0% found this document useful (0 votes)
294 views2 pages

SAMI Production Triangle & Matrix

Strategic Asset Management Inc. provides asset management services to help companies improve production processes. The document describes SAMI's Production Maturity Matrix which outlines 5 stages of production maturity from low performing to high performing. At the highest stage 5 level, asset management is integrated throughout the organization to achieve predictable, low cost production through preventative maintenance and reliability-focused decisions.

Uploaded by

José Rodríguez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
294 views2 pages

SAMI Production Triangle & Matrix

Strategic Asset Management Inc. provides asset management services to help companies improve production processes. The document describes SAMI's Production Maturity Matrix which outlines 5 stages of production maturity from low performing to high performing. At the highest stage 5 level, asset management is integrated throughout the organization to achieve predictable, low cost production through preventative maintenance and reliability-focused decisions.

Uploaded by

José Rodríguez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

The SAMI Production Triangle

Strategic Asset Management Inc.


25 New Britain Avenue
Unionville, CT 06085
(800) 706-0702
[email protected]
www.samicorp.com

Strategic Asset Management Inc. We Deliver Change!


SAMI’s Production Maturity Matrix
Class
Stage Low Performing Competent High Performing
• Production Schedule Changes Daily • Production schedule planned and executed • Minimum WIP inventory maintained
• Little coordination between shifts • Raw materials available and meet spec • Scheduling is exact for mtls, staff, time
Stage 1 • Frequent unplanned production interruptions • Eqpmnt is made available for planned maint. • Production meets or exceeds Q1 spec
Planned • Raw materials have quality problems • Operators capable normal production needs • Equipment is prepared daily by operator
• Offspec product a way of life • Downtime and slowdown reasons logged • Preventive maintenance is a religion
Production • No time for preventive maintenance • Eqpmnt inspected, defect notifications done • High level of cooperation among functions
• Frequent order expediting • Eqpmnt, permits is prepared for maintenance • Operators show equipment ownership
• Production targets seldom met • Production targets usually met • Production targets routinely exceeded
• Operating spec’s undocumented or ignored • Unplanned events evaluated, corrected • Asset healthcare program for all equipment
• Operators not trained on equipment/process
Stage 2 • Production bottlenecks frequent
• Operators educated in process & equipment • Predictive techniques minimize downtime
• Production bottlenecks identified and worked • Failure analysis done for 80% of failures
Proactive • Little or improperly used automation • Operating specs identified, surveilled • Results of RCFA’s implemented routinely
Production • Operators have little process visibility • DCS upgraded to perform additional functions • Condition monitoring based on cost & risk
• DCS antiquated, unstable, circumvented • Quality built into process, not inspection • Prevention is a cultural imperative
• Equipment not designed/maintained to • Raw material acquisition quality specified • Trades work on designing out failure
perform required function

• Training unconnected to real work practice • Supervisors have clear roles & accountability • Work teams flexible, self-directed
• “Team” implementation causes confusion • Operators inspect, lube, prep equipment • Supervisors coach & advise
Stage 3 • Supervisors lack authority, accountability • Task teams form, identify solutions, disband • Continuous improvem’t embraced, effective
Organizational • Unclear roles and responsibilities • Most work is directly by a priority system • Clear priorities established for work
Excellence • Skills flexibility in contract, not implemented • Natural work teams effective at routine maint. • Reward/Recognition support best practices
• Operators don’t inspect or maintain equipm’t • Service contract exists between maint.& ops. • Skills predominate over functions
• No individual performance targets/goals • Craft multi-skilling and flexibility implemented • All staff systems competent

• RCM implementation creates confusion, • Reliability models run for critical systems • Concurrent engineering assures RAMBO
results not implemented Component MTBF specifications defined • Reliability tied to financial results
Stage 4 • Jobs changed on paper, not in reality • Equipment standards implemented • Lifecycle costs are the basis for decisions
Engineered • Stages 1&2 are ignored to “eliminate work” • Critical equipment assessed via RCM • Vendor contracts pay for function reliability
Reliability • Emphasis on analysis, not implementation • Projects get input from maintenance, ops • Production targets set by reliability models
• Vendor reduction brings lower service levels • Equipment types, models rationalized • Equipment failures are a rare occurrence
• Purchasing buys by lifecycle cost, not price

• Management unclear re: goals & methods • Clear organizational alignment • Each employee knows & is rewarded for role
• Equipment condition not factored into goals • Goals cascaded from plant level to individual • All decisions based on facts and models
Stage 5 • Equipment run parameters changed daily to • Production goals based on plant capability • 80% of work is preventive or project, & is
Asset respond to market pressures • Most work identified and planned prior year identified prior to the start of the year
• Too many priorities prevent focus • Hourly help set unit goals & work improvem’ts • Production is 98% predictable
Management • Poor understanding of plant potential/ • Activity-Based Management implemented • Lowest cost producer
liabilities • Prod’n reliability is part of product marketing • Plant becomes corporate expansion site