Beach Resort
Beach Resort
Beach Resort
Basic information:
Pudhucherry
1.1 Permanent or temporary Yes Land use given by state land use board that the site
change in land use, land falls in commercial land.
cover or topography
including increase in Enclosed in Annexure – 1 & 2
intensity of land use (with
respect to local land use
S. Information / Checklist Yes/ Details thereof (with approximate quantities/ rates,
No confirmation No wherever possible) with source of information data
plan)
1.2 Details of CRZ Yes The proposed site islocated in CRZ III
classification as per the
approved Coastal Zone Enclosed in Annexure – 3
Management Plan?
1.3 Whether located in CRZ-I No The proposed site islocated in CRZ III
area?
1.6 Whether the area is prone No The site is stable and not prone to cyclone, Tsunami,
to cyclone, tsunami, tidal tidal surge, subduction or earthquake. As per the
surge, subduction, earth Seismic Zone Map The site falls in Zone 2 (Least to
quake etc.? moderate). The seismic Zonation map is enclosed in
Annexure-4
1.8 Clearance of existing land, Yes The shrubs have to be cleared during construction
vegetation and buildings?
1.9 Creation of new land uses? Yes The proposed site will be for Beach Resort
1.10 Pre-construction Yes Soil testing has been done. Attached in Annexure-5.
investigations e.g. bore
houses, soil testing?
S. Information / Checklist Yes/ Details thereof (with approximate quantities/ rates,
No confirmation No wherever possible) with source of information data
1.11 Construction works? Yes Construction is done within the boundary limits.
1.13 Temporary sites used for Yes Temporary Housing of construction workers will be
construction works or facilitated within the proposed sites.
housing of construction
workers?
1.14 Above ground buildings, Yes The proposed project will have above ground
structures or earthworks structures since it is a beach resort
including linear structures,
cut and fill or excavations
1.20 Facilities for storage of Yes During the construction phase materials like sand,
goods or materials? bricks, cement, metal rods, etc will be stored in
allotted storage yards inside the project site
Solidwaste
i. STP sludge, canteen waste etc
1.23 New road, rail or sea traffic Yes The proposed site connects with the existing SH 49 –
during construction or East Coast Raod
operation?
1.24 New road, rail, air Yes The proposed site connects with the existing SH 49 –
waterborne or other East Coast Road
transport infrastructure
including new or altered
routes and stations, ports,
airports etc?
1.31 Transport of personnel or Yes Transport of personnel, materials will be through the
materials for construction, State Highway connects with the existing SH 49 –
operation or East Coast Road.
decommissioning?
1.34 Influx of people to an area There will temporary influx while the construction is
in either temporarily or going on
permanently?
S. Information / Checklist Yes/ Details thereof (with approximate quantities/ rates,
No confirmation No wherever possible) with source of information data
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in short
supply):
Construction material-stone,
2.4 Bricks, cement and sand
aggregates, sand/ soil
Emissions from burning of waste No Open burning of biomass / other material will
5.7 in open air (e.g. slash materials, be prohibited.
construction debris)
7. Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, coastal waters or the sea:
8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment
8.3 Could the project be affected by No As per the Seismic Zone Map The site falls in
natural disasters causing Zone 2 (Least to moderate).Suitable seismic
environmental damage (e.g. coefficients in horizontal and vertical directions
floods, earthquakes, landslides, respectively, will to be adopted while designing
cloudburst etc)? the structures.
9.1 Supporting infrastructure (roads, power Proper facilities like road, power
Yes
supply, waste or waste water treatment, etc.) supply etc will be provided
SenthamaraiKulam 8.78 km
KuruvinathamThangal 7.40 km
SenthamaraiKulam 8.78 km
KuruvinathamThangal 7.40 km
Sulliyankuppam 1.96 km
Moorthikuppam 1.04 km
Manapet 0.44 km
KuruvinathamThangal 7.40 km
DECLARATION
I hereby given undertaking that the data and the information given in the application and
enclosures are true to the best of my knowledge and belief and I am aware that if any part of the
data and information submitted is found to be false or misleading at any stage, the project will be
rejected and clearance give, if any to the project will be revoked at our risk and cost.
Date:
Place:
RESORT” AT
MANAPET REVENUE VILLAGE,
BAHOUR COMMUNE PANCHAYAT,
PUDUCHERRY
Submitted by
Report prepared by
i
Contents
1. INTRODUCTION ................................................................................................................................ 1
1.1 PROJECT:..................................................................................................................................... 1
1.2 PROJECT NEED AND ITS SIGNIFICANCE:............................................................................ 1
1.3 OBJECTIVES OF THE EIA STUDY: ......................................................................................... 2
1.4 SCOPE OF THE STUDY: ............................................................................................................ 2
1.5 ORGANISATION OF THE REPORT: ........................................................................................ 2
2. PROJECT DESCRIPTION................................................................................................................... 4
2.1 PROJECT DETAIL: ..................................................................................................................... 4
2.2 NATURE AND SIZE OF THE PROJECT: ................................................................................. 4
2.3 PROJECT LOCATION: ............................................................................................................... 5
2.1 PROJECT ACTIVITIES ............................................................................................................... 7
2.1.1 Land Requirement..................................................................................................................... 7
2.1.2 FSI area Calculation:................................................................................................................. 8
2.1.3 Details of proposal with area breakup....................................................................................... 9
2.1.4 Parking Standards ................................................................................................................... 10
2.1.5 Accessibility............................................................................................................................ 10
2.2 RESOURCES REQUIREMENT ................................................................................................ 10
2.2.1 Water....................................................................................................................................... 10
2.2.2 Water Source:.......................................................................................................................... 11
2.2.3 Power Requirement................................................................................................................. 11
2.2.4 Energy Saving Measures......................................................................................................... 12
2.2.5 Fire Fighting Systems ............................................................................................................. 12
2.2.5.1 Fire Extinguishing Systems ................................................................................................ 13
2.2.5.2 Process ................................................................................................................................ 13
2.2.5.3 Underground water storage tank ......................................................................................... 13
2.2.5.4 Wet riser .............................................................................................................................. 14
2.2.5.5 Fire pump, hydrant pump & jockey pump .......................................................................... 14
2.2.5.6 Hydrant ............................................................................................................................... 14
2.2.5.7 Fire alarm system ................................................................................................................ 14
2.2.5.8 Public address system ......................................................................................................... 14
2.2.6 Greenbelt Development .......................................................................................................... 15
ii
3. DESCRIPTION OF THE ENVIRONMENT...................................................................................... 16
3.1 STUDY AREA, PERIOD, COMPONENTS & METHODOLOGY .......................................... 16
3.2 ESTABLISHMENT OF BASELINE FOR VALUED ENVIRONMENTAL COMPONENTS 17
3.2.1 Air Environnent................................................................................................................... 17
3.2.2 Design of Ambient Air Quality Monitoring Network......................................................... 17
3.2.2.1 Micrometeorology............................................................................................................... 18
3.2.3 Ambient Air Quality Status................................................................................................. 19
3.2.3.1 Baseline Status .................................................................................................................... 19
3.2.3.2 Particulate Matter ................................................................................................................ 19
3.2.3.3 Gaseous Pollutants .............................................................................................................. 19
3.2.3.3.1 Sulfur dioxide and Oxides of Nitrogen ........................................................................... 19
3.2.3.3.2 Carbon Monoxide ........................................................................................................... 20
3.3 NOISE ENVIRONMENT........................................................................................................... 23
3.3.1 Reconnaissance ................................................................................................................... 24
3.3.2 Community Noise Levels.................................................................................................... 24
3.3.3 Baseline Status .................................................................................................................... 25
3.4 Water Environment ..................................................................................................................... 27
3.4.1 Reconnaissance ................................................................................................................... 27
3.4.2 Water Quality Survey.......................................................................................................... 27
3.4.3 Baseline Water Quality ....................................................................................................... 28
3.4.4 Physico-chemical Characteristics........................................................................................ 28
3.5 LAND ENVIRONMENT ........................................................................................................... 31
3.5.1 Reconnaissance ................................................................................................................... 31
3.5.2 Baseline Data ...................................................................................................................... 31
3.5.3 Physical Characteristics ...................................................................................................... 31
3.5.4 Chemical Characteristics..................................................................................................... 32
3.5.5 Heavy Metals ...................................................................................................................... 32
3.5.6 Land Use Pattern ................................................................................................................. 34
3.5.7 Seismicity............................................................................................................................ 35
3.6 BIOLOGICAL ENVIRONMENT .............................................................................................. 36
3.6.1 Reconnaissance ................................................................................................................... 36
3.6.2 Vegetation Analysis ............................................................................................................ 36
iii
3.6.3 Terrestrial Flora................................................................................................................... 37
3.6.4 Greenbelt Plantation............................................................................................................ 37
4. ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES ......................... 41
4.1 INTRODUCTION ...................................................................................................................... 41
4.2 IMPACTS OF PROPOSED PROJECT ...................................................................................... 41
4.3 IMPACTS ON TOPOGRAPHY................................................................................................. 41
4.3.1 Impact during Construction Phase ...................................................................................... 42
4.3.2 Impact during Operational Phase ........................................................................................ 42
4.4 IMPACTS ON AIR QUALITY .................................................................................................. 42
4.4.1 Impact during Constructional Phase ................................................................................... 42
4.4.2 Impact during Operation phase ........................................................................................... 43
4.5 IMPACTS ON WATER QUALITY........................................................................................... 43
4.4.3 Construction Phase.............................................................................................................. 43
4.4.4 Operational Phase ............................................................................................................... 43
4.6 IMPACT ON COASTAL REGULATION ZONE (CRZ).......................................................... 44
4.7 NOISE ENVIRONMENT........................................................................................................... 44
4.7.1 Impacts on Construction phase ........................................................................................... 44
4.7.2 Impacts on operational phase .............................................................................................. 45
4.8 IMPACTS ON AQUATIC ECOLOGY ..................................................................................... 45
4.9 IMPACTS ON SOIL................................................................................................................... 45
4.9.1 Impacts of construction phase ............................................................................................. 45
4.9.2 Impacts of operational phase............................................................................................... 46
4.10 IMPACT ON SOCIO-ECONOMIC FACTORS ........................................................................ 46
4.10.1 Impacts of construction phase ............................................................................................. 46
4.10.2 Impacts of operational phase............................................................................................... 46
4.11 EVALUATION OF IMPACTS .................................................................................................. 46
4.12 MATRIX METHOD................................................................................................................... 47
4.12.1 Limitations of Matrix Method............................................................................................. 49
4.12.2 Justification for Matrix Method .......................................................................................... 49
4.13 CONCLUDING REMARKS ...................................................................................................... 52
5. ENVIRONMENTAL MONITORING PROGRAM........................................................................... 53
5.1 INTRODUCTION ...................................................................................................................... 53
iv
a. ENVIRONMENTAL EFFECTS MONITORING IN EIA ......................................................... 53
b. POST PROJECT ENVIRONMENT MONITORING PROGRAM ........................................... 54
c. REPORTING & DOCUMENTATION ...................................................................................... 55
6 RISK ASSESSMENT, EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN .. 56
6.1 RISK ASSESSMENT ................................................................................................................. 56
6.1.1 Introduction to risk assessment ........................................................................................... 56
6.1.2 Objectives ........................................................................................................................... 56
6.1.3 Philosophy behind risk assessment ..................................................................................... 56
6.2 METHODOLOGY OF RISK ASSESSMENT ........................................................................... 57
6.3 HAZARD IDENTIFICATION ................................................................................................... 60
6.3.1 Introduction ......................................................................................................................... 60
6.3.2 Hazard identification........................................................................................................... 60
6.3.3 General Hazards .................................................................................................................. 61
6.4 CONSEQUENCE ANALYSIS................................................................................................... 61
6.4.1 Occurrence of incident ........................................................................................................ 61
6.4.2 Evaluation of incidents........................................................................................................ 61
6.4.3 Selection of incidents .......................................................................................................... 61
6.4.4 Present case ......................................................................................................................... 61
6.4.5 Consequence calculations ................................................................................................... 62
6.4.6 Conclusions from the Analysis ........................................................................................... 62
6.5 DISASTER MANAGEMENT PLAN ........................................................................................ 63
6.5.1 Disaster Management during Construction phase............................................................... 64
6.5.2 Safety Plan .......................................................................................................................... 66
6.5.3 Safety Training.................................................................................................................... 66
6.5.4 Natural disasters .................................................................................................................. 66
7 ENVIRONMENT MANAGEMENT PLAN ...................................................................................... 79
7.1 INTRODUCTION TO ENVIRONMENT MANAGEMENT PLAN......................................... 79
7.1.1 General ................................................................................................................................ 79
7.1.2 Environment Management Plan .......................................................................................... 81
7.1.3 Objectives of EMP .............................................................................................................. 83
7.2 ENVIRONMENTAL PROTECTION PLAN............................................................................. 83
7.3 MITIGATION FOR PRE-CONSTRUCTION AND CONSTRUCTION PHASE IMPACTS .. 84
v
7.3.1 Land acquisition and site preparation ................................................................................. 84
7.3.2 Construction activities......................................................................................................... 84
7.4 MITIGATION MEASURES ...................................................................................................... 86
7.4.1 Land Environment............................................................................................................... 86
7.4.2 Water Environment ............................................................................................................. 87
7.4.3 Air Environment ................................................................................................................. 87
7.4.4 Noise Generation................................................................................................................. 88
7.4.5 Biological Environment ...................................................................................................... 89
7.4.6 Social Environment............................................................................................................. 89
7.4.7 Miscellaneous Measures ..................................................................................................... 90
7.5 MITIGATION FOR OPERATION PHASE............................................................................... 90
7.5.1 Water Environment ............................................................................................................. 90
7.5.1.1 Water source development:................................................................................................. 90
7.5.1.2 Minimizing Water Consumption......................................................................................... 90
7.5.1.3 Storm Water Management .................................................................................................. 91
7.5.1.4 Sewage Treatment Plant...................................................................................................... 92
7.5.1.5 Land Environment............................................................................................................... 92
7.5.2 Noise Environment ............................................................................................................. 92
7.5.3 Air Environment ................................................................................................................. 92
7.5.3.1 Vehicle emission controls ................................................................................................... 93
7.5.3.2 Greenbelt development........................................................................................................ 93
7.5.3.3 D.G Sets operations............................................................................................................. 93
7.5.4 Biological Environment........................................................................................................... 93
7.5.4.1 Drip Irrigation System ........................................................................................................ 93
7.5.4.2 Plantation& Landscaping .................................................................................................... 94
7.5.4.3 Green Belt Development Plan............................................................................................. 94
7.6 OCCUPATIONAL SAFETY AND HEALTH ........................................................................... 95
7.7 ENVIRONMENTAL MANAGEMENT SYSTEM ................................................................... 96
7.7.1 Management Commitment.................................................................................................. 96
7.7.2 Environmental Review........................................................................................................ 96
7.7.3 Environmental Management Cell ....................................................................................... 96
7.7.4 Setting Environmental Policy and Objectives..................................................................... 97
vi
7.7.5 Environment Management Programme .............................................................................. 97
7.7.6 Environment Management Audits and Records ................................................................. 97
7.7.7 Implementation of Environmental Management Plan ........................................................ 98
8 PROJECT BENEFITS, SUMMARY & CONCLUSION................................................................... 99
9 DISCLOSURE OF CONSULTANTS ENGAGED.......................................................................... 100
9.2 Accreditations & Certifications of Hubert Enviro Care Systems Pvt Ltd................................. 100
List of Tables
vii
List of Figures
viii
1. INTRODUCTION
1.1 PROJECT:
M/s. Trishul Buildtech & Infrastructures Pvt. Ltd intends to develop a Beach resort at Manapet
Revenue Village, Bahour Commune Panchayat, in Pudhucherry.
The proposed project comprises of a resort comprised of Villa, guest room, Spa, ballroom and
prefunction area, arrival court, reception, business center and all day dining area, staff quarters
and parking facilities and other amenities. The proposed development falls under the CRZ - III
category. The total area of the site is 66773.19 Sq.m, which comprises of facilities like Villa,
guest room, Spa, ballroom and perfunction area, arrival court, reception, business center and all
day dining area, staff quarters and parking facilities and other amenities. The total Built up area
is 17957.18 Sq.m.
As per the provisions of the CRZ notification, Coastal Regulation Zone Clearance from Ministry
of Environment and Forest is required for this proposed project.
Under the set of regulations, following steps are required to be undertaken for this proposed
project for obtaining the CRZ Clearance from statuary bodies:
Tourism is a growing industry; therefore there is need for more hospitality services. The
proposed resort aims at the need to satisfy the tourism market through provision of quality
services and accommodation.
1
The planned development with modern infrastructure facilities would add –on to the local
aesthetics.
To describe the proposed project and associated works together with the requirements for
carrying out the proposed development;
To identify and describe the elements of the community and environment likely to be
affected by the proposed developments;
To identify , predict and evaluate environmental and social impacts expected to arise
during the construction and operation phase of the project in relation to the sensitive
receptors;
To identify the negative impacts and develop mitigation measures so as to minimize
pollution, environmental disturbance and nuisance during construction and operations of
the development; and
To design and specify the monitoring requirements necessary to ensure the
implementation and the effectiveness of the mitigation measures adopted.
2
Identification of Impacts;
Impact Assessment;
3
2. PROJECT DESCRIPTION
The proposed project comprises of a resort comprised of Villa, guest room, Spa, ballroom and
prefunction area, arrival court, reception, business center and all day dining area, staff quarters
and parking facilities and other amenities. The proposed development falls under the CRZ - III
category. The total area of the site is 66773.19 Sq.m, which comprises of facilities like Villa,
guest room, Spa, ballroom and perfunction area, arrival court, reception, business center and all
day dining area, staff quarters and parking facilities and other amenities. The total Built up area
is 17957.18 Sq.m.The total cost of the proposed project Rs 24 crores.
The Proposed project development is located near the seashore, it falls under Coastal Regulation
Zone ( CRZ – III) Category. The CRZ map indicates the High Tide Line (HTL), Low Tide Line
(LTL) & CRZ boundaries lying at 200m and 500m specified by Institute of Remote Sensing,
Anna University, is enclosed in Annexure - 1.
The proposed project will be comprising of Villa (35), guest room (14), spa block, ballroom and
prefunction area, arrival court, reception, business centre and all day dining, BOH area and staff
quarters. It will be having facilities for parking and proper landscaping within the proposed site.
The project will also involve internal development of basic infrastructure such as internal roads,
power supply, water supply, sewer and storm water pipe network and waste management system.
4
2.3 PROJECT LOCATION:
The proposed project is located near the seashore & falls under CRZ – III Category. The project
site is located at Manapet Revenue Village, Bahour Commune Panchayat, in Pudhucherry. The
project site adjoins Bay of Bengal being approximately 8 m away from shoreline. The site is
approachable from State Highway 49 – East Coast Road.
5
Location of the proposed site on Maps is given below:
6
Figure 2.2 Google Image showing the project site
2.1 PROJECT ACTIVITIES
2.1.1 Land Requirement
The Total land area for Beach Resorts will be 66773.19 sq.m; the Built up area will be
around 17957.18 Sq.m.
7
In the development of the vacant plot, between the 200m to 500 high tide
line, a resort with restaurant is being proposed, as per the norms.
As per the Ministry‟s regulation the land area of the project site is planned. The
following table shows the permissible area and the proposed area as per the Floor
Space Index (FSI) and the permissible height and the proposed height of the
project.
Table 2.1 Area Statement
S. Area statement Land area
No
1 Total Land area (Sq.m) 66773.19
2 Development Zone 0-200m : 19424.91
(Sq.m)
3 No Development Zone 200-500m : 36170
(Sq.m)
4 Beyond 500 m from HTL 11179.19
8
2.1.3 Details of proposal with area breakup
The details of the proposal with area break up is given below in table
9
9. Staff Quarters 762.67
10. Parking 4090.06
TOTAL Built up area 17957.18
2.1.5 Accessibility
The study area has a well developed communication network consisting of airport,
railway station, hospitals, National Highways and other district roads and railways. Post
and telegraph facilities seem to be adequate in the study area. Study area is having
primary and high school facilities, primary health center, etc.
The Nearest Airport is Pondicherry Airport (Currently not functioning), which is 30 km
from project site. Similarly Pondicherry Railway station about 28 km, from the site and
well connected to other parts by roadways also.
During Operation Phase: The daily requirement of water will be 167KLD. Fresh water
demand is108 KLD .After treatment of wastewater, treated water will be reused for green
belt (85 KLD), flushing (59 KLD). Water requirement for the project will be met from
external private authorized water suppliers only
10
10
2.2.2 Water Source:
To cater the fresh water requirement the project depends on the external private
authorized water suppliers
During operation, 151 KLD of wastewater will be generated which will be treated in
sewage treatment plants of 144 KLD capacities and the treated sewage will be utilized
for flushing and gardening.
11
11
DG Details
Table 2.5 DG Capacity & Stack Height
S.No DG Capacity No. Stack Height (m)
12
12
2.2.5.1 Fire Extinguishing Systems
All buildings are constructed with fire resistant material to a large extent.
Electrical panels have been provided in each building so that fire occurring at any
point of time does not spread and will get localised.
Fire Retardant Low Smoke (FRLS) wires and PVC conduits are used to prevent
spreading of fire.
Emergency staircase, Refuge area and Assembly area will be provided.
2.2.5.2 Process
Fire extinguishing systems are in place, which are checked thoroughly once in a
quarter and inspected on a daily basis.
All fire fighting equipment are approved by the appropriate regulatory body.
Basically 4 types of fire extinguishing systems are in place.
Mechanical Foam types – General paper, wood, cloth and other carbonaceous
materials; inflammable liquids like oil, gasoline, chemicals, paints and solvents.
Dry Chemical powder - inflammable liquids like oil, gasoline, chemicals, paints
and solvents; gases in the compressed form, electrical and electronic
installations, motors, switch gear; metal-reactive metals, such as magnesium,
sodium and potassium.
CO2 based - General paper, wood, cloth and other carbonaceous materials;
inflammable liquids like oil, gasoline, chemicals, paints and solvents;
inflammable liquids like oil, gasoline, chemicals, paints and solvents; gases in
the compressed form, electrical and electronic installations, motors, and switch
gear.
The electrical system has air circuit breakers, which do help in preventing fires
due to short circuits.
13
2.2.5.4 Wet riser
Wet riser as per N.B.C will be provided in the duct adjoining the staircase/common
corridor with the hydrant outlet and hose reel on each floor, in such a way as not to
reduce the width of the staircase/common corridor. Pressure reducing discs or orifices
will also be provided at lower level. A fire service inlet on the external face of the
building near the static tank directly fronting the courtyards will be provided to
connect the mobile pump of the fire service to the wet riser. The wet riser will be
extended up to the basement level.
2.2.5.6 Hydrant
External hydrants, internal hydrant and landing valves will be provided as stipulated
by N.B.C.
14
2.2.6 Greenbelt Development
It is proposed to have tree plantation along the periphery of the site and also to develop
lawn and greenery inside the project area for 39351 Sqm (59%). The vegetation for
the greenbelt will be selected from the native species adapted to the local environment.
15
3. DESCRIPTION OF THE ENVIRONMENT
16
3.2 ESTABLISHMENT OF BASELINE FOR VALUED ENVIRONMENTAL
COMPONENTS
The project site is located at Manapet Revenue Village, Bahour Commune Panchayat, in
Pudhucherry. The project site adjoins Bay of Bengal being approximately 8 m away from
shoreline. The site is approachable from State Highway 49 – East Coast Road. The local
influence of sea and land breeze phenomena is significant at the project site.
The baseline status of air environment includes identification of specific air pollution
parameters expected to have significant impacts and assessing their existing levels in
ambient air within the impact zone. The baseline status of air environment with respect to
the identified air pollutants can be assessed through air quality monitoring programme
using methodically designed air monitoring network.
There are numbers of well established techniques for measuring the concentration of
pollutants in air. Knowledge of the significant sources of air pollutants is essential before
any action can be taken to improve air quality in a particular area.
17
a) Persistence of wind direction and speed
b) Representation of regional background
c) Inclusion of all the major conventional air pollution parameters
To establish the baseline monitoring status of air environment in the study area during
January - March 2016, 5 AAQM locations were selected using network design criteria
and monitor as per CPCB guidelines (Twice a week sampling and 24 hr continuous
sampling each day) .The selected sampling locations are reported in Table 3.1. The
pollutants were analyzed during ambient air quality monitoring as listed in latest CPCB
notification.
3.2.2.1 Micrometeorology
The study of micro-meteorological conditions of a particular region is of utmost
importance to understand the variations in ambient air quality status in that region. The
prevailing micrometeorology at project site plays a crucial role in transport and
dispersion of air pollutants released from the project. The persistence of the
predominant wind direction and wind speed at the project site will decide the direction
and extent of the air pollution impact zone. The principal variables which affect the air
pollution dispersion and resultant air quality status micrometeorology are horizontal
transport and dispersion (average wind speed and directions), convective transport and
vertical mixing (atmospheric stability) and also topography of the area towards local
influences.
With an objective of determining the prevailing micro-meteorological conditions
during the study period, an automatic continuous recording type digital weather station
was installed at project site and sensors were fixed on an elevated platform to provide
good exposure to free wind flow. The hourly meteorological data of wind speed, wind
direction, temperature and solar radiation were recorded at the project site. These
frequencies were computed on 8 hourly as well as 24 hourly basis and the
corresponding results are used to draw windrose for 00-08hrs, 08-16 hrs, 16-24 hrs and
18
00-24hrs corresponding to study period(winter season) as shown in subsequent
sections.
The 24 hourly windrose shows the predominant winds from W and NW directions
directions during study period. The average wind speed has been observed about 11
kmph with the considerable frequency of higher wind speed range (6-22 kmph). The
ambient temperature at project site varied between 19-37OC during the study period,
while the relative humidity was observed in the range of 83-96% at project site.
The wind rose for the months of January to March 2016 is enclosed below
The concentration values and 24 hourly average PM 2.5 concentrations varied in the
range of 20- 32 µ g/m3 respectively. The maximum concentration was observed at
Pudupattinam and minimum at remaining locations. The PM 2.5 concentrations for all
locations were observed within stipulated standards for NAAQS.
3.2.3.3 Gaseous Pollutants
3.2.3.3.1 Sulfur dioxide and Oxides of Nitrogen
The average concentrations of SO2 were observed in the range of 6-10 µ g/m3
respectively. Similarly, NOx varied in the range of 11.5- 19 µ g/m3. The
19
19
concentrations of SO2 and NOx were observed below the stipulated standards of
NAAQS.
3.2.3.3.2 Carbon Monoxide
Carbon monoxide is a colorless and odorless gas. It is formed when substances
containing carbon are burned with an insufficient supply of air. The combustion of
fuels such as petrol, gas, coal and wood generate emissions of carbon monoxide. Gas
and wood can be used for cooking and heating in appliances like stoves and barbecue
add to its contributions. Apart from it, motor vehicles are also the main source of
carbon monoxide pollution in urban and sub-urban environment.
In order to assess the concentration of carbon monoxide, samples were collected in
Tedlar bags and analysed within 24 hrs by carbon monoxide analyzer based on the
principle of infrared radiation at wavelengths near 4.7 microns. The results of CO are
presented in Table 3.5. The observed carbon monoxide concentrations at all the
locations are below detection limit which is negligible. The values are within the
permissible limits of National Ambient Air Quality Monitoring (NAAQM) standards
for the respective designated areas.
Table 3.1 Ambient Air Quality Stations
Station Name of the Station Distance with respect
Code to Project Site/ Direction
1 Project Site ---
2 Kattukuppam 1.62 Km (W)
3 Villupalayam 5.59 Km (N)
4 Kuruvinatham 6.88 Km (W)
5. Gunduuppalavadi 3.91 Km (SW)
20
20
Figure 3.1 Ambient Air Monitoring Locations
21
21
Chromatograph/Enviro Tech
Sodium Hydroxide Hi-Volume Sampler- Netel
4 NOx
Chromatograph/Enviro Tech
Eurotron 8000 / Gas
5 CO -
Chromatography
Hi-Volume Sampler- Netel
6 Lead EPM 2000 Filter Paper
Chromatograph/Enviro Tech
Table 3.3 Techniques Used For Ambient Air Monitoring
22
22
Table 3.5 Ambient air quality monitoring in the project study area.
The prevailing ambient noise level at a particular location is nothing but the resultant
(total) of all kinds of noise sources existing at various distances around that location. The
ambient noise level at a location varies continuously depending on the type of
surrounding activities. The ambient noise level generally does not reflect any seasonal
variation, however, the wind direction, rain, snow, fog or any other barrier as well as
direction of source play significant role in regulating the noise propagation and ultimately
the intensity of impact.
23
23
The current status of noise environment around the site is assessed through identification
of major noise sources, characterization of such noise sources, measurement of prevailing
ambient noise levels in the study area and measurement of noise levels due to vehicular
movements, according to existing landuse pattern. The prevailing noise levels in the
neighboring community areas shall represent the baseline status for assessment of noise
impacts from proposed developments. The baseline study for noise environment has been
carried out through reconnaissance in the impact zone, identification of representative
sampling locations and monitoring of prevailing noise levels during study period.
3.3.1 Reconnaissance
The site is located in East Coast Road (ECR) which extends from Chennai to Ramnad.
The vehicular traffic on ECR and the road contribute to the noise levels in project area.
The prime objectives of noise monitoring in the study area is to establish the existing
ambient noise levels during the day as well as during the night at residential zones
existing within 10 km radial distance. The terrain of the project site as well as the
surrounding area is under the influence of noise generated by heavy traffic on national
highway and from commercial activities in the individual villages. The noise levels in
surrounding selected villages, ECR were monitored using an imported precision noise
level meter (Larson and Davis, USA, Model 831). The prevailing ambient noise levels
along, ECR and in surrounding villages were monitored at total 5 locations. The details of
the monitoring stations are presented in Table 3.6
The observations related to prevailing ambient noise levels along the boundary limit
along ECR as well as in surrounding villages indicate the community level noise impact
within study area is insignificant.
The field observations during study period indicate that the ambient noise levels in the
study area were well within the prescribed standards for residential areas and silence
zones.
Table 3.6 Ambient Noise Monitoring Stations
Station Name of the Station Distance with respect
Code to Project Site/ Direction
1 Project Site ---
2 Gunduuppalavadi 3.95 Km (S)
3 Bahour 5.37 Km (NE)
4 Villupalayam 5.66 Km (N)
5. Kuruvinatham 6.82 Km (W)
25
25
Figure 3.2 Noise Monitoring Location
26
26
3.4 Water Environment
The existing water resources, both surface and ground water with the corresponding
significance are identified within the study area (10 km radial distance) around project
site. The representative sampling locations for surface water and groundwater are
selected through reconnaissance to assess the existing status of water quality in the
impact zone. Physico-chemical, nutrient, Oxygen demand, bacteriological and biological
parameters having relevance to public health and aesthetic significance are selected to
assess the water quality status with special attention to raw water resource and the
receiving body of the treated effluent keeping in view the discharge from the proposed
project. The standard methods prescribed for surface and groundwater sampling as well
as the analytical procedures for individual parameters is followed in this study.
3.4.1 Reconnaissance
The proposed project comes in CRZ III area. The study area represents rural environment
with sparsely located villages in all directions. The project region falls in coastal humid /
perhumid agroclimatic zone with average annual rainfall of about 1133 mm. There is no
irrigation facility available in the study area. Fisheries practice is predominant in the
project region. Groundwater is the principal resource for domestic and irrigation purposes
in almost all villages in the study area.
27
27
3.4.3 Baseline Water Quality
Physico-chemical parameters alongwith biological indicators of pollution have been
identified for assessing the baseline status of water environment and identification of
impacts due to proposed developmental activities. In order to assess the water quality,
standard methods (APHA, AWWA 2007) were followed for sample collection,
preservation and analysis in the laboratory.
3.4.4 Physico-chemical Characteristics
Monitoring Locations
1. Utchimedu (Ground Water) 2. Manapet (Ground Water)
3. River Chunnambar 4. Sea water Near site
Water samples were taken from the above locations and the results of the same are given in the
following tables.
28
28
B) Sampling Results
River Sea water Drinking
Chunnambar Near site water IS
S.No Parameters Units Utchimedu Manapet 10500: 2012 Method of analysis
(Ground (Ground Permissiblr
Water) Water)
limits
1 Color Hazen BDL BDL BDL BDL Max 5.0 IS 3025;2, P 4 1983
2 pH - 7.95 8.59 7.81 8.0 6.5 – 8.5 IS 3025:2 P 11 1983
Temperature C 29.9 29.7 29.6 29.3 - IS 3025; P9 1983
Conductivity S/cm 2720 2815 29800 39400 NA IS 3025;2 P14 1983
Total Dissolved 23150 36300
mg/l 1480 1280 Max 500 IS 3025:1 P 16 1984
Solids
Salinity PPT 0.69 0.65 31.75 35.84 - -
2 3 5201BAPHA 22 nd
BOD mg/l BDL BDL -
Edn.2012
COD mg/l 4 BDL 3.5 4.6 IS3025 (pt 58)-2006
Total Hardness 4860 6840
mg/l 120 142 600 IS 3025(part 21): 1983
as CaCO3
115 175 IS 3025(part 23): 1986,
Total Alkalinity mg/l 126 148 600
ref-2009
17560 19840 IS 3025(part 32): 1988,
Chlorides mg/l 366 345 1000
ref-2009
29
BDL IS 3025(part 55): 2003,
Aluminium mg/l BDL (DL0.02) BDL (DL0.02) BDL (DL0.02) 0.2
(DL0.02) ref-2009
0.05 0.06 IS 3025(part 49): 1994,
Zinc mg/l 0.15 0.01 15
ref-2009
BDL IS 3025(part 52): 2003,
Chromium mg/l BDL (DL0.01) BDL (DL0.01) BDL (DL0.01) 0.05
(DL0.01) ref-2009
BDL IS 3025(part 42): 1992,
Copper mg/l BDL (DL0.01) BDL (DL0.01) 0.04 1.5
(DL0.01) ref-2009
BDL
Cadmium mg/l BDL (DL0.01) BDL (DL0.01) BDL (DL0.01) 0.003 IS 3025(part 41): 1991
(DL0.01)
BDL IS 3025(part 47): 1994,
Lead mg/l BDL (DL0.01) BDL (DL0.01) BDL (DL0.01) 0.01
(DL0.01) ref-2009
8160 11390 IS 3025, 5 (part 45):
Sodium mg/l 152 165 -
1993, ref-2006
MPN/100 <2 <2 IS 1662, 1981(Reff
Total Coliforms 8 <2 NA
ml 2009)
Per Absent Absent Absent Absent IS 1662, 1981(Reff
E.Coli NA
100ml 2009)
30
3.5 LAND ENVIRONMENT
Impacts on land environment from proposed project, could be mainly attributed to change
in land use pattern (direct and indirect). Accordingly for impact assessment on land
component., it is pertinent to study the existing landuse pattern in project area, soil
characteristics and details of waste generation from the project activities including the
resulting impacts on soil with respect to land application/disposal of solid hazardous
wastes and the of the surrounding terrestrial and aquatic environment.
3.5.1 Reconnaissance
The proposed project area is located in CRZ III. The surrounding study area (10 km
radial distance) falls in coastal belt of Bay of Bengal. Major part of the study area is
covered with terrain. The study area is surrounded by sparsely populated villages.
The project area in east coast (plain) falls in hot humid zone receiving about 1133 mm
average annual rainfall. The mean ambient temperature varies in the range; 21.1 0C –
36.10C with the extremes of 15.90C the lowest and 39.00C the highest temperature. There
are no reserve forests in the study area (10 km radius) and also no sensitive locations.
3.5.2 Baseline Data
Keeping in view the proposed activities at the site, the baseline data related to nature &
quality of soil, landuse and cropping patterns in impact zone are collected through field
survey and available data sources including project proponents. To assess existing soil
quality, total 4 samples villages were identified within 10 km radial distance around the
project site. The list of villages and the corresponding directions and distances from the
project site and the relative locations are depicted in following tables. Representative soil
samples at each site were collected from (0-20 cm) depth. Standard methods have been
followed for analyzing the oil samples for physico-chemical, bacteriological
characteristics and parameters related to agriculture productivity.
31
Air-dried and sieved samples have been used for determination of physical properties of
soil. The particle size distribution of the soil samples collected from different villages in
terms of percentage sand, silt and clay are presented in following sections. The other
physical characteristics, viz. bulk density, porosity and water holding capacity are also
presented in following sections. The bulk density of the soil in the study area has been
found in the ranges: 1.2-1.4 g/cm3.
3.5.4 Chemical Characteristics
The chemical characteristics of soil were determined by preparing saturate expact of soil
with distilled water in 1:2 ratio (as per Jackson procedure, 1967). Organic matter was
determined in terms of organic carbon by Walkely & Black method (1972). Fertility
status of soil in terms of available nitrogen, phosphorus and potassium were determined
by extracting soil with KCL, sodium carbon and ammonium acetate (FAO Soils Bulletin,
38/2 Rome) and Olsen‟s method (1954) respectively.
Specific chemical parameters were selected for determined soil characteristics. The
parameters selected were pH, electrical conductivity, soluble anions and cations, nutrients
and organic matter content. These results are presented in subsequent setions.
The pH of soil is an important factor which indicates the soil reaction. The pH of most of
the soil samples is acidic to neutral (5.6-7.3). The pH of the soil at project site is slightly
basic and conducive for plant growth.
3.5.5 Heavy Metals
The heavy metals occur in the solution as cations and are associated by the negatively
charged soil particles. They are held strongly as complex on the surface of clay domino
silicates hydrated oxides and humus. In general, adsorption increases with pH. Heavy
metals pollution is serious because it can persist for many decades. The heavy metals also
create problems in the nutrient utilization in plant and also marked reduction in
chlorophyll content.
Soil samples were also analysed for heavy metals such as Zinc (Zn), Lead (Pb), Boron
(B), Manganese (Mn), Iron (Fe) and Copper (Cr) and their concentration are presented in
subsequent sections. The presence of heavy metals at proper pH enhanced the microbial
activity for soil.
32
32
Table 3.9 Soil Sampling Locations
S.No Locations
1 Project Site - S1
2 Kattukuppam – S2
3 Gunduuppallavadi – S3
4 Villupalayam – S4
5 Bahour – S5
33
33
Table 3.10 Soil Test Results
S.No Parameter Unit soil 1 Soil 2 Soil 3 Soil 4 Soil 5
Electrical
Condutivity µS/cm 112 102 92 109 108
(1:2.5)
3
Organic
% 0.365 0.398 0.228 0.445 0.438
4 Carbon
Organic
% 0.629 0.686 0.394 0.766 0.754
5 Matter
6 Nitrogen as N % 0.066 0.050 0.105 0.055 0.029
7 Phosphorus % 0.03 0.02 0.05 0.02 0.01
8 Potash % 0.21 0.17 0.30 0.20 0.06
1 Forests 23856
34
34
3 Land put to non-agricultural uses 146085
10 Total 443210
3.5.7 Seismicity
As per the Seismic zonation map enclosed, Pondicherry falls under Zone II (Least
Active). Suitable seismic coefficients in horizontal and vertical directions will be adopted
while designing the structures.
35
Plants and animals are more susceptible to environmental stress. A change in the
composition of biotic communities is reflected by a change in the distribution pattern,
frequency, density and abundance of natural species of flora and fauna existing in the
ecosystem. These changes over a span of time can be quantified and related to the
existing environmental factors. Assessment of area surrounding the site for plant and
animal species was carried out by field survey and collecting the available information
from authentic sources.
3.6.1 Reconnaissance
The study area for the Biological Environment for this project area was divided into two
sectors with an interval of 5km between the sectors. Ecological studies were carried out
by dividing the study area into four equal quarters (four quarters in the first 5 km circle
and four quarters in the 5-10 km circle).
3.6.2 Vegetation Analysis
The analysis of the results of vegetation in the entire 10 km radius of the site indicated
that there was an abundance of plant community in the entire area and its distribution
was heterogeneous. Since the project is construction of Beach Resorts, the impact on
biological environment will be less. Flora inside the premises was shrubs and bushes.
The presence of dry deciduous floral species in the region indicated that the study area
had low soil fertility. The availability of water was good, but because of the sandy loam
texture of the soil, the water holding capacity of the soil was low. This was conspicuous
36
36
due to the presence of Spinifex spp and other thorny shrubs. These results were well
supported by the IVI values and the Raunkiaer‟s frequency tables.
3.6.3 Terrestrial Flora
The natural vegetation of the area may be broadly noted under two types: the hilly
vegetation and river bed vegetation, apart from roadside and avenue trees. Observations
on the Trees, Shrubs, Herbs, climbers, grasses, agricultural fields, medicinal plants, and
social plantations were made. The vegetation cover falls into following broad categories:
Natural vegetation
Grass lands
Aquatic flora
Agriculture fields
Social Plantations
37
37
10. Cassia siamea -
11. Casuarinaceae Casuarina equisitifolia* Casuarina
12. Euphorbiaceae Bridelia retusa Gurige
13. Fabaceae Butea frondosa* Palasha
14. Dalbergia latifolia* Beete
15. Lythraceae Lagerstroemia speciosa Holenandi
16. Meliaceae Azadirachta indica* Neem
17. Mimosaceae Acacia concinna* Seege
18. Myrtaceae Eucalyptus globulus* Nilgiri
19. Palmae Cocos nucifera* Narial
Shrubs
20. Asclepidaceae Gymnosporia Montana*
21. Celastraceae Maytenus emarginata
22. Euphorbiaceae Jatropha curcas*
23. Jatropha gossypifolia
24. Ricinus communis
25. Fabaceae Sesbania grandiflora
26. Flocourtiaceae Flacourtia indica
27. Malvaceae Hibiscus cannabinus*
28. Rubiaceae Atalantia monophylla
29. Atalantia racemosa
30. Verbenaceae Lantana camara
Vitex nigundo* Lakkili
Herbs
31. Acanthaceae Barleria prionitis*
32. Dipteracanthus prostrates
33. Justicia simplex*
34. Tiliaceae Grewia hirsute*
35. Apocynaceae Cathartanthus pusillus*
36. Vernonia cinerea
38
37. Caesalpinaceae Cassia occidentalis*
38. Cassia tora*
39. Convolvulaceae Evolvulus alsinoides*
40. Fabaceae Tephrosia purpurea*
41. Zygophylaceae Tribulus terrestris*
Grasses
42. Cyperaceae Fibristylis aphylla*
43. Fimbristylis miliacea
44. Poaceae Cynodon dactylon*
45. Apluda mutica
46. Aristida funiculate
47. Aristida hystrix
48. Aristida setacea
Table 3.13 Mammals in Study Area
Sr. No. Zoological Name Common Name
1. Funambulus* Squirrels
2. Herpestes mungo* Mangoose
3. Lepus ruficaudatus Hare
4. Oryctolagus cuniculus Rabbit
5. Pteropus* Bat
6. Rattus rattus* Rat
39
7. Spilornis cheela Eagle
8. Streptopelia chinensis Dove, Spotted
9. Streptopelia senegalensis Dove, Little Brown
10. Sturnus pagodarum Myna
11. Treron phoenicopteras Pigeon, Common green
40
4. ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
4.1 INTRODUCTION
The Study of Impact is necessary to identify and assess various environmental impacts
caused on the existing environs due to the proposed project, with a view to arrive at an
objective assessment of the possible harmful fall-outs and to plan necessary corrective and
remedial measures well in advance to contain these within the prescribed limits set by
Ministry of Environment, Forests & Climate Change (MOEF&CC) and Pondichery
Pollution Control Committee (PPCC).
41
4.3.1 Impact during Construction Phase
For the proposed construction of Beach Resort, construction site is limited to 200-500m
from the HTL line. Flora affected due to construction activities shall be replanted during
the construction stage itself and maintained till they achieve sufficient growth. It shall be
ensured to maintain the ground level of the project area.
4.3.2 Impact during Operational Phase
Proposed activity will lead to permanent change in land use. However restoration of
existing trees will be taken up.
42
These impacts will not be felt in areas, which are not in the immediate vicinity of the
proposed project. As such the impacts during the constructional phase on various
environmental factors will be extremely marginal.
43
4.6 IMPACT ON COASTAL REGULATION ZONE (CRZ)
As per the Environment (Protection) Rules, 1986, the Central Government has
declared the coastal stretches of sea, bays, estuaries, creeks, rivers and backwaters
which are influenced by tidal action (in the landward side) up to 500 metres from
the High Tide Line (HTL) and the land between the Low Tide Line (LTL) and the
HTL as Coastal Regulation Zone (CRZ), which is compiled as CRZ Notification,
2011 (Annexure 3) and its amendment. As per approved the Coastal Zone
Management Plan, the area of the proposed site falls in CRZ III, Proposed location
is near to Bay of Bengal.
The development or construction activities in different categories of CRZ area
(CRZ I,II,III, & IV) shall be regulated by the concerned authorities at the state /
Union Territory level, in accordance with the MoEF&CC norms.
* Applicable Classification
As per CRZ notification, 2011, the proposed “Beach Resort” requires CRZ clearance
from MOEF&CC. As per the said notification, Rapid Environmental Impact Assessment,
Risk Assessment and Disaster Management Plan are to be submitted with Form 1 for
clearance.
44
Protective measures like earplug / ear muffs will be provided in noise generating areas
and this would mitigate impact on construction workers.
Conclusions
Hence there is not much impact on the Aquatic Environment during both construction and
operational phases.
45
4.9.2 Impacts of operational phase
During oprational phase, organic waste and inorganic waste will be generated. Organic
wastes will be treated in organic waste convertor and it will be reused as manure for
gardening and inorganic wastes will be disposed through authorized vendors.
Conclusion
Hence the impact on the soil environment will be negligible during construction and
operational phases.
46
scenarios. The environmental impact assessment process involves four basic steps of
Identification
Evaluation
Interpretation
Communication
A number of techniques are available for the assessment of impacts. Each of these
techniques has its own advantages and disadvantages. The selection of any of these
techniques for any particular project depends largely upon the choice of judgment of the
analysis. The technique chosen should be comprehensive, easy to understand, systematic
and flexible. Considering these criteria for this project, the matrix method was used, with
an impact scale of -4 to +4.
the total impact of all project activities on each component. Similarly, the scores in
individual cells in each row are added to determine the total impact of each activity on all
the environmental components likely to be affected. Grand total of all cells indicates the
total project impact. This can be represented by the following equation:
47
Total project impact= m ijw ij
where
th th
mij = (positive or negative) magnitude of the j activity on the i environmental
component and
th th
wij = importance of the j activity on the i environmental component
Since both m and n vary from 1-4 the total score in each cell can theoretically vary
between -16 and +16, therefore the total project impact can vary between (-16* total
number of cells in the matrix) and (16*total number of cells in the matrix), to compare
scores from the matrices containing different number of cells, the total project score can
be normalized to a scale of 100 as follows:
0 to 25 Minimally beneficial
25 to 50 Appreciably beneficial
50 to 75 Significantly beneficial
48
48
75 to 100 Very highly beneficial
49
49
Environmental components likely Activities likely to affect Environmental components
to be affected
Construction Vehicular DG Set Impacts on
Activities Movement Operation components
Soil Quality Magnitude - - - -
Importance - - - -
Flora and Fauna Magnitude - - - -
Importance - - - -
Aesthetics Magnitude - - - -
Importance - - - -
Land use Pattern Magnitude -1 - - -1
Importance -1 - - -1
Human Health Magnitude -1 - - -1
Importance -1 - - -1
Employment Magnitude 2 - - 1
Importance 1 - - 1
Total impact of activity -4 -4 - -2
Total impact of activity on a scale of 100 -10
Table 4.2 Impact Assessment Matrix for Scenario 2 (Project without EMP)
Activities likely to affect Environmental Components
Environmental Components likely Construction Vehicular DG Set Impacts on
to be affected Activities Movement operation components
Visibility Magnitude - - - -
Importance - - - -
Air Quality Magnitude - -1 -2 -
Importance -1 -1 -1 -2
Noise and Vibration Magnitude -2 -2 -2 -5
Importance -2 -1 -2 -4
Surface water quality Magnitude - - - -
Importance - - - -
Ground water quality Magnitude - - - -
Importance - - - -
Soil Quality Magnitude - - -1 -
50
Importance - - -1 -
Flora and Fauna Magnitude -2 - - -
Importance -2 - - -
Aesthetics Magnitude 1 - - 1
Importance 1 - - 1
Land use Pattern Magnitude -1 - - -1
Importance -1 - - -1
Human Health Magnitude 2 - - -1
Importance 2 - - -1
Employment Magnitude 4 3 - 5
Importance 4 3 - 5
Total impact of activity 3 1 -9 -3
Total impact of activity on a scale of 100 -8
Table 4.3 Impact Assessment Matrix For Scenario 3 (Project With EMP)
Environmental Components likely Activities likely to affect Environmental Components
to be affected
Construction Vehicular DG Set Impacts on
Activities Movement operation components
Visibility Magnitude - - - -
Importance - - - -
Air Quality Magnitude 1 1 - -
Importance 1 1 -2 -
Noise and Vibration Magnitude -2 -2 -2 -2
Importance -2 -1 - -2
Surface water quality Magnitude - - - -
Importance - - - -
Ground water quality Magnitude 2 1 - 3
Importance 1 1 - 2
Soil Quality Magnitude 2 - - 2
51
Environmental Components likely Activities likely to affect Environmental Components
to be affected
Construction Vehicular DG Set Impacts on
Activities Movement operation components
Importance 2 - - 2
Flora and Fauna Magnitude 2 - - 2
Importance 3 - - 3
Aesthetics Magnitude 2 - - 2
Importance 2 - - 2
Land use Pattern Magnitude 1 - - -1
Importance 1 - - -1
Human Health Magnitude 1 - - -1
Importance 1 - - -1
Employment Magnitude 3 3 - 2
Importance 4 3 - 2
Total impact of activity 25 7 -4 -
Total impact of activity on a scale of 100 + 14
52
52
5. ENVIRONMENTAL MONITORING PROGRAM
5.1 INTRODUCTION
The Environmental Monitoring Program is laid out based on the following definition of
environmental monitoring:
“Environmental effects monitoring is the repetitive and systematic measurement of
thecharacteristics of environmental components to test specific hypotheses of the effects
of humanactivity on the environment. Environmental monitoring is undertaken primarily
to determine theenvironmental effects of human activities, and secondarily to increase
understanding of cause-effect relationships between human activity and environmental
change.”
In order to meet the above objectives the following parameters need to be monitored:
53
53
Afforestation;
Water Quality and Public Health;
Air and Noise quality;
Soil Conservation;
Waste Disposal.
Quarterly
Site (One upwind
Ambient Air
1. &one downwind 24 hourly period PM 10, PM 2.5, SO2 and
Quality
location) NOx and CO
8 hr period
Physicochemical properties,
5. Soil Site Once in a year
Nutrients, Heavy metals
54
54
chemicals
Regular and periodic record shall be kept in order to ensure easier, comparable and brisk
review and projection of past, present and future performances. Also, the management
shall ensure to prepare separate records for water, wastewater, solid waste, air, emission,
soil & manure regularly and periodically in order to provide better and smooth vigilance.
The management shall look into the fact that as soon as the preparation of reports gets
over it shall be forwarded to the concerned authority with due care for the purpose of
reviewing.
Adhering to the rules and regulations the management shall ensure that the outcome of
reports and conclusions drawn shall be prepared as per the laid down regulations and
procedures.
55
55
6 RISK ASSESSMENT, EMERGENCY RESPONSE AND DISASTER
MANAGEMENT PLAN
56
56
form an inherent part of life. Some risks are readily acceptable while some much less
frequent risks that attract lot of attention and are unacceptable to public.
The influences of various factors on the public perception of risk are summarized in
Table 6.1 as follows:
Table 6.1 Factors Influencing Public Perception
Sr. Factors influencing Description
No. public perception
1 Control People are more willing to accept risks they impose upon
themselves than to have risks imposed upon them.
2 Dread and scale of Fear is greatest where the consequences of risks are likely to be
Impact catastrophic rather than spread over time.
3 Familiarity People appear to be far more willing to accept risks that are
familiar rather than new risks
4 Timing Risks are more acceptable if the risk consequences are
immediate or short-term, rather than delayed consequences
5 Social amplification & Concerns are increased if media coverage or graphic depiction of
attenuation events is there, reduced if there is economic hardship
6 Trust If public trusts policy makers, public trusts regulators or industry
as being honest, admit mistakes and limitations and one who take
into account different views, then public is more likely to place
credibility in them.
Source: British Parliamentary Office of Science and Technology – “Safety in numbers - Risk
Assessment & Environment Protection”
The need for communicating acceptable risks is very important. Though setting acceptable
criteria for use in quantitative risk assessments may often lead to disagreement between parties,
nevertheless sound techniques and methods have led to the definition of acceptable levels of
risks taking into account the need of people to feel safe in their day-to-day activities.
A risk assessment should therefore, be seen as an important component of any or all ongoing
preventive actions aimed at minimizing and thus hopefully, avoiding accidents. Re-assessments
should therefore follow at regular intervals, and/or after any changes that could alter the hazard,
so contributing to the overall prevention programme and disaster management plan of the
project.
57
57
possibilities and combinations in process risks. The basic methodology adopted for risk
assessment is generally based upon the nature of the hazard, the basic need for
conducting risk assessment and the information and resources available for such risk
assessment.
There are many methods that can be used to assess and rank risks. Some of the methods
and ranking system are listed below:
The method rates the scenarios on the basis of expected severity of incidence and the
probability of occurrence. The legend given indicates the level of severity for the colour
coding adopted.
Legend
58
58
Environmental: Event having serious on-site or off-site impact, results in offsite
agency involvement and a major fine, serious negative public health or financial
impacts, major local negative media coverage, international negative media
coverage.
Facility: Major or total destruction to process area(s)
SIGNIFICANT INCIDENTS:
Personnel: One or more severe injury
Community: One or more minor injuries
Environmental: Event having significant on-site or off-site impact and requiring
prompt agency and corporate notification, serious negative public impact or
perception, significant local negative media coverage, a fine is likely.
Facility: Major damage to process area(s)
MINOR INCIDENTS:
Personnel: Single injury, not severe, possible lost time.
Community: Odour or noise complaint from public
Environmental: Event results in agency reporting or consent violation, minor
negative public impact or perception, little or no local media coverage, a fine is
not likely
Facility: Some equipment damage
INCIDENTAL INCIDENTS:
Personnel: Minor or no injury, no lost time
Community: No hazard to public, no public complaint
Environmental: Environmental event with no agency involvement or consent
violation, no negative public impact or perception.
Facility: Minimal equipment damage
Another method that can be used for the classification of incidence and used for
risk analysis is the NIOSH method. The NIOSH method gives in brief the
methodology and the hazard risk matrix to assess the risks posed by use of
hazardous substances.
METHODOLOGY:
List of all possible hazards that exist in the study area.
59
59
Assessment of all the possible hazards that exist in the study area.
Selection of the identified hazards for consequence analysis.
Consequence analysis of the identified areas.
The hazard risk matrix is a useful tool to accord a risk rating for each hazard
identified in terms high, medium or low. The hazard risk matrix is illustrated
below.
Hazard Risk Matrix
1. Hazard:
2. Potential Location:
60
60
The hazard identification is done to list all of these safety cautions that are to be taken
while handling, storage or use of these chemicals. Special care has been taken to avoid
clustering all the information so that only those safety aspects are mentioned which are
of relevance to this company and its range of chemicals.
6.3.3 General Hazards
All the probable potential hazards are classified under different heads.
i. Spillage Hazards
ii. Toxic vapor release hazards
iii. Explosion or accident hazards
iv. Corrosion hazards
v. Natural Calamities
61
61
Table 6.4 Risks and Operational Hazards from the proposed project
Scenario Effects
During Construction Accidents to workers working at Might cause injury to workers
Phase a height
Spillage of construction material Might cause water and soil
like concrete, cement, chemicals pollution
,etc
During Operation Natural calamities like Might cause damage to
Phase Cyclones, Earth quakes structures, leading to injury to
nearby flora and fauna
Human tampering Might cause damage to
structures
62
62
Thus the element of successful hazard management can be identified as:
a. Reliable early detection
b. Careful planning
c. Efficient personnel
d. Adequate technical facilities
e. Effective communication
f. Ensuring correct responses
g. Proper training to all concerned personnel
Each employee should study the approved on- site emergency control plan very
carefully to carry out the instructions set forth. The main controller, the incident
controller and the safety officer with the help of the Emergency Squad will be
responsible for the effective execution of the on- site emergency plan.
The Puducherry, Karaikal and Yanam regions are situated in the east coast and has a flat
terrain. But the Mahe region is in the west coast with hilly terrain. The entire territory is prone
to multi Hazard disasters viz., Predictable disasters, unpredictable disasters and Other disasters.
Puducherry alone has 24 km of coastline. The major part of this union territory lying on the
coast of Bay of Bengal influenced by North East Monsoon. Hence puducherry is prone to
many disasters.
The following table shows the type of recent disaster encountered in Puducherry.
S.No. Type of Description year fatalities
Disaster
1. Earthquake 5.2 magnitude, 10 km depth in 2001 No death toll
sea, only tremors
were felt.
2. Floods & During North east monsoon 2005 5
Cyclone
3. Floods & Due to Whirl wind occurred 2008 4
Cyclone
4. Cyclone At yanam during August 2007 2
5. Tsunami 9.0 magnitude quake was 2004 601
63
63
located in the Indian Ocean near
the west coast of
Sumatra,Indonesia.
Regular inspection
64
64
Provision of toe guards to prevent items from
rolling over the edge
foundation, suitability
slippery sideways.
availability of extinguishers
emergency procedures
emergency procedures
Regular inspection
65
6.5.2 Safety Plan
During construction, safety is an important factor for all personnel working at the site.
During excavation and erection of proposed facility, the project authority shall formulate
safety policy with the following regulations:
To provide necessary equipment, safety appliances and to ensure their proper use.
To ensure that all safety factors are taken into account in the design, construction,
operation and erection machinery and equipment
To provide training in fire fighting operations
To notify regulations, instructions and notices in the common language of
employees
To prepare safety rules for the employees as per the safety policy
To allocate sufficient resources to maintain safe and healthy conditions of work
6.5.3 Safety Training
A training center shall be set up for the employees. Safety officers will be provided
training by the faculty members from the corporate center and Industrial safety
Institutions. Some remedial measures proposed to be adopted to prevent the hazards are:
Reliable type of fire detection system with proper zoning
Every employee shall cooperate and actively participate in maintaining and
improving safety standards
Proper fire watching by all concerned would be ensured.
Safety officials shall prepare a leaflets regarding safety awareness and shall
conduct safety awareness programme.
6.5.4 Natural disasters
On Site Emergency Management Plan
Earthquake
Spatial and temporal impacts of earthquake are large. Resource requirements are both
intensive and extensive for management of earthquake. Though the project impact area
comes under seismic zone- II, the probability of occurrence of earthquake in future is not
ruled out. In the case earthquake occur, following management plan will be adopted:
66
66
Fire
Since the proposed site is located very close to coastal plain of seashore, the area is highly
susceptible to coastal flooding.
Inundation by the sea on coastal areas is potentially caused by unusually high tide,
storm surge, hurricanes (cyclonic storms) and wave activity including tsunamis. Coastal
floods may also be caused by structural failure of defences with some locations
subject to combinations of tidal and river impacts. Long-term processes like
subsidence and rising sea level as a result of global warming can lead to encroachment
of the sea on land.
Floods:
Floods are among the most common and destructive natural hazards causing extensive
damage to infrastructure, public and private services, the environment, the economy and
devastation to human settlements. Floods usually are local, short-lived events can
happen suddenl y and sometimes with little or no warning. They usually are caused by
intense storms that produce more runoff than an area can store or a stream can carry
within its normal channel.
67
67
• Suitable steps on war footing basis need to be
adopted to restore all the essential services like,
electricity, water and food supply,
telecommunication, transportation, etc. Proper steps
should also ensure the protection and safeguard of
properties.
• Damage to road access due to landslides/land
subsidence would need immediate clearing for
which operations in close coordination with the
concerned departments/agencies in the district will
have to be made. Areas indicating signs of
liquefaction should be declared out of bounds and
district vigil should be kept to prohibit trespassing.
• Foundations of the structures prone to
liquefaction will require technical
assessment.
• Alteration in the river, creek and canal water
flow that may inundate the site areas would
require immediate evacuation of people and
properties in coordination with the district
authorities.
68
for which assistance of the local fire service
authorities to be sought.
• Emergency medical attention will be extended
to the affected / injured persons immediately.
69
• Get extra food, specially things which can
be eaten without cooking or with very little
preparation. Store extra drinking water in
suitable covered vessel.
• Check on everything that might blow away or be
torn loose. Kerosene tins, cans, agricultural
implements, garden tools, road signs and other
objects become weapon of destruction in strong
winds. Remove them and store them in a covered
room.
• If the centre of' „eye' of the storm passes directl y
over your place, there will be a lull in the wind
and rain, lasting for half an hour or more. During
this period stay in safe place. Make emergency
repairs during the lull period if necessary, but
remember that strong wind will return suddenly
from the opposite direction, frequently with even
greater violence.
• Remain in shelters until informed by those in
charge that they may return home and report the
losses to the appropriate authorities.
Details of district profile with potential disasters and areas prone to it are mentioned
along with district level DMP measures. Check if project area comes in any of the
areas prone to natural disasters.
Despite all efforts and the measures provided for, it is within the realm of possibility that
emergencies and accidents can take place. The primary objective of Emergency
Management Plan is to defend the men, material and property against such hazards
and restore normalcy as soon as possible. An Emergency Management Group (EMG)
is thus constituted with such objective and to provide help to those in need in the times
of disaster. The EMG constitutes of personnel having various duties and responsibilities
which work in tandem with each other and proper hierarchy to mitigate the adverse
impacts of disasters and return to normalcy with immediate effect. All the personnel of
EMG operate through Emergency Control Centre (ECC) that is a nodal point for all
communications and record of observations and data logging.
70
KEY PERSONS AND RESPONSIBILITIES
For effective handling of the emergency, there will be a designated Site Main
Controller (SMC), Work Incident Controller (WIC) and various other key persons. The
key responsibilities of all the personnel that form the part of EMG are as follows:
Safety Coordinator
The Safet y Coordinator would assist the WIC in removal of unsafe situations and act as
overseer to monitor that all the activities for emergency management are performed
safel y and will not escalate the situation.
71
Medical Officer
The M.O. will rush to the scene of emergency on receipt of information and ensure that
casualties are receiving adequate help. The WIC is to be informed of the steps taken
and seek advice for further mobilization of medical resources from within and outside the
site.
Maintenance Support
Officer
He will provide assistance as per the demand of WIC / Safet y Officer and will be
responsible for electrical supply cut-off / restoration and other mechanical and workshop
help.
Area Staff
They will ensure removal of non essential workers to the assembly points and will
facilitate Roll
Caller to verify the causality.
Running Messengers
Running messengers will act as per the direction of respective key
personnel.
Employees
All the employees are responsible to inform their section in charge about the mishap. The
employees of the emergency area except involved in the emergency handling must
assemble at the designated assembl y points.
72
Technical Coordinator
The persons in charge of the respective sections are designated as Technical Coordinators.
They will ensure that all operations are put in safe and standby condition.
Utilities Coordinator
The utilities coordinator will hold the responsibility of examining and assessing the
requirement of water for the purpose of fire fighting and other requirements like
drinking and processing water. If required, he will shut down the main power supply to
the site and arrange for safe backup power in the affected area and the emergency control
center.
Transportation
Coordinator
The transportation coordinator will have the responsibility of ensuring that all vehicles
are in good state of repair and maintain a log of all vehicle movement and remain
standby for any immediate situation.
Communication
Coordinator
Communications officer will provide information to the emergency services as directed
by SMC and shall have all available means and messengers to communicate.
EMERGENCY PREPAREDNESS
In addition to planning and delegating responsibilities to the identified key persons, the
proposed land parcel will be adequatel y equipped in terms of safet y equipment and
facilities in order to be completel y prepared for combating emergencies.
73
systems (smoke detectors) and will be equipped with fire extinguishers. The land parcel
will be equipped with an adequate fire hydrant system.
Personal Protective
Equipment
The PPEs act as last line of defense and provide physical protection to the
personnel. Sufficient supplies of PPEs like helmets, gloves, ear muffs/plugs, face
mask, fire escape masks, water gel blankets, goggles etc. will be maintained at the
proposed site.
Communication System
Communication facilities play a key role in notification, coordination and even for
calling external help during emergency situations. In view of this, adequate
communication arrangements shall be made as given below:
• External telephones
• Facsimile
• Internal telephones in all
sections
• Public Address
System
• Walkie-talkies
In addition to the above, a siren with adequate audible range to cover the entire site will
be available.
Training
Workers will be trained in fire-fighting and safet y aspects through demonstration exercises
and mock- drills.
It has been observed that pre-planned and practiced procedures for management of
emergency substantially reduce the damage potential of an accident. Thus, for any facility
74
it is necessary to have clear-cut procedures for different functions of emergency planning
and management.
All occupants within the land parcel will be authorized to report the emergency. If the
incident is of a serious nature, the security in-charge of the shift will contact the site in-
charge to report the situation
who will then mobilize suitable personnel to asses the situation and declare the
emergency accordingly. The SMC shall perform the following broad duties:
• Emergency Shut
Down
• Accounting of
Personnel
• Evacuation
• Rehabilitation
• Inform relatives of the affected
people
• Terminate the emergency
procedures
75
relating to the nature, quantum and probable consequences on the neighboring
population.
The off-site plan in detail will be based on those events which are most likel y to occur,
but other less likely events which have severe consequence will also be considered.
Incidents which have very severe consequences yet have a small probability of
occurrence should also be considered during the preparation of the plan. However, the key
feature of a good off-site emergency plan is flexibility in its application to emergencies
other than those specifically included in the formation of the plan.
The main aspects which should be included in the off-site emergency
plan are:
• Organization/
hierarchy
• Communication
systems
• Specialized knowledge experts or
agencies
• Voluntary
organizations
• Meteorological
information
• Humanitarian
arrangements
• Public information
• Assessment of emergency
plan
76
Line of Action
Earthquakes are situations that do not affect a particular identified location. Thus, after
the earthquake the SMC will perform the following duties-
• Patrolling of sensitive locations and the entire facility
• Instruct communication officer to contact all department heads to give
status of their respective areas, men and machinery.
• If any help is sought at some place, mobilize the resources accordingly
• Immediate attendance of all the staff and visitors
77
necessary to develop an appropriate response mechanism, which would act in close
coordination with the District Collector / DDMA of the district. For this purpose, the
authority should set up a Disaster Management Cell with a small team of dedicated
personnel trained in relief and rescue operations required for the anticipated
emergencies. In addition to the above the following should be undertaken by the
authority.
• Extensive afforestation programme will be undertaken with appropriate native
species as per guidelines of CPCB.
• Timely warning to the local residents will be made through an effective
communication system.
• Timely alerting the key personnel in Disaster Management Cell of the district
for taking emergency action.
• A Disaster Management Committee will be set up involving all the stakeholders
particularl y the local community and NGOs and a list of personnel with allocated
responsibilities will be kept at the office and in all the concerned local body
offices.
• All power supply lines and connections, public address systems, etc. will be
thoroughly checked before onset of the monsoon months and special mock
drills should be will be organised to put all concerned on alert.
• The administrative machinery of the project along with local NGOs will
organize regular awareness campaigns with the help of the local authorities where
women and school children from the community should be involved. Involvement
of NGOs is necessary in mobilizing community efforts for the control of
epidemics by ensuring standards of environmental sanitation, disposal of waste
and personal hygiene.
• The buildings in the project site will be allowed to be used as safe
shelters during emergencies.
• Volunteers‟ Handbook for Disaster Preparedness of the UNDP will be
circulated during awareness campaigns.
The policy of the Govt. of India emphasizes on sustainable disaster/risk reduction in all
states/UTs by building capacities at all levels to institutionalize disaster risk management in
the country. For strengthening the overall capacities for emergency/disaster response in the
country, the Govt. of India is systematically assessing the existing systems at the national,
state and district levels. Mock drills with the community should be carried out regularl y
which may be helpful while formulating the disaster response mechanism by the authorities.
78
7 ENVIRONMENT MANAGEMENT PLAN
79
clearance is a statutory requirement for any project of which EIA has to be prepared and
submitted to respective agencies of State and Central level in line with Coastal
Regulation Zone Notification, 2011 and its amendments /Environmental Impact
Assessment Notification, 2006 and its amendments.
80
EMS provides a structured framework for identifying and meeting regulatory
requirements these results in fewer fines and other regulatory complications over
time which would avoid legal risk and potential liabilities;
Improved bond ratings as a formal EMS can demonstrate to the lenders a reduced
risk that results in lower interest rates;
EMS increases profit, improving environmental performance, through more
efficient operations;
EMS does not impose new technical requirements, nor do they act as a substitute for
existing regulatory requirements. EMS provide an exclusive way for an organization to
manage its maximum possible environmental efficiently and to minimize obligations. As
a result EMS can improve any organization‟s overall environmental performance
including areas not subject to legal requirements. It can also help organizations to
improve cost efficiency and health and safety management.
81
Each organization has to achieve environmental protection objective and each
organization comprises of individual operations and affairs hence each organization
requires its own unique Environmental Management Plans. The component and content
of individual EMP varies to suite type of organization, the complexity of its processes
and the maturity of the organization in understanding its environmental responsibilities.
The level of detail and length of an EMP will vary depending on the type as well.
An EMP consists of:
Environment Protection Plan to reduce impacts and risks. Issues related to existing
legislation, codes of good engineering practice, proponent commitment, and similar
other tasks are also discussed here.
Summary of Impacts and Risks. These are the actual expected impacts and risks of
the projects, which will need to be managed, monitored, and reported.
Impact Management and Environmental Enhancement to balance adverse impacts
by providing alternate benefits to adversely impacted persons or biophysical
systems.
Environmental Effects Monitoring (monitoring plans).
Impact Reporting.
Addition sections of this chapter document:
Implementation of Environmental Management Plan
Institutional strengthening needs
Training and technical assistance needs
Public participation
EMP Implementation Schedule
EMP Costs
82
systematically managed. EMPs, which are often a key component of a project's
regulatory filings, provide the basis for assurance that environmental factors will be
carefully managed throughout the project lifecycle.
83
7.3 MITIGATION FOR PRE-CONSTRUCTION AND CONSTRUCTION PHASE
IMPACTS
7.3.1 Land acquisition and site preparation
The construction and development of required infrastructure will become core factor for
setting up the project. The site preparation and construction will not generate any major
negative impacts on the regional environmental conditions. In addition, the impacts on
the regional aspects like population affected, land and allied abiotic & biotic factors of
environment would be negligible. The impacts can be further minimised through
effective selection and designing of environment management plans, proper resource
allocation in order to minimise negative land use change and to use infrastructural sites of
least value in current use. Also, proponent has proposed to develop sufficient greenbelt
area to add value to the improvement of land cover of the area thus, major mitigation
measures are not required.
7.3.2 Construction activities
Construction and infrastructure development can change the land use for long term which
will create harmful and/or useful impacts to the environment. Therefore construction
activities are one of the most concern tasks for environmental aspects to be considered
during implementation of any project. The major concern while implementing an EMP of
an organization incorporates adverse impacts. For this purpose detailed information shall
be collected viz. details of the components responsible for the occurrence of the negative
impact, activity operation involved which led to occurrence of such impact, construction
material responsible, emissions from construction vehicles, prevailing geographical &
ecological conditions as well as other allied factors which have concern with occurrence
of adverse impacts. These mentioned details are the most significant part of EMP as they
provide core structure of the EMP. Depending upon the analysis and result of these
details proper mitigation measures are formulated before the finalisation of EMP. As the
main impacts of the construction phase are envisaged in terms of air pollution only, this
natural mitigation would be significantly helpful in elimination of predicted impacts of
the phase. However the following principal major impacts to the environment are
considered for further planning of mitigation measures:
Release of construction materials and dust into the environment from the
construction site/materials can spoil the surrounding air quality;
84
Improper disposal of construction wastes can damage air, water and land quality;
The use of automobiles and machinery during construction can deteriorate the air
quality and generate temporary emission;
The use of automobiles and machinery generates noise pollution from
construction activities;
Irregular working hours, & traffic, night-working, flood-lighting and
transportation damage the socioeconomic balance of surrounding region;
Effects may occur due to accumulation of the contaminant in water resources &
soil due to uptake of construction material;
Short term changes or exploitation of environment is expected during construction
which could affect life style of nearby habitats, health of the human, birds, other
terrestrial animals;
Short term heavy construction might cause increase in noise level;
Effects on work place condition & human health due to accidents during the
construction works;
Effects on the socio-economic activity due to direct impacts or indirect impacts on
socio-economic activities.
The above mentioned points express that heavy construction can contaminate air, land,
water and socioeconomic balance of surrounding region but they can substantially be
minimised or reduced to significant extent by practising suitable and probable mitigation
methods suggested in the EMP. This explains that the EMP acts a core and base structure
of these issues and shall be formulated with due and ample care and consideration. A
slight negligence in the studying, selecting and implementing process can prove
hazardous to abiotic, biotic, social, and economical or other related attributes of the
environment. Hence, the areas of major focus of EMP shall be concentrated mainly on
operational and maintenance activity of construction phase, deciding proper manner and
route of working of the vehicles in order to avoid accidents and hefty traffic, providing
suitable facilities and effective conditions to avoid occupational hazards and proper
medical aid in case of occurrence of any accident so as to avoid any loss of life.
85
These were only the negative impacts but one shall never forget that every activity has an
effect followed by a side-effect therefore some of the major beneficial impacts to be
focused are:-
Employment opportunities: recruitment of local labourers;
Trading opportunities: procurement of construction materials locally;
Clean up operations, landscaping and plantations;
Hence, the construction activities can have some moderate temporary and permanent
impacts on site. The short-term impact will be mostly effective during construction phase.
The land use and operational amenities might create permanent changes (open plot area
to built-up resort & vegetation) on site which will be foreseen for long term. The
construction phase activities could have some impacts on on-site noise and air quality,
land use and ecology. It might also develop minor impacts on on-site soils, water quantity
& quality. The other impacts of construction phase will be small in magnitude as well as
temporary in nature and are expected to wear out gradually once the construction activity
is completed. Further, the major and long term impacts can also be reduced and
minimized by proper and substantial implementation of mitigation measures. In brief
during the construction phase following mitigation measures shall be taken in
consideration and implemented to prevent or minimize the respective impacts.
86
Appropriate designed closed & properly lined storage area shall be provided for
storage of construction materials to prevent land/soil contamination.
Designated fuel storage & refuelling area shall be provided with impervious lining
to prevent land contamination due spill/leak of fuel during storage & refuelling.
Excavated earth shall be used for filling of low-lying area or construction works as
well as landscaping.
Proper sanitation facilities shall be provided to avoid contamination of land due to
dumping of domestic waste as well as disposal of untreated sewage.
7.4.2 Water Environment
Construction material shall be stored at adequate distance from water storage in
order to prevent any chances of accidental leakage or spillage which could pollute
water storage.
Unused construction material shall be stored with utmost care.
Wherever required impervious lining shall be provided in storage area to avoid
accidental mixing.
Runoff from the construction work shall be properly collected & treated to prevent
entry of contaminant arising from construction work/site.
Spillage or leakage of construction materials can lead to groundwater contamination
and hence care shall be taken to minimise the chances of spillage or leakage of
construction material.
Construction materials like Ready Mix Concrete shall be used to prevent impact on
water environment.
7.4.3 Air Environment
To reduce the dust generation on site wherever & whenever required water shall be
sprinkled on ground or stock pile of excavated soil.
Unused construction material shall be stored immediately at designated area.
Equipments / machineries shall be used efficiently and shall be kept shut in order to
reduce air emission, noise pollution and consumption of energy resource.
Emission from the equipments/machineries shall be monitored on regular basis and
possible implementation shall be provided on site.
87
Transport vehicles shall be monitored & maintain regularly to control the emission
quality and fuel consumption.
Construction materials would be stored in covered stores or enclosed spaces to
prevent chance of airborne construction materials which can lead to air pollution of
local area.
Regular inspection of construction site shall be carried out to ensure regular and
timely removal of construction debris to the dumping sites or for recycle/reuse.
Vehicles used for construction work shall be kept maintained and highly efficient to
keep emissions within the permissible limits.
All necessary equipments/machineries shall be in good condition for proper
operation and minimal exhaust/emission.
Provision of necessary PPEs like face mask & eye-glasses are provided to
employees /labours engaged in construction activities.
7.4.4 Noise Generation
The machineries/equipment used on site shall be of highly maintained so they do
work with optimum efficiency generating less noise.
Operation of machineries/equipment causing high noise level shall not be operated
during the night time and all such operations shall be planned for day time only.
Transportation activities shall not be allowed at night to avoid high noise level in
nearby villages/locality. Only in case of emergency the transportation activities
shall be allowed at night time.
The vehicles engaged in construction activities & transportation of materials shall
be equipped with the horn of low noise level as recommended by RTO/concern
authority to avoid impacts on noise level. Further, adequate silencers must be
attached with all vehicles to reduce the noise.
Construction vehicles, equipments & machinery shall be turned off when not in use.
Proponent shall ensure that the labours engaged in construction site of high noise
area are provided with necessary PPEs.
88
7.4.5 Biological Environment
Construction premises shall be kept only on-site basis in order to limit the
biological damage.
Nearby agricultural area shall not be touched in any case by any activity or person
engaged in construction activity.
Regular monitoring shall be conducted to avoid and/or locate any hazards to natural
habitats.
Minimize contamination of each parameter such as air, water etc in order to
maintain the biological balance of the site and adjoining region.
Utmost care needs to be taken with the use of natural resources of site because
considerable destruction or bio-magnification of contamination can occur due to
imbalance of the habitats.
Ecological protection plan like greenbelt development shall be formulated and
implemented in the very inception of the construction activity.
89
7.4.7 Miscellaneous Measures
All activities must be conducted as per the guidelines and methodology / procedure
provided by the project authority.
In addition to the above, environment management cell shall be formulated and the cell
shall update the mitigation measure depending on the details of identified impacts as
mentioned in EIA Study as well as defined in environmental management record during
the construction phase by the officials appointed at site.
91
Regular inspection and cleaning of storm drains.
Cover waste storage areas.
Avoid application of pesticides and herbicides before wet season.
Conducting routine inspections to ensure cleanliness.
Good housekeeping in the above areas.
The Environmental Management Plan in the operational phase endeavors to mitigate
the impacts on the environment in order to meet the statutory requirements.
The wastewater generated from the domestic and the food courts will be treated in a
state of art sewage treatment plant with details as below and the treated water will be
used for gardening.
7.5.1.4 Sewage Treatment Plant
Process : Activated Sludge Process
Plant capacity : 8.3 m3/hr
Operation hours : 24 hrs
Disposal
Treated Sewage is proposed to be reused for gardening, toilet flushing etc., within
project premises.
7.5.1.5 Land Environment
The philosophy of solid waste management will be to encourage the four R‟s of waste
i.e. waste reduction, reuse, recycling, and recovery (materials & energy). This will
result in lesser reliance on land filling.
7.5.2 Noise Environment
Noise from the DG sets will be arrested from the source itself by providing acoustic
housing and by providing adequate green belt with in the premises.
7.5.3 Air Environment
To mitigate the impact of pollutants from vehicular traffic during the operational phase of
the site, the following measures are recommended for implementation:
Vehicle emission controls
Green Belt Development
D.G.sets operations
92
7.5.3.1 Vehicle emission controls
Vehicles (Cars, Buses, and Shuttles) to be used On-site should be confirmed to Euro-
III norms, which are in force. Regular maintenance of vehicles should be mandatory.
Restriction of speed is also helpful in reducing the emission rate. Instead of petrol, the
fuels like CNG/LPG could be encouraged.
7.5.3.2 Greenbelt development
Increasing vegetation in the form of greenbelt is one of the preferred methods to
mitigate air pollution. Plants generate oxygen, serve as a sink for pollutants, reduce the
flow of dust and reduce the noise pollution too.
7.5.3.3 D.G Sets operations
As the DG sets are only back up and they are going to be operated only during power
failures the period is going to be very less. The DG sets of 2 No of 1500 KVA
capacities will be looped to stack arrangement to facilitate treatment of the flue gases
and meet the PPCC standards.
7.5.4 Biological Environment
Extensive plantation and landscaping is proposed to mitigate any impacts during this
phase.
Development of a green belt in and around the building area is an effective way to check
pollutants and their dispersion into the surrounding areas. The degree of pollution
attenuation by a greenbelt depends on its height and width, foliage, surface area and
density, dry deposition velocity of the pollutants and the average wind speed through the
greenbelt.
The objectives of green belt management are:
To create a soothing environment for people to relax
To cultivate greenery within and outside Resort
To maintain landscaping by optimal use of resources
Rain water harvesting
Garden waste is accumulated in a designated area and used in the organo
converter
7.5.4.1 Drip Irrigation System
Drip Irrigation is operated as per schedule.
93
Drip irrigation system is used to avoid loss of moisture through evaporation. The
trees should be able to thrive under local agro-climatic conditions. In order to have
a ground cover, some fast growing species, have been recommended for mass
plantation.
The plants that may be considered for greenbelt development are as follows:
Erythrina Indica
Spathodea Companulata
Rain Tree
94
Terminalia Cutappa
Sterculia
Kristagalii
Cocos Nucifera
Tecoma cowdichowdi
Miilingtonia
Caesalpinia Pulcherimma
Gulmohar
Acacia auriculformis
Casuarin equisetifolia
Leucena mercrophulla
Others which are existing
95
8.Emergency communication systems will also be periodically tested. All deployed
personnel will be trained in basic fire fighting and first aid. Emergency evacuation
drills will be periodically carried out so that all personnel are fully aware of his/her
role.
9.Copies of the contingency plan will be displayed at prominent places on boards.
96
environmental quality monitoring, proper operation of pollution control equipment and
Liaison with regulatory bodies like PPCC.
Functions of EMC
The EMC will be responsible for the following;
To maintain the greenbelt
To meet the regulatory requirements stipulated with consent orders (Air, water and
hazardous waste) of CPCB / PPCC.
To conduct yearly environmental audit and submit environmental statement to
PPCC.
7.7.4 Setting Environmental Policy and Objectives
Environment Management Cell should develop a policy for the improvement of the
environment and the proposed piperack project. The environment Policy and objectives
should comprise of occupational health and safety policy, existing environment
management activities and improvement activities, activities regarding sustainable
development.
7.7.5 Environment Management Programme
The establishment of an environment management programme is to achieve the
environmental policy and objectives. This programme can be conducted by a
Management Representative who should continually monitor the activities going on in
the environment and should maintain a record for the environmental management
procedures and implementation.
7.7.6 Environment Management Audits and Records
Audit shall be conducted, to identify whether the activities are compiling with the
environment policies and objectives. Hence, Audit findings should reveal
Effectiveness of EMS
Identify and record any problems inherent in the system
Any failure in compliance and its corrective and preventive action
Make recommendations for remedial action
Inspection and maintenance reports
Environmental training records, etc.
97
These findings should be maintained as records and the top management should review
the audit report and take necessary actions for the Environmental Management.
7.7.7 Implementation of Environmental Management Plan
The proposed project should implement and maintain an Environmental Management
plan in order to mitigate the possible impacts generated by the proposed project activities.
The responsible personnel should review the environmental management practices and
improve the quality of environment through various objectives.
98
8 PROJECT BENEFITS, SUMMARY & CONCLUSION
The Environmental Impact Assessment report studied the proposed project and assessed its
predicted impacts on land, water, air, soil and biological environment of the region. The
proposed project was found to be complying with all the environmental, health and safety
standards, and is planning to use efficient and advanced technologies to reduce its air emission. It
has also laid down solid plans to monitor and combat any disaster or emergency situation in the
project.
99
99
9 DISCLOSURE OF CONSULTANTS ENGAGED
9.2 Accreditations & Certifications of Hubert Enviro Care Systems Pvt Ltd
1) National Accreditation Board for Testing and Calibration Laboratories
(NABL) accreditation for Laboratory services for ISO17025
2) ISO 9001:2008 qualified and certified
3) Environmental Management System complying ISO 14001:2004 certified
4) Occupational Health & Safety Management System complying OHSAS
18001:2007 certified
5) Approved Environmental Monitoring Laboratory for all ISO 14001
accreditation agencies viz BVQI, TUV, ISI, NQA etc.,
6) National Accreditation Board For Education & Training (NABET) for
Environmental Impact Assessment (EIA) Studies
7) Approved by varios state PCB.
8) Achilles joint qualification system. Achilles Id.15148
Kiwa Quality Management System
100