummins to give the land parcel for shifting of substation in coordination with
MESDCL and MIDC.
14.06.2016- MIDC update: Draft agreement with suggestions is forwarded to MSEDCL.
08.07.2016- IM Decision: According to MSEDCL, the plot allotment letter is not given by MIDC.
Cummins to earmark the land for substation and then MIDC can transfer the plot to MSEDCL. MAITRI to
inform Cummins to finalise the land details.
21.07.2016 - Department update: The draft agreement is under process with MSEDCL, Legal.(SE Civil ,
baramati)
Page 3 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Tehsildar office has issued royalty notice to the unit. Investor replied to Tehsildar, Ambernath office on
13.01.2016 that they have used soil for levelling purpose of the same plot and as per the GR no. GKN –
10/0307/P. No 57/KH dated 07.01.2011, Royalty is not applicable in MIDC area if the same soil is utilized for
N-71,ANAND The department to resolve the
levelling purpose. Hence Investor has requested to cancel the said notice.
NAGAR, issue at the earliest, if not,
Revenue 09.03.2016: MIDC update: MIDC has written to Tehsildar about non applicability of royalty in this case.
MIDC, the concerned officer with
10 Digichem Industries Department/ Royalty 13.01.2016 20.03.2016- Investor update: Investor met Tehsildar as instructed by DC sir but Tehsildar is asking to Open
AMBERNATH- whom the file is pending will
MIDC approach HO, Ulhasnagar. Investor is requesting for resolution. DC Industry has written a letter to Collector
EAST, DIST- have to attend the next
for the issue
THANE investor meeting at MAITRI.
02.05.2016- Investor update: Investor has appealed at SDO office.
08.07.2016- IM Decision: The department to resolve the case within a month, if not the concerned officer
with whom the file is pending to attend the next investor meeting at MAITRI.
This project of e-waste recycling is financially and technologically supported by (NEDO) a department of
Government of Japan. The developer has left the project site without completing the basic infrastructure like
road, electricity, water supply, drainage system at the complex undertaken by him. Hence the investor is
seeking intervention from the department to complete the approach road and other basic infrastructure so
that the project can be started at the earliest.
09.10.2015- Investor meeting update: MAITRI to share the DO letter in name of DC(I) along with the copy of
the FIR to be sent to collector(Thane) and Commissioner Police Thane.
07.11.2015 update from department- DC(I) has talked to collector thane about providing support.
Department to look into the matter and update MAITRI on the same.
20.01.2016- Investor update; Collector has written letter to Tehsildar to issue permission in favour of MAITRI to share the issue
investor to construct the internal road (by investor). Investor will make application to Tehsildar accordingly details with DC (Industries)
05.02.2016- Investor update: Collector has instructed office of land records on 30.11.2015 to demarcate explaining the issue, after
Eco Recycling Bhiwandi, Revenue
11 Infrastructure 27.11.2015 internal road layout as per plan approved at time of NA permission sanction and once the demarcation is which DC (Industries) to send a Open
Limited Thane Department
done, the land to be transferred to gram panchayat and investor to be permitted to carry out infrastructure DO letter to Collector, Thane
works / approach road development at his own cost. Once investor develops the road, it will be handed over to consider demarcation of the
to gram panchayat. Investor has made application for demarcation of land on 02.02.2016. approach road to the unit.
07.03.2016- Investor update: The investor has obtained demand note for demarcation survey. He has made
the payment
02.05.2016- Investor update: The demarcation survey is scheduled on 19.05.2016.
31.05.2016- Investor update: Investor was asked to comply with building plan approval before carrying out
demarcation survey. He has submitted the same. Investor has complied with the same.
13.06.2016- Department update: Collector office is asked a update on the issue by PS Revenue. Collector
office is awaiting report from Bhiwandi LR office.
30.06.2016- SLR Update: Field visit is done. SLR has asked the investor to submit drawings showing the
road for demarcation.
Page 4 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The investor made an application on 27th November 2012 to obtain NOC to store petroleum class B at Gat no
1142 to 1149 to Hon'ble District Collector.
Collector office has requested four departments namely- (1) Superintendent of Police, Satara (2) Zilla
Parishad, (3) District Rehabilitation officer and (4) Town Planning, Satara (5) Dy Director, DISH (6) District
Health Department and (7) MSEDCL to submit a report on the same (vide DC/MAG/3/Explo/NOC/SR-16/12
dated 30th November 2012.) However, no reply has been received by Collectorate from these department till
date. NOC is yet to be received by the investor.
The 3 NOC out of 7 are received - namely DISH, .District Health Department and MSEDCL.
25.02.2016- Investor update: Investor has shared application written to remaining 4 departments
Gat no 1142 03.03.2016- ZP update: Exe. Engg, ZP has requested for compliance from the investor. , which investor has
It has been recommended 2
to 1149, submitted.
Finolex J Power Revenue NOC (to store days back. MAITRI to confirm
13 Shirval, Tal. 27.11.2012 23.03.2016- Investor update: Investor has received, till date, 6 NOC from above including SP NOC. Only NOC Open
Systems Pvt. Ltd Department petroleum) with the investor after which
Khandala, from ZP is pending.
MAITRI to close the case.
Dist. Satara 04.04.2016- Investor update: Investor has complied for ZP NOC. Further, Collector has requested for
Tehsildar, Khandala's NOC. Hence, 2 NOC are pending as on date - ZP and Tehsildar.
16.05.2016- Investor update: ZP has asked the investor to submit the details of the unit in a particular
format obtained from the PWD office.
30.05.2016- Investor update: Investor has received NOC from ZP; NOC from Tehsildar is pending.
08.07.2016- IM Decision: The department to resolve the case within a month, if not the concerned officer
with whom the file is pending to attend the next investor meeting at MAITRI.
22.07.2016 - Investor Update: Since all the NOC's are obtained by the Collector, the file is under process
with the Collector.
04.08.2016- Investor update: Investor has submitted the compliance to collector office.
Page 5 of 35
Maharashtra Industry Trade Investment Facilitation Cell
11.03.2016- Investor update: The development plan by PMRDA has two roads passing through unit's plot,
inside MIDC. For the said issue, Investor has requested to delete these two roads from the plan. MIDC has
provided its comments to PMRDA that it does not have objection with deletion of the roads. PMRDA to
proceed further.
22.03.2016- PMRDA update: PMRDA has forwarded the proposal to UDD for next course of action and
Village -
decision. MAITRI to follow up with the
Nanekarwadi, Building plan
15 Force Motors Ltd UDD 12.03.2007 13.04.2016- IM Decision: Investor to meet Jt Secy on 13.04.2016 and PS UDD. Further, investor was asked department to expedite the Open
adjourning to approval
to write a note to DC (I) and MAITRI, which is to be forwarded to PS UDD. case.
Chakan MIDC
09.05.2016- Department update: Assistant Town planner, Pune have forwarded the file with their
comments to Under secretary, UDD
22.06.2016- Department update: The notification is issued to delete the said two roads from the plan - in
public domain to invite suggestion/ opposition from public at large.
08.08.2016- Department update: The file is under process at Town planning Office, Pune
Investor had made an application to avail state incentives under PSI (2007) for large units. But due to
prolonged delay in getting land from MIDC, their investment period is almost passed. The investor has
therefore applied (on 4th May 2015) to consider incentives benefits as per PSI 2013 instead of 2007 on the
basis of merit of case.
August 2015- Update from DI:
The department is examining the case.
27.10.2015- DI update: The said issue was discussed in the State Level Committee constituted under the
Package
Givaudan India Pvt. Directorate Chairmanship of PS(Inds) for PSI. The minutes of meeting is approved by Government. The case will be The issue was closed on
16 Shirpur Scheme of 04.05.2015 Closed
Ltd. Of Industries scrutinised by DI as per the reasons submitted by the unit for delay in the project and decision will be taken in 12.08.2016
Incentives
the case.
19.05.2016- DI update: GR is issued. So the issue may be closed
08.07.2016- IM Decision: The issue to be closed once GR is shared with MAITRI. MAITRI to close the case
along with referred GR
09.08.2016- Investor update: Investor is asked by department to apply under PSI 2013. MAITRI has closed
the case
Page 6 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The investor has requested MIDC for extension of time limit for BCC. The investor has made an application to
MIDC for amount payable under Udhyog Sanjivani scheme. The scheme is ending on 31. 01.2016 and hence
investor is seeking early response from MIDC.
11.01.2016- MIDC update- Investor has applied for it. MIDC will check eligibility of the unit for the scheme
14.01.2016- Investor meeting decision: MIDC to give an hearing to the investor and take the decision.
29.01.2016- investor update: According to investor, Dy CEO MIDC has concluded to charge pre-payment
charges from July 2013 to production date (May 2014) and will waive 50% under Udhyog Sanjivani. MIDC will
D-2 Kagal inform the amount to be paid as per discussion soon. The file is under process with Jt CEO, MIDC
Hatkangale 22.02.2016- MIDC update: The file is under process with CEO, MIDC
Star 10.03.2016- MIDC update: the file is under process with RO, for issuance of demand note
Ind. Area, 11.03.2016- Investor update: Demand note issued. Investor has shared the copy of the same with MAITRI.
Ghatge Patil The issue was closed on
17 Post Talande, MIDC BCC Extension 17.12.2015 29.03.2016- Investor update: RO, MIDC is saying the amount given by MIDC is incorrect. Hence, Investor is Closed
Industries Plant II 12.08.2016
Tal. requesting Dy CEO to intervene.
Hatkangale, 12.04.2016- MIDC update: MIDC is re-verifying the case.
Dist. 05.05.2016 - Investor Update: MIDC has issued a letter that Udyog Sanjivani has been expired and the last
Kolhapur demand note issued stands good.
12.05.2016 Investor update: Investor has made a representation on the last letter issued by MIDC and is
awaiting a hearing from Jt. CEO, MIDC
18.05.2016- MIDC update- MIDC has issued demand letter to investor to pay as per previous amnesty
scheme.
20.05.2016- IM decision: MIDC to look into the matter to resolve the case, simultaneously the case to be
referred to Addl. Director, Industries
01.06.2016- Investor update: The file is under process at Dy CEO for final decision.
05.07.2016- MIDC update: MIDC has decided to maintain their stand on earlier decision. MIDC to issue letter
to investor in this regards, then after, MAITRI to close the case.
10.08.2016- MIDC update: MIDC has issued the demand note for BCC extension, hence the issue to be
closed at the upcoming investor meeting
The investor is requesting for Government Survey to be done for Survey No. 24, 28 & 39 of Village Vadval,
Godrej & Boyce Village Tal. Khalapur for the Mega Project. The fees of the government survey too was paid on 13.05.2016
Mfg. Co. Ltd. Vadval, Government 01.07.2016- Investor update: The department has circulated another letter asking the concerned parties to The issue was closed on
18 Revenue 13.05.2015 Closed
(Phase I/ South Tambati, Ta. Survey be present for government survey. 12.08.2016
block) Khalapur 25.07.2016 - Investor Update: Investor has confirmed that survey is completed and MAITRI to close the case
in the next investor meeting.
Page 7 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The investor has made an application on 3rd September 2015 and the investor is still awaiting the site
inspection.
Godrej & Boyce Village Revenue 11.09.2015- Investor meeting update: MAITRI to share the application of the investor with forest
Mfg. Co. Ltd. Vadval, department/ Tree Cutting department (for scheduled trees) and with revenue department (for non-scheduled trees) and follow up to The issue was closed on
19 03.09.2015 Closed
(Phase II/ North Tambati, Ta. Forest Permission expedite the process. 12.08.2016
block) Khalapur Department 09.10.2015- Update from department- The investor to comply with relevant documents.
25.07.2016 - Investor Update: Investor does not want to perceive the case further, hence case to be closed
in the next investor meting
With reference to meeting held on 06.08.2015 under chairmanship of Hon. Chief Minister the investor has
made an application to PS(UDD) on the following points:
1) Increase in FSI to 1.0 for Industrial Zone.
2) No Height Restriction for industrial sheds and other buildings in industrial Zone.
3) Reduce the mandatory open area to 15% in Raigad district for industrial Zones
12.01.2015- Investor update- Investor has re-submitted the application copy to PS, UDD on 06.01.2016.
14.01.2016- Investor meeting decision: The department to resolve the case on top priority and MAITRI to
send the report to DC(I) every week on the progress of the issue.
21.01.2016- Investor update: Investor met ADTP, Pune to discuss their proposal. Pune TP office has
forwarded the letter for remarks of Alibaug and Konkan Office. Pune TP office has forwarded the letter for
Godrej & Boyce Village
remarks of Alibaug and Konkan Office. The investor is meeting Jt Director, TP on 01.02.2016. UDD will
Mfg. Co. Ltd. Vadval, The issue was closed on
20 UDD FSI 1.10.2015 share FSI circular with the unit for further reference. Closed
(Phase II/ North Tambati, Ta. 12.08.2016
01.02.2016- The investor also met Jt Director, TP. The file is under process at JT Secy, UDD. The investor to
block) Khalapur
meet him.
10.03.2016- Investor update: The file is under process with PS UDD
24.03.2016- Investor update: The file is under process with Hon'ble CM. (The file is sent to his desk without
signature of PS UDD - as updated via field visit)
18.05.2016- Department update: The file is under process with Jt Secy UDD
19.05.2016- Investor update: The approval is given by the department and the investor is awaiting the
notification to be issued
13.06.2016- Department update: TP to go ahead with remarks given by ground level offices.
25.07.2016 - Investor update: Investor has confirmed that the unit has obtained the FSI=1.0 and MAITRI to
close the case in the next investor meeting
Page 8 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Investor is seeking permission to take 0.4 MLD water from Patalganga River in Dhamni, Ta. Khalapur. He has
submitted an application to Irrigation Department for grant of approval but awaiting the approval till date.
The site inspection was done on 8th July 2015 and the file is under scrutiny with sub div office, Karjat.
29.09.2015- Update from department: CE, Konkan region Mumbai is intimated the new proposal as per latter
dated 21.9.2015.
27.10.2015- WRD update: the file is under process at CE, Konkan region
21.12.2015- Investor update- Investor has applied again to the department with necessary forms and The file is under process with
affidavit. The file is with CE, Konkan for process. The investor has revised the requirements to 0.8 MLD ACS for cabinet note.
Godrej & Boyce Village
Water water and complied accordingly The case to be referred for
Mfg. Co. Ltd. Vadval, Water quota
21 Resources 18.06.2015 12.01.2016- investor update- The investor has made compliance with the department. The Karjat Office has CM's meeting highlighting the Open
(Phase II/ North Tambati, Ta. sanction
Department recommended the same to Kolad region office. process of water sanction (as
block) Khalapur
29.02.2016- Field visit update: The file is under process with Executive Engineer, Irrigation Dept., Fort office, each file is forwarded to
Mumbai cabinet individually)
11.03.2016- Department update: The case to be presented in the cabinet by the end of March 2016.
07.04.2016- WRD update: The file is sent back to regional office for queries.
23.05.2016- Investor update: Investor has made compliance at Karjat Office, the file is forwarded to Kolad
office on 04,06.2016. The file is under process with CE Office (WRD, Fort)
06.08.2016- Department update: The file is forwarded to finance department after compliance is made by the
investor.
The investor has submitted the proposal for NA and Building construction permission at the Collector Office ,
Alibaug
09.02.2016 - The file has been forwarded to Town Planning Office , PWD, Tehsildar, Zilla Parishad for their
NOC from Collector's Office .
26.02.2016- Investor update: Investor has shared support documents & applications with MAITRI. DIC has
asked report/NOC from TP, PWD, Health dept. and Tehsildar. TP has asked for compliance on 04.02.2016.
03.03.2016- Investor update: Collector has forwarded the file to TP, PWD, Tehsildar and ZP for their NOC
MSRDC is notified as Special Planning Authority for the region and hence, this matter will lbe forwarded to
NA MSRDC. However, in absence of ready infrastructure and policy in place for MSRDC, Investor is requesting to
Godrej & Boyce Mfg. Village Revenue MAITRI to follow up with the
permission; nominate MIDC as planning authority for industrial units. He is meeting PS industries for the issue.
22 Co Ltd (Dhamni Dhamni, Tal. Department / 14.01.2016 department to expedite the Open
building 02.05.2016- Investor update: Investor is to submit proposal to MSRDC
Pump house) Khalapur MSRDC case.
permission 03.05.2016- Investor update: The investor has submitted two proposals for NA & Building Construction
Approval on 31.03.2016
20.05.2016- IM Decision: The NA permission will come from the Collector; whereas, Building plan will
approved by MSRDC. As this plot is of 3 acre falling under recreational zone, MIDC to examine if they can be
the planning authority for such private land and MIDC act can be implemented on it or not. The investor to
get in touch with the Special Planning Authority of MIDC.
The collector has written a letter to various department - PWD, ZP, Forest department- for their NOC. Till
05.07.2016, none of NOC is received by Collector.
08.07.2016- IM Decision: For building plan approval, MSRDC is the only approving authority.
Page 9 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Page 10 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The Consent to Operate granted to the unit was expired on 30.06.2015 and the investor has already made
an application for renewal 2 months back which is still pending for approval.
14.01.2016- Investor meeting decision: MAITRI to follow up with the investor for the copy of the application,
Plot no. c- if applied and also follow up with the department for updates.
122, c-154, 15.01.2016- Field visit update- for the balance capacity Technical Secretary, MPCB advised investor to apply
TTC Industrial Consent to for 2000 Tons/A respectively as it will be treated as an expansion
Hindustan Platinum The case to be taken up in the
26 Area, MIDC MPCB Operate- 04.04.2016- MAITRI has shared granted consent to operate renewal (amalgamated) for 2 years. Open
(make in India) next CC meeting
Pawane, Navi renewal But the investor want to pursue the case, since according to him, the consent in red category are to be issued
Mumbai. Dist. for 5 years.
Raigad 13.04.2016- IM decision: The investor to represent the case with MPCB and share application copy with
MAITRI for further process. meanwhile, the original issue is resolved hence MAITRI to close the case.
08.07.2016- Investor update: Investor has applied for change in consent on 03.06.2016 -for a period of 5
years instead of 2 years. MAITRI has shared the same with MPCB.
In May 2011 the investor was allotted 11 different plots for expansion, but due to Comprehensive
Environmental Pollution Index (CEPI) being high in Navi Mumbai, MPCB had put all expansion of new
The amalgamation and the
projects on hold. After certain modifications in the current buildings the investor obtained the BCC in 2014.
Plot no. c- time limit extension is
Since than the investor is following up with MIDC to amalgamate the remaining plots which is still pending
122, c-154, approved by MIDC. According
with the department.
TTC Industrial to PS(Industries) MAITRI not to
Hindustan Platinum amalgamation 12.04.2016- MIDC update: Investor to apply for BCC extension first. then MIDC will proceed further for
27 Area, MIDC MIDC persue the case further with Closed
(make in India) and approval amalgamation.
Pawane, Navi regards to the payment
17.05.2016 - MIDC update: The file is under process with Jt. CEO MIDC.
Mumbai. Dist. demanded, hence the issue
14.06.2016- MIDC update- Amalgamation is approved and the time limit extension is approved for 60 days.
Raigad was closed in the investor
Written communication to the investor is pending in this regards
meeting held on 12.08.2016
01.07.2016 - Investor Update: The investor has made the payment for time limit extension under protest.
Page 11 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The investor is currently paying 1.5 to 2% LBT, which his competitors in other Indian states are not liable to
pay. The investor was already exempted from cess before LBT was introduced, hence the investor is
requesting exemption from LBT on line of cess exemption; to least at LBT @ 0.1% (as applicable to precious
metals). The labour charges are below 2% of the value of metal and hence paying LBT on job work makes
manufacturing in Navi Mumbai a loss making proposition.
14.01.2016- Investor meeting decision: MAITRI to follow up with the investor for the copy of the application,
if applied and also follow up with the department for updates.
Plot no. c-
11.02.2016- Field visit update: as per NMMC, the unit is liable to pay LBT being a manufacturing unit.
122, c-154,
Further, all units having exemption from CESS are also paying LBT and similar decision is application to
TTC Industrial
Hindustan Platinum Hindustan platinum as well. However, when investor shares his documents with MAITRI, it will have a The issue was closed on
28 Area, MIDC NMMC LBT 21.05.2013 Closed
(make in India) detailed discussion again. 12.08.2016
Pawane, Navi
25.02.2016- Investor update: Investor has shared documents with MAITRI. Investor is awaiting
Mumbai. Dist.
Commissioner, NMMC's site visit to his unit.
Raigad
16.05.2016 - Department update: As the Commissioner is transferred. field visit is postponed
05.07.2016- Department update: Newly appointed Commissioner is looking into matter. He may not visit the
site but will decide based on internal discussion.
19.07.2016 - Field visit update: Hearing conducted by NMMC on 18.07.2016. Accordingly investor is submit
the representation & the documents to the department by 20.07.2016
22.07.2016- NMMC update: NMMC has issued minutes of hearing to the investor, according to which, his
request cannot be considered and the investor is to pay LBT as per rules. MAITRI to close the case.
Currently on imports the investor is paying 0.1% stamp duty on assessable value plus custom duty
Plot no. c-
components on all imports. This 0.1% levy account for large amount of money given the value of precious This issue was discussed
122, c-154,
metals and it impacts on the price competitiveness as the competitors from other Indian states are not liable during the meeting. The issue
TTC Industrial
Hindustan Platinum Revenue to pay the same. is a policy matter and hence,
29 Area, MIDC stamp duty 04.10.2011 Closed
(make in India) Department 14.01.2016- Investor meeting decision: MAITRI to follow up with the investor for the copy of the application, out of the purview of the
Pawane, Navi
if applied and also follow up with the department for updates. MAITRI. The issue was closed
Mumbai. Dist.
08.07.2016- Investor has shared the applications and documents, which are forwarded to Revenue on 12.08.2016
Raigad
department as well.
Page 12 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Page 13 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Investor is facing extortion from local people for giving them contracts. Since investor is not fulfilling their
demand, the local people are now demanding to close the unit stating the noise from unit is disturbing the
nearby school.
Although, the investor has supported the school by providing computer, clean drinking water and by repairing
Village
the school building.
Honad,
Investor has requested Dist. Collector to resolve the issue. He has also proposed to run the unit during non- MAITRI to close the case.
Jyoti Steel Shilphata, Revenue
33 Local issues 22.02.2016 school hours as well as to install sound proof material and air conditioner in six classrooms of the school. The The case to be taken up for CM Open
Industries Khopoli, Dist. Department
investor has also shown willingness to find a different location and relocate the school. meeting.
Raigad
11.03.2016- IM decision: PS has written a letter to the collector in order to look into the matter to resolve
the case.
MPCB too had visited the unit to check noise levels/pollution. The case to be presented in CM meeting. The
unit is currently working in non-school hours only. It was suggested to the unit that it may continue to work
as per norms and if school is creating issues, he may approach MAITRI.
Page 14 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Page 15 of 35
Maharashtra Industry Trade Investment Facilitation Cell
NHAI is executing project of widening of Panvel-Indapur stretch on NH-17 as 4/6 laning (84 kms length). For
this, NHAI is acquiring the land alongside the NH 17. The unit has received an acquisition notice for its 16000
Pipe Nagar, SQM land - for 4/6 laning and a truck lay bay area.
Village Sukeli, The investor is requesting NHAI (1) not to demolish the structures on the said land parcel (which is not
Maharashtra N.H. 17, Hold on land required for 4 laning of highway) (2) shift the location of truck lay bay to nearby land parcel. The investor has The issue was closed on
38 NHAI 07.01.2016 Closed
Seamless B.K.G. Road, acquisition proposed to provide an alternate land for truck lay bay. 12.08.2016
Tal. Roha, 01.3.2016 - Investor Update: The investor has also approached the high court, on which the high court has
Dist. Raigad put a stay on NHAI activity till 13.04.2016 (next hearing)
20.07.2016-Investor update: the issue is taken to the High court by the unit and hence, the matter is sub
judice. MAITRI to close the case in the next investor meeting.
Page 16 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Unit was issued mega offer letter dated 15th November 2011 with the condition to complete the investment
within 5 years. However due to delay in getting environment clearance for phase 2 (Application Date -
D-32,
February 2013) investor is requesting for extension of investment period by 2.5 years.
Additional Industries & Investment
Matsyodari Steel & 09.12.2015- Department Update- the file is put up to PS Industries - to be referred to HPC afterwards The issue was closed on
40 MIDC, Mining Period 03.11.2015 Closed
Alloys Pvt Ltd. 22.07.2016 - Field visit report: The proposal has been accorded but awaiting for the letter issued by the 12.08.2016
Industrial Department Extension
department
Area, Jalna
13.07.2016- Department update: The extension is granted and investor has confirmed the same. MAITRI to
close the case.
Page 17 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Unit was issued mega offer letter dated 15th November 2011 on the basis of Investment amount 110 Crore
and 550 employment generation.
D-32,
Now Investor requesting to change the status of Mega (Investment) to Mega (Employment)
Additional Industries &
Matsyodari Steel & Change in 09.12.2015- Department Update- the file is put up to PS Industries - to be referred to HPC afterwards The issue was closed on
41 MIDC, Mining 03.11.2015 Closed
Alloys Pvt Ltd. mega status 17.05.2016- department update- the proposal is to be discussed in HPC meeting of 26.05.2016 12.08.2016
Industrial Department
22.07.2016 - Field visit update: The file will be referred to the cabinet
Area, Jalna
13.07.2016- Department update: DI has issued a letter recommending change in mega status and
investment period extension by 2.5 years. The issue is closed.
In 2013, the unit was given mega project status on the basis of proposed employment. However, due to the
delay in obtaining land from MIDC and Name change procedure of the company by MIDC, the investor is
unable to implement the project within stipulated time frame. Hence the investor is requesting for the
Extension of extension in setting up the Mega Project. The department to look into
five star
42 Melting Centre MIDC Investment 17.11.2015 13.01.2016- department update- the name change process is completed by Industries dept. (for offer letter) the matter and update MAITRI Open
MIDC, Kagal
Period and the case is being considered for HPC on the same.
17.07.2016- Department update: The file is forwarded to MIDC for their inputs on the case due to delay in
Name change process.
The investor applied for the approval of lifting of water from Palkhed Dam- to Irrigation Department. The
approval is awaited.
27.10.2015- WRD update- Investor has filled online application on 1.10.2015. It is under process
3.11.2015- Investor update: after a joint meeting between MIDC, MITC, irrigation dept. on 3.11.2015,
Irrigation dept. has written to investor for applying through MIDC Dindori. MIDC dindori is given reserved
quota of 0.11 unit water, which is not sufficient for MITC's requirement of 0.242 units. unit is directed to use
water supply to nearby MIDC Talegaon, having reserve water quota from Palkhed dam of 2.51 unit. However,
water supply will be available once MIDC Talegaon will make the payment.
20.11.2015- Investor update: MIDC has written a letter to WRD mentioning that payment for MIDC Talegaon
water supply to WRD is under process and has requested WRD to grant approval to MITC to construct jack WRD Mantralaya has issued
Water
Plot no B1, well and structure in the dam. clarification on commitment
MITC Rolling Mills Resources Water quota
43 Palkhed road, 17.10.2013 11.03.2016- IM decision: MIDC to make payment to Water Resources Department in order to expedite the charges to MIDC. Open
Pvt. Ltd. Department/ sanction
Dindori issue. The case to be referred for CM
MIDC
23.03.2016- MIDC update: MIDC has requested WRD to share break up of charges to be paid and to waive off meeting.
the interest charges.
01.04.2016- field visit update: Exe. Engg Palkhed dam has reverted to MIDC with break up of cost and has
approved the construction work to be done by the unit.
12.04.2016- MIDC update: WRD is not sure about chargeability of "water commitment charges" to MIDC.
Hence they are seeking clarity from WRD
05.05.2016- Department update: The file related to commitment charges is sent to WRD, Mantralaya for
clarifications and the investor has already started the Jack well construction.
09.08.2016 - Field visit update: WRD Mantralaya has issued clarification on commitment charges, but
MAITRI yet to receive the copy of the same.
Page 18 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The unit was granted conditional NOC by MIDC on 19.01.2012 to lay 22 KV HT cable from 400 KV substation
Plot No:- B-
(Plot No. P-10) Phase-III to "MVML supplier park" (the mail client of Mungi engineering). According to this
12,Chakan
NOC for laying NOC, MIDC did not have possession of land (from point E to F) of approx. 350 mtr and thus, midcap did not MIDC to look into the matter
Industrial
44 Mungi engineering MIDC Electrical 12.12.2011 granted NOC for this stretch. All works of cable laying is done by the unit except for the said stretch. Investor and update MAITRI on the Open
Area, Phase -
Power cable is requesting for NOC of 350 mtr land now. same.
II ,Tal-Khed,
28.03.2016- MIDC update: Dy CEO2 to be approach for resolution
Dist.- Pune
18.05.2016- MIDC update- DY CEO2 to make the field visit by 20.05.2016
The investor applied for 600KL/day water supply, which is pending with the department.
August 2015- Update from the department:
Infrastructure of water supply distribution is not yet provided near plot of the investor. The tenders for
intermediate water supply scheme are invited. Once the work of distribution line is laid, the department will
issue sanction letter.
24.08.2015- update from MIDC- tenders are floated
11.12.2015- MIDC update- The tender work will be completed in April 2016. hence the issue to be reviewed
New Holland Fiat The issue was closed on
45 Chakan MIDC MIDC water 08.01.2014 in May 2016 Closed
(India) Pvt. Ltd. 12.08.2016
20.05.2016- MIDC update: The Pipeline work is completed the department to extend the connection to the
unit by 05.06.2016
The investor has not received the water supply as on 05.07.2016
05.07.2016- MIDC update: Demand notice for water connection charges has been issued dated 30.06.2016.
Copy not yet shared with MAITRI. Outward number: C06384.
18.07.2016- Investor update: The investor has made the payment for water connection.
09.08.2016- Investor update: Investor has received the supply and requested MAITRI to close the case.
Page 19 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Investor had applied for NOC from District Collector office, on 1st March 2012. The investor was informed in
2015 that he has to comply with NA permission for want of NOC. The NA permission is not given to the
investor and hence, the issue is still pending.
11.09.2015- Investor meeting decision: Once the issue of NA permission is resolved, revenue department to
look into the matter The department to resolve the
Lote
NOC (for 31.10.2015- Investor update: investor has submitted NA permission required for further process to obtain issue at the earliest, if not the
Ghanekhunt,
PDP Gas & Chemical Revenue storage of NOC concerned officer with whom
47 Tal - Khed 01.03.2012 Open
Pvt Ltd. Department Anhydrous 15.12.2015- Department update: collector has raised some inquiries since the application is made is 2012, the file is pending to attend
Dist.-
Ammonia) hence a site visit will be made from collector office. Post which, Collector will decide further to issue the NOC the next investor meeting at
Ratnagiri
20.12.2015- Department update- SDO has completed the site visit and submitted the site visit report to Dy. MAITRI.
Tehsildar.
01.02.2016- Department update: Dy Tehsildar has received the report. The site visit will commence in this
week and they will update MAITRI on the same.
08.08.2016- Department update; The file is forwarded to Tehsil office for compliance.
Investor applied to the CEO (MIDC) for the Integrated Industrial Area Declaration on 24th January, 2014. The
IIA policy will be published
Pearls Sana Industries & Integrated MIDC Steering committee has discuss the proposed IIA Project & have kept the application on hold until
shortly. In the meanwhile MIDC
48 Infrastructures MIDC Thane Mining Industrial Area 24.01.2014 acquisition of land by the investor. Open
(IIA) committee will be visiting
Developers Department application Update from the department:
the site for screening.
MIDC to take decision once the IIA is notified by Industries Department
Out of total 27 acres required for the proposed project investor has already acquired 22 acres. Remaining 5
acres land is required for railway siding which is owned by multiple persons, after persuading with owners for
more than 2 years, investor is finding it difficult to bring them to conclusion in spite of offering a
Kangaon
compensation way above the market rate. Now, Investor claims that the owners of the above mentioned 5
Village,
Penna Cement Land acres land are either ill-guided or have the fraudulent motives as their approach towards their proposal is The issue was closed on
49 Daund 03.05.2016 Closed
Industries Ltd Acquisition always inconsistent and ambiguous. Investor has already invested heavily in this project (based on the 12.08.2016
Taluka, Pune
promise given by owners), assuming complete land will become available. At this stage, it is
impossible for investor to move out from the proposed site, given that it will lead to irrevocable financial loss
to the company.
MAITRI has closed the case based on 20.05.2016 IM. MAITRI do not take up cases of land acquisition.
Investor applied for Building completion Certificate to District Collector, Raigad. A letter was sent by the
collector to Tehsildar, Khalapur and Town planning department asking their comment on 26.10.2015.
However, reply not yet received from these two departments.
Plot no 59, District Building MAITRI to follow up with the
Polygomma 27.05.2016- department update: Town planning department has made field visit. the report is awaited.
50 Ajivali Khopoli- Collector, completion 22.09.2015 department to expedite the Open
Industries Pvt. Ltd 08.06.2016- Department update: A report from TP dept. is forwarded to Tehsildar office.
pen road, Raigad Certificate case.
21.07.2016- Department Update: The investor to comply with relevant documents
02.08.2016- Investor Update: The investor has complied with relevant documents and ADTP to do a field
visit shortly (date yet to decide).
Page 20 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Application was submitted on 16.04.2015. Investor took over a part of the land and products from an existing
company, which already had consent to operate. MPCB kept denying the CTE on various grounds even after
investor applied for ZLD; received legal opinion from MPCB legal cell that the party should be granted the
consent and; even after investor submitted a letter from MIDC stating that they have given permission for
the project.
Investor is claiming that the process does not involve any hazardous chemicals, it only involves inorganic
salts and the effluent also contained easily separable inorganic salts of benign elements. Investor is proposing
to manufacture catalysts which are very important for green processes, but not available to Indian
The file under process with the
A-94, MIDC companies because of its strategic importance.
legal wing, department to look
Phase 1, 11.5.2016: department update: The Consent was issued under Green Category which is not serving the
Consent to into the matter and update
52 Procat tech LLP Dombivali MPCB 16.04.2015 purpose of the investor. MIDC has abolished the policy to issue NOC (as per TA's update). Open
Establish MAITRI on the same.
East, Thane 25.06.2016- MPCB update: MPCB has shared the court order to MIDC on 09.06.2016.
The Case to be taken up for
05.07.2016- MIDC update: MIDC has written letter to Investor and MPCB that MIDC is not a competent
CM's Meeting.
authority to give any such NOC nor have any authority to judge performance of treatment of effluent
generated by units.
08.07.2016- IM Decision: The supreme court has stashed high court order- Hence, MPCB's request to obtain
MIDC NOC is not required anymore. NGTs decision is prevailing that unit with ZLD should be granted consent
to establish. MPCB to resolve the issue at earliest. MIDC has no role to play. Investor to share all support
document with new nodal officer of MPCB.
18.07.2016 - Department update: The issue was discussed in the CC meeting held on 18.07.2016 Minutes
awaited. NGT's opinion (dated 29.07.2016) on the matter will also be considered by MPCB.
Investor has submitted application for developing Integrated Industrial Area (IIA) on 17 January 2014 to
Director of Town Planning Department Pune. The said application is still pending for approval. IIA policy will be published
Pune High Tech Industries & Integrated
Update from the investor: Investor has made a fresh application to obtain IIA notification on 25th March shortly. In the meanwhile MIDC
53 infra Engineering Mining Industrial Area 17.01.2014 Open
2015 and have shared it with MAITRI. (IIA) committee will be visiting
Pvt Ltd. Department application
Update from the department: the site for screening.
The formulation of IIA guidelines is under process.
Page 21 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Page 22 of 35
Maharashtra Industry Trade Investment Facilitation Cell
A 132 KV EHV substation has been sanctioned by the department but the implementation work for
installation of this substation is progressing at a very slow pace
13.08.2015- IM decision: A joint meeting to be organised by DI on 19th August 2015 with MSETCL and
investor to resolve the issue. Minutes are awaited
11.09.2015- Update from department: The supply line to this s/s is coming from Yavatmal s/s, where
MSETCL is facing a land ROW issue. MSETCL to resolve the matter in consultation with MIDC for survey of
the area and unutilised power connections, which can be diverted to Raymond unit for time being.
Plot No. C-4 08.01.2016- Field visit update- the work is pending for two different sections - 1. some portion of land is
The department to look into
Raymond Uco Lohara, MIDC, Forest falling under forest land 2. some portion of land is encroached. MSETCL has written to Forest department and
56 power 06.04.2015 the matter and update MAITRI Open
Denim Pvt. Ltd. Tal. & Dist.- /MSETCL SDO, Revenue for action. According to Exe. Engineer, MSETCL the work will be completed by March 2016
on the same.
Yavatmal 05.02.2016- Department update: Forest department, Yavatmal has referred the issue to Dy PCCF Nagpur.
The encroachment issue pertaining to SDO is yet to be resolved.
24.02.2016- MSETCL update: a conditional NOC from SDO is received and work is under progress. The file in
Forest Dept. is forwarded to Jt Secy (Forest)
11.03.2016- Forest Dept. update: For the NOC from Forest department the file is under process with PCCF.
It would take 2-3 months to issue the NOC.
08.07.2016- IM Decision: The file is under process with Additional PCCF (Central).
04.08.2016- Department update: PCCF (State) to comply with relevant documents to PCCF (Central)
Investor submitted an application on 6 January 2014 for approval of joint venture development of Industrial
JV IIA policy will be published
Industries & Park with MIDC under the policy for development of Integrated Industrial Areas with MIDC under the policy for
Renaissance Indus Development shortly. In the meanwhile MIDC
57 MIDC Thane Mining 06.01.2014 development of Integrated Industrial Areas of the Maharashtra Industrial Policy 2013 and it is still pending. Open
Infra Ltd of Industrial (IIA) committee will be visiting
Department Update from the department:
park the site for screening.
MIDC to take decision once the IIA is notified by Industries Department
Page 23 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The investor applied for zone change of 258 acre land and has complied with required documents on
21.04.2014. He is still awaiting the approval.
14.08.2015-Update from the department: The file has recently been approved by the office of CM and the
department is in process of publication of notification.
31.08.2015-Verbal update from department: UDD will publicise the matter within 2 days.
16.08.2015- verbal update from UDD: UDD will issue letter to investor for payment of premium charges for
zone conversion. upon payment, the zone conversion would take place.
09.10.2015- Investor meeting update: The letter for premium payment has been issued to the investor. The MAITRI to follow up with the
Renaissance Indus Zone 19.03.2011
58 MIDC Thane UDD investor has represented to waive off the said premium charges on basis of zone conversion policy. UDD has department to expedite the Open
Infra Ltd conversion 30.07.2012
referred the case for policy decision to the CM level. Investor has paid the necessary fees in January 2016. case.
04.02.2016- Investor update: Investor have been issued the premium payment demand letter with named
M/s Renaissance Infrastructure instead of M/s Renaissance Indus Infra Ltd. Hence Investor has represented
the letter to UDD asking to rectify the same and issue a new demand letter.
11.03.2016- Department update: new demand note is issued to the investor.
16.05.2016 - Investor update: The file is under process with UDD, Mantralaya. Investor is yet to acquire 65
acres (out of 258 acre), due to which, the department has not convert the land and raised the query to
investor. Investor has submitted undertaking that he will purchase the balance land- 65 acre
The investor informed MIDC that his plot is not accessible without a proper approach road. Due to this, the
development work is not possible. Investor has obtained conditional building plan approval on 01.10.2014
that it will stand cancelled, if the construction work is not started within 12 months (i.e. 01.10.2015) from
E-12, Shirala the date of issuance of this approval.
Approach MAITRI to follow up with the
Rex Polyextrusion MIDC Growth Till date, approach road is not provided to the unit and hence, the investor could not start development work.
59 MIDC Road & BCC 26.07.2012 department to expedite the Open
Pvt. Ltd. Centre, He is requesting for an approach road and a free time limit extension for BCC.
Extension case.
Sangli. 28.03.2016- MIDC update: The file is under process with CEO, MIDC
12.04.2016- MIDC update: Tender work is under progress. The file for BCC extension is with Dy. CEO2
18.05.2016- MIDC update- The note is submitted to Jt CEO
05.07.2016- MIDC update: A report is awaited from CE, Pune
Page 24 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Investor initially submitted the application for Obtaining Environment Clearance on 12.04.2013 which was
discussed in 75th, 82nd, 83rd, 96th and 104th SEAC meetings. However, the EC was not accorded to the
unit. Lastly proposal has been discussed in the 95th SEIAA meeting on 12.01.2016 in which committee has
recommended for reconsideration in SEAC1 meeting
10.03.2016- Environment dept. update: Will be considered in ensuing SEAC-1 meeting as directed by SEIAA
in its 95th meeting.
11.03.2016- IM Decision: If the case is not taken up in SEAC1 meeting, then the investor to be called for the
next Investor Meeting.
29.03.2016 - Department has uploaded meeting agenda, which includes the case of this unit. Investor is
informed for the same. Minutes are awaited. SEAC Committee is seeking
Khanav, Tal:
10.04.2016- Department update- According to minutes, SEAC 1 committee has requested MSRDC to provide clarity from GSDA on NOC by
Robo Silicon Private Khalapur, Environment Environment
60 12.04.2013 the NOC. 15.08.2016 and the case to be Open
Limited Dist. Raigad. department Clearance
16.05.2016- Investor update: MSRDC yet to write a letter to Bombay IIT for conducting the survey at the taken up in the next SEAC
plant location and preparing the report. meeting.
18.05.2016- Investor update: MSRDC has written letter to IIT Bombay for conducting the survey. Further,
the NOC from GSDA will be issued to the investor shortly.
31.05.2016- MSRDC update: MSRDC has again asked IIT Bombay to conduct another survey, IIT Bombay has
already submitted survey report of first survey.
23.06.2016- Investor update: MSRDC has given the report of IIT Bombay (first report)- and NOC to investor,
for submission to SEAC meeting. Investor has submitted the same.
08.07.2016- Department update: The case to be taken up in the next SEAC meeting.
15.07.2016- Investor update: The case was discussed in the SEAC-I meeting and the field visit was
recommended to the unit.
22.07.2016- Investor Update: The field visit was completed on 22.07.2016. and the case has been referred
to the SEAC meeting scheduled on 05.08.2016.
05.08.2016- Investor update: Investor to comply with report-as discussed in SEAC meeting.
Survey No.
The investor has purchased the land and building through Auction process (from official liquidator High court,
36/ I-B ,Near
Alibaug) in 2012. As per investor, delayed documents from High court resulted in delayed registration - in
Chinchoti
NOC (power 2015.
Samartha Opto- Gram MAITRI to follow up with the
Gram connection & The investor has applied to Gram panchayat for its NOC to obtain power connection for the unit but till date,
61 Electropolymer Pvt. Panchayat, 10.04.2015 department to expedite the Open
panchayat start of it has not been received by the unit. The investor has also sent reminder on 11.02.2016 to gram panchayat
Ltd. Phansapur case.
activity) in this regards
tarf Umate
11.03.2016- IM decision: The case to be presented for the CM meeting. SICOM to visit the gram panchayat
Village,
to expedite the issues.
Alibaug
Page 25 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The unit is connected with 33 KV line, but due to frequent power failures and fluctuations, the productivity
of their existing unit is getting affected. The investor has requested to expedite the installation of an
alternative lines to ensure uninterrupted power supply.
August 2015- Update from department:
It is proposed to connect the unit on 220 KV Raymond substation through a new link line of 33 KV. To carry
out this work, tender was floated on 1st June 2015 (which received no bids) and refloated on 27th June For solving the Right of Way
2015 (Last date for bid submission 11 July 2015). issue, the route of feeder is
Meanwhile, a revised instruction have been received from Head Office to issue Infra - II tenders locally for changed. MSEDCL is following
Samsonite South Revenue/ Nasik (R) Division which includes above work. up with the agency for speedy
62 Igatpuri Power 23.12.2006 Open
Asia Pvt. Ltd. MSEDCL 08.10.2015- Update from department: Survey for the work has given to contractor. Tentative time - 2 completion of work
months. To be reviewed in January 2016 The case to be referred for
13.01.2016- MSEDCL update- The said work of substation is under progress. Meanwhile, the power supply is CM's meeting highlighting the
extended to Investor's premises from another feeder. Right of way issues.
13.04.2016- IM decision: the work is stuck due to right of way issue. MSEDCL to get in touch with Collector
to resolve the issue and execute the works.
20.05.2016- MSEDCL update: Right of way issue has been resolved and work of erecting the poles for 33 KM
HT line is completed. Work of conductor stringing and Cable laying will be completed within 10 days.
24.06.2016- MSEDCL update: The issue of right of way is still hampering the work
The investor had made an application for Building Plan Approval and BCC on 27th October 2015 and the
demand note was for the same was issued on 27th January 2016. Meanwhile since the MIDC land rates were
W-100, MIDC, As MIDC has taken a decision
revised MIDC has demanded the charges according to the new rates.
Anand Nagar, and communicated with the
Investor had made an appeal to consider older rates which was denied by MIDC in May 2016.
64 Seehra Industries Addl.Amberna MIDC Land rates 10.03.2016 investor, MAITRI not to pursue Closed
05.07.2016- MIDC update: Old rate will not be applied. SPA to share a letter to RO and RO will communicate
th, Dist. the case further. The issue was
the same to the investor.
Thane closed on 12.08.2016
03.08.2016- Investor update: Investor has received the demand note accordingly and he has made payment
under protest.
Page 26 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The unit had not obtained consent to establish before starting the construction work and therefore has been
issued show cause notice by MPCB seeking explanation. The unit wants to obtain Consent to Establish and
Operate together and wants to know the solution to come out of this situation.
Update from Regional Office, Nagpur:
Shri Omtee Steel Consent to Till the time moratorium is not lifted, Industry cannot commence production. Consent will be issued after
66 Tadali MIDC MPCB 17.03.2012 Open
Pvt. Ltd. Establish 01.06.2016- Investor update: The moratorium is lifted and investor was asked to make fresh application. submission of additional fees
Investor has applied again.
01.07.2016- Investor update: The file is submitted to Head office, MPCB after the filed visit made by MPCB.
The investor has complied on 05.07.2016 as requested by MPCB
08.08.2016- MPCB update: The file is under process at HO, MPCB
Application has been made for MOU extension for next five years in view of delay in obtaining Mining Lease.
Investor has submitted application for renewal of MOU in 2012.
Industries & The department to look into
Extension of August 2015- Update from the department:
67 Sindhudurg Mining Sindhudurg Mining 30.07.2012 the matter and update MAITRI Open
MOU Application has been forwarded to State Government for approval.
Department on the same.
13.01.2016- Department update- the proposal will be referred to HPC
17.05.2016- Department update- the proposal is being scrutinized
Page 27 of 35
Maharashtra Industry Trade Investment Facilitation Cell
In 2012, investor has purchased a private land ad-measuring 0.70 Hector at Manor - Wada Road, Survey No.
SURVEY NO. 171 Part, Aamgaon, Palghar and got the same transferred to their company's name for carrying industrial
171(P), activity through Tehsildar office. After taking all the required approvals investor has built a factory of 24532
VILLAGE Sq. feet carpet area with all robust infrastructure.
AAMGAON, Now, On 3rd June 2015, Tehsildar - Wada issued a notice under land restoration act (Maharashtra Tribal
Sky Enterprises Pvt MANOR Law), 1974 section 35/74 and 14/75 to return the land. The issue was closed on
68 Revenue Land dispute 23.03.2016 Closed
Ltd WADA ROAD, 30.06.2016: Investor Update : - Investor has attended a hearing on 29th June 2016 at collector office and 12.08.2016
TALUKA submitted all the required documents. Next hearing on the case to be held on 13th July 2016.
WADA, DIST. 08.07.2016- IM Decision: Many units in Wada district are affected due to this law. This unit has purchased
PALGHAR - the land from non tribal owner- a freehold land. However, being a policy matter, MAITRI cannot do much in
421303 the case. To assist the investor, MAITRI to write a letter addressed to Collector Palghar requesting due
consideration-and share the draft letter with PS (Industries). MAITRI to close the case.
The investor submitted application for diversion of 87.97 Ha of forest land to comply with the safety zone
requirement to manufacture defence explosives. The proposed forest land is not a part of the wildlife
sanctuary nor a wildlife corridor. Some NGO and Wildlife Warden has raised objections. Their file is pending
for approval with PCCF Nagpur since 20 January 2015.
August 2015- Update from the department: Proposal under Forest (Conservation) Act for diversion of forest
land has been processed for approval of Govt of Maharashtra. After approval of Govt of Maharashtra, the
same will be forwarded to MoEF & CC.
23.09.2015- Investor update: File is with Minister (Forest), who will take views of the Mr. Bagrodia, MLC (the
opponent) in some time
File is submitted to Honourable
01.10.2015- Update from Department: Proposal under Forest (Conservation) Act for diversion of forest land
Minister of Forest.
has been processed for approval of Govt of Maharashtra. After approval of Govt of Maharashtra, the same will
Forest Dept. to also call PS
Solar Industries Chakdoh, Forest Diversion of be forwarded to MoEF & CC.
69 13.04.2013 (Industries) in the next Open
India Ltd. Katol Department Forest land 07.11.2015- department update: Minister had a meeting with opponent who has raised concerns about
meeting with Honourable
wildlife activities in 84 hectare area. A study of tiger activities in the said area is carried out with help of
Minister of Forest with regards
cameras by DCF. The report from PCCF will be completed in next 15-20 days.
to this case.
16.12.2015- Department update- PCCF report is received however the local MLA (Mr Sunil Kedar) has raised
concerns about tiger habitat with MoEF.
14.01.2016- Department update-A meeting was held by Forest Minister on 16.12.2015 at Nagpur with Mr.
Kedar, MLA. It was agreed that restudy (of 7 days) will be done by involving Mr. Kedar in the proposed area
by camera trap. Mr. Kedar wanted department to ascertain if company has done any encroachment on forest
land and provide information about cattle kill in said area. All information’s have been provided on 5/1/2016.
However, restudy is yet to be started.
29.06.2016- Department update: The re-study is done. the file is submitted to chief secy. The file is sent
back to Forest department for queries.
08.07.2016- IM Decision: The file is re-submitted to Chief Secretary for further action.
Page 28 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Investor is planning for an expansion of his existing project but no land is available in MIDC. The directors of
the company own two plots adjoining to the existing unit and these plots require Industrial NA permission to
start the work for expansion. The plots are 242/1, 242/2, 244/2+3, 4, 5.
Plot 242/1 and 242/2 already has commercial NA permission and needs to be changed to industrial. (Pending
with Commissioner)
Since BTAL is withdrawn,
Plot 244/2+3, 4, 5 is agricultural plot and investor already applied to Dist. Collector Jalgaon to change it to
Gadegaon, Revenue permission of DI /DC is not
Supreme Industries Commercial NA which is expected to be received within this week. Once the commercial NA is received from
71 Tal. Jamner, Department / NA permission 20.04.2016 required and accordingly DI to Open
Ltd. Collector's office, the Municipal Commissioner, Jalgaon will have to authorise the transfer from Commercial
Dist.. Jalgaon DI reply to the application made
NA to Industrial NA. (Pending with collector).
by the investor.
20.05.2016: Investor update: Investor met with Jalgaon Municipal commissioner and it has been informed to
him that since the said plot is marked as residential zone as per the proposed development plan released by
UDD. So as per section 37, Maharashtra Regional & Town Planning Act 1966 - the permission from GOM is
required. So investor has submitted an application to Development Commissioner on 20.05.2016.
Village
The unit was accorded Mega Project status for its proposed investment of 1115 Croce on 9.08.2006.
Amdoshi,
However, due to the unforeseen delay in acquiring land for a minor port to import hazardous raw material,
Wagnani Revision in
Industries & the unit is unable to commit the full resources and requesting to change the Mega Project investment MAITRI to follow up with the
Supreme Wakan - Roha scope of Mega
72 Mining 20.05.2012 amount to 520 Crore and a time extension up to December 2017. department to expedite the Open
Petrochem Ltd. Road, Taluka - Project
Department 17.05.2016- Department update- The unit is asked for submission of compliance case.
Roha, Raigad, investment
22.06.2016- Investor update: Unit has complied for the same
Maharashtra -
402106
Page 29 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The investor applied BCC time limit extension for plot no. D-85 which is in production since 2004. He has
produced all relevant documents to prove the production date, yet the RO MIDC is asking for additional
documents. According to the investor, if the penalty is levied for time limit extension than the project will not
be viable.
07.11.2015- Investor meeting decision: Dy. CEO MIDC to give a hearing to the investor on Monday
D-85 and
09.11.2015 at MIDC HO and take a decision on the same.
108,M I D C
17.11.2015- Investor update: Investor was asked to apply again at RO office, Pune. Investor has applied to
Ranjangaon MAITRI to follow up with the
the same
75 Swarovski Pvt. Ltd. Village,Koreg MIDC/ DI BCC Extension 18.11.2015 department to expedite the Open
24.12.2015- Investor update- the investor has applied for BCC on 15.12.2015 and has shared the copy to
aon,Shirur, case.
MAITRI
Ranjangaon-
04.01.2016 - MIDC update- Investor is asked to comply with certain document
412220
02.05.2016 Investor update - The investor has already complied with the relevant documents
18.05.2016- MIDC update- The file is with Dy CEO2
30.05.2016- Investor update: Investor has received demand note for BCC extension.
08.07.2016- IM Decision: DI to certify the date of production on this plot and communicate the same to
MIDC. Investor to provide necessary documentation.
Page 30 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The Investor is constructing a storage Hall at Plot No. D-108 with necessary permission of MIDC. There is no
discharge from the Storage Hall, and want connection to Strom Water line of MIDC to discharge pure rain
water. But the permission was denied. Investor is requesting for Storm Water connection for his storage Hall.
07.11.2015 - Investor Meeting Decision: Dy. CEO MIDC to give a hearing to the investor on Monday
09.11.2015 at MIDC HO and take a decision on the same.
09.11.2015 - Investor Update - Investor to make a fresh application to Dy. Engineer MIDC and then MIDC to
look into the matter.
D-108,M I D C
22.12.2015 - Update from the investor: The investor has made an application on 17.11.2015 to Dy. Engineer
Ranjangaon
MIDC. MIDC to look into the matter and update MAITRI.
Village,Koreg The issue was closed on
76 Swarovski Pvt. Ltd. MIDC Infrastructure 17.11.2015 20.01.2016- Investor update: MIDC rejected the application by saying that storm water can be directed Closed
aon,Shirur, 12.08.2016
through exclusive rainwater harvest pits and there is no need to give connection to rainwater drainage line of
Ranjangaon-
MIDC. Investor to apply now at HO, Mids. to pursue the matter. Investor will apply for the same in sometime
412220
11.03.2016- IM decision: The investor to resubmit the application copy to MIDC, HO Mumbai
25.03.2016- Investor update: Investor has resubmitted the application
18.05.2016- MIDC update- Investor needs to comply
08.07.2016- IM Decision: This issue is resolved on 4th July meeting between MIDC and Swarovski. Swarovski
has agreed to do rain water harvesting on adjoining D 85 plot.
Investor to come back if issue still persists. MAITRI has closed the case after the investor confirmed that the
issue is resolved.
Plot No. D
236/4 Chakan
Tata Ficosa The investor has made an online application for consent to Establish under Green Category and the reference
Industrial Consent to The issue was closed on
77 Automotive MPCB 30.06.2016 number for the same is 0000009375. Closed
Area Phase II, Establish 12.08.2016
Systems Pvt. Ltd. 08.08.2016- MPCB update: The consent is granted on 28.07.2016. The issue to be closed.
MIDC Chakan,
Pune.
D 236/7
Chakan
The investor has made an online application for consent to Establish and the reference number for the same
Tata Toyo Radiator Industrial Consent to The issue was closed on
78 MPCB 02.07.2016 is 0000009514. Closed
Ltd. Area Phase II, Establish 12.08.2016
08.08.2016- MPCB update: The consent is granted on 28.07.2016. The issue to be closed.
MIDC Chakan,
Pune.
Gat no
1419/2, The power failure is because
Shikrapur, Frequent The unit is facing power disruption for 5-6 times daily. Since it is a forging unit, the heating machine takes up the unit is obtaining power
Trinity Auto
79 Taluka MSEDCL power 2.06.2014 to 30 minutes to heat up after each power cut. It is causing heavy losses to the investor. The investor is from the rural feeder. MAITRI Open
Components Ltd
Shirur, Nagar disruption requesting uninterrupted power supply to inform the investor to apply
Road, Pune - power from express feeder.
412208
Page 31 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The Investor has made an application for NA permission under section 44 A for land no. 295 & 507 which is
still pending for approval. The investor has also paid the penalty for starting production without NA
Permission.
11.12.2015- Investor meeting decision: The action taken by UDD to be reviewed within 15 days. All NA
permission issue units to be called in next Investor meeting. All units facing issue of NA permission to be
called in January 2016 Investor meeting
14.12.2015- Investor update- Investor has replied to the query raised by Collector office and requested to
issue NA permission for said land at 295 and 507 (regularise)
Plot No. 297, 08.01.2016- Investor update- Investor has shared compliance - MSME registration. However he does not
Kondhle have Forest NOC and Town planning NOC. As per DCF, the land is private forest since 1956 and as per Since it is a policy related issue
Village, investor, the same land is under jurisdiction of Dist. Collector. the department needs 3
True Pack Thermo Kudus Forest
80 NA Permission 05.02.2014 11.01.2016- Investor update: Investor has applied for Forest NOC based on this. months to resolve the case. On Hold
Product Kondhle Department 28.01.2015- Forest Update: DCF jawhar has decline forest NOC on basis of Forest act 1956, which states the To be reviewed after 3 months
Road, Tal. land in question as private forest. (November 2016).
Wada, Dist. - 29.01.2016- Investor update: Investor attended Industries NA committee meeting at RDC office on
Palghar 27.01.2016 but according to him, due to no clarification received from Forest dept. in it, the matter is still
pending to be resolved. Forest dept. will revert after looking in to all facts and figures
04.02.2016- Investor update: Investor was asked by forest dept. to apply for regularise his land. No NOC can
be granted on basis of court order from the case of Godrej & Boyce Ltd.
10.02.2016- Investor update: Investor has received building plan approval and has submitted it to revenue
department (collector).
22.02.2016- Investor update: The investor has written to Hon'ble Minister (Revenue & Forest) to look into
his matter for Forest NOC. The collector has referred the issue to PS (Forest)
11.03.2016- IM Decision: The department to look into the matter to expedite the process. The forest
department is seeking opinion of Advocate General for implication of Godrej & Boyce case on this case.(1956-
section 35(3)notification - it was unsurvey land earlier. Later given survey no. certain activities were
banned.) But since it is a policy related issue the case to be reviewed after 4 months (July 2016).
Page 32 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Page 33 of 35
Maharashtra Industry Trade Investment Facilitation Cell
Investor's unit has been given conditional Consent to Establish permission stating that the Consent to
Operate approval will be granted only after CETP of MIDC will be commissioned. Investor is ready to install
their own ETP and is expecting completion of over all construction work by year end. Investor is worried if
MIDC CETP is not commissioned by that time then they will have to face huge loss.
October 2015 update from investor: Investor has requested to relax the limits of LSI and MSI units for CETP
being built by MIDC in Amravati Ind area, since the effluent from his unit is having higher BOD and COD
content then the standards allowed for CETP. In this way, he has to incur double cost of effluent treatment,
which is economically not feasible. MIDC has expressed its agreement to relax the standard of MSI-LSI in the
letter to MPCB written on 29.07.2015
27.10.2015- MPCB update- A joint meeting between MPCB, MIDC and end users of CETP will be held to take
plot no T 2,
decision.
Additional MAITRI to follow up with the
VHM Industries Consent to As per the letter issued by MIDC, construction work of CETP Amravati, 1 MLD capacity & HRTS was to be
84 MIDC, MPCB 30.03.2015 department to expedite the Open
Limited operate completed by December 2015. But the contractor has not yet applied for Consent to Operate.
Nandgaon case.
08.02.2016- MIDC update- CETP has applied for Consent to operate on 29.01.2016.
Peth
13.04.2016- MPCB update: as discussed in joint meeting with industry representatives, NEERI is hired to
prepare verification report regarding HRTS developed by MIDC. Accordingly, a site visit is planned on
12.04.2016
17.05.2016- MPCB update: The consent to operate is accorded to the investor with a condition -Industry
shall start the manufacturing activity only after commissioning of proposed CETP. The investor wants to
start production. But due to this condition, he is not able to start
27.06.2016- MPCB MOM update: The consent was denied on basis that CETP is not completed. MIDC to re-
submit application after completing the works.
29.07.2016- MIDC update: MIDC has complied and submitted the application again to MPCB. The issue will be
taken up in next CC meeting
Plot A-20,
MIDC Lote Investor's application for Environment Clearance was taken up in 95th SEIAA meeting held on 11.01.2016
Parshuram, and the case was approved by the committee. However, investor has not yet received a formal copy of the
Vinati Organics Pvt. Environment Environment The issue was closed on
85 415 722, 29.09.2015 environment clearance due to which Factory license and Consent to Establish are pending. Closed
Ltd. Department Clearance 12.08.2016
Taluka 19.07.2016 - Investor Update: The investor has obtained the copy of Environment clearance on 13.07.2016,
Khed, dist. the issue to be closed in the next investor meeting.
Ratnagiri,
Page 34 of 35
Maharashtra Industry Trade Investment Facilitation Cell
The unit is currently in the construction stage and due to unavailability of basic infrastructure, the
MIDC is negotiating with
construction is getting hampered-
farmers to acquire the land (for
1) Absence of approach road between GE and the unit- due to lack of approach road, the construction
approach road). The work is in
material cannot be delivered at the project site. The investor was asked to use alternate road passing
New Holland Fiat progress. Dy. CEO, MIDC to
87 Chakan MIDC MIDC Infrastructure 19.07.2016 through Shinde village. However, Shinde village Gram Panchayat has issued a letter to investor asking not to Open
(India) Pvt. Ltd. visit the plant in next 8 days
use the village road as it is hampering the local villagers.
and MIDC to provide storm
2) MSEDL has also sanctioned the power of 4000KVA on 03.08.2015 but MIDC is yet to provide
water drainage to the unit in
infrastructure for power supply to the unit.
next 15 days .
3) Storm water drainage
The investor wants to apply for online registration for EPF and ESIC, But trade license is the mandatory MAITRI to follow up with the
Saj Food Products Application
88 Butibori MIDC EPF/ESIC 05.06.2016 document for the same and which State Maharashtra does not issue so the investor needs to know the department to expedite the Open
Ltd. (Brisk Farm) Process
application process. case.
The investor has been informed by the JDI, that the investor needs to have the maximum
amount of expenses included in our Project Report approved by the Banker in all heads of the "Eligible
Investments" and the Bank Approval Amount will get credence over the actual amount spent during grant of
Saj Food Products subsidies. In this connection, the investor would like to submit that, investor being new in the State of The issue was closed on
89 Butibori MIDC DI PSI 24.06.2016 Closed
Ltd. (Brisk Farm) Maharashtra coming in far from West Bengal, may need to revise certain aspects of our Project Report in view 12.08.2016
of present expenses incurred and projected to be incurred.
14.07.2016: Since the matter of incentives, eligible investment for the upcoming project and subsidies are
policy related matters, MAITRI to close the case in the upcoming meeting
The company is granted water quota (5 MLD) for 6 years from Chief Engineer, WRD on 03.11. 2015 and is
lifting water from Amba river. Investor has executed an agreement with WRD, Kolad for the same. A clause in
Water The department to look into
Supreme Amodeshi, Water the agreement says that "if the customer desires to reduce/increase the quota, then he has to execute a
90 resources 4.11.2015 the matter and update MAITRI Open
petrochem Ltd. Raigad agreement supplementary agreement with the same authority for 1 year period against the sanctioned quota". The unit
department on the same.
now requires only 2 MLD and hence, they have submitted a supplementary agreement for signature, which is
pending for execution. The draft agreement/proposal is forwarded to the EE,Kolad.