Write My CDR
Write My CDR
Write My CDR
A U S T RALIA’S NO. 1
+61 488 838 789
www.writemycdr.com
call us : +61 488 838 789
web: https://writemycdr.com
email : [email protected]
Who we are
WE ARE THE BEST CDR WRITING SERVICE
PROVIDER
We are known to be the number one CDR writing service provider for Engineers Australia. We
have the best team of professional writers who have years of experience and have excellent
success record. We provide the best CDR writing and reviewing service for all kinds of
engineering disciplines. We offer services related to career episode writing, summary statement
writing, resume writing and plagiarism removal and many more.
Why Us
We always give high priority to our Presentations are communication tools Presentations are communication tools
customers' satisfaction. So we that can be used as demonstrations. that can be used as demonstrations.
always deliver the report on time
and never miss the deadline.
CDR Writing Service For Engineers Australia What Is CDR And Why It Is Required?
WriteMyCDR.com offers the finest CDR Writing Service for Engineers Australia CDR refers to Competency Demonstration Report which is a technical
and we have a very high success rate of Competency Demonstration Report report required by Engineers Australia from the applicants who are
(CDR) approval of our clients from Engineers Australia. All the engineers who are aiming to make a career in engineering in Australia. Australia is utilizing
looking forward to Australia for skilled migration are required to provide their CDR Reports as an appraisal method for evaluating the competency and
CDR Report to Engineers Australia (EA) for the approval of skilled migration to education level of overseas Engineering students and professionals
Australia. who desire to work in Australia. The main rationale of CDR is a
CDR Writing Service for engineers Australia consists of preparing your demonstration of your skills and knowledge at a professional level as
detailed CV, writing Career Episodes (CEs), preparing a Summary statement either an engineering associate, professional engineer or engineering
(SS) and Continuing Professional Development (CPD). CDR Report writing is technologist. At WriteMyCDR.com, we have professional CDR writers
not an easy job and that is why we are here to help you provide our CDR who would see you through quality CDR report writing.
Writing Service.
CDR's Requirements
CDR Writing Service should be based in Australia
CDR Writing Service should be written by an
Engineering writer
CDR Writing Service should be registered in Australia.
CDR Writing Service should be familiar with Immigration
Process
Career Episode discloses if you have adequate knowledge and skill of the field you applied
for. So, choosing the topic is the most important job.
IN T R ODUCTION B A C KGROUND.
Objective and nature of the project you are focused in Nature of the engineering project you carried out and
Chronology – Dates and duration of the Career Episode (the objective of the project Nature of the work area your project
exact date of beginning as well as the ending of the episode) focused on. Organizational structure chart highlighting your
position in the project’s hierarchy
Your particular role in the team and how you applied your Overview of your project Information about whether the project met
knowledge.The engineering tasks that were entrusted to its goals/objectives.Engineering Knowledge and Skills, Engineering
you.How you accomplished the project.Any particular Application Ability and Professional and Personal StrengthsMention
technical difficulties/problems you encountered and how about the praise if you got any for the project
you solved them
For More info visit us at https://writemycdr.com/
call us : +61 488 838 789
web: https://writemycdr.com
email : [email protected]
Summary Statement Writing
What Is A Summary Statement Writing? Summary Statement Writing Service for Engineers Australia
The main thing you need to get in your mind is that talking of every single indicator that is given in the competency element is not necessary.
A summary statement is an important document in the Summary Statement Writing Service is a valuable tool that is utilized especially by
CDR for Migration Skills Assessment. CDR Summary off-shore engineering candidates. There is a proper tabular format that needs to
statement writing actively talks about the competencies be followed while writing this statement. The format has been prescribed by
one holds that is suited to the requirements laid down by the Engineers Australia itself and should contain an exact number of indicators,
EA. units and elements mentioned alluded by you along with valid text reference from
your Career Episodes. Everything has to be precise so that the EA assessor can
easily find the correct pertinent to a certain element.
The main thing you need to get in your mind is that talking of
every single indicator that is given in the competency A professional engineer summary statement has to be very precise and often
element is not necessary.And important indicators to reflect candidates fumble while preparing it. CDR Summary Statement is a major
areEngineering knowledge and skills that you possessHow criterion that needs to be fulfilled in order for you to migrate to Australia. Your
you have put your engineering skills to useYour professional professional journey cannot embark without this condition being fulfilled.
and personal characteristics Hence, you cannot think of taking any risks with your CDR Report whatsoever.
PE 1.1: The detailed and comprehensive theory of physical sciences and engineering of your
Engineering discipline.
PE 1.2 The conceptual knowledge in the following domains according to your engineering
discipline: Mathematics, computer & Information Sciences, Statics and numerical Analysis.
PE 1.3: According to your engineering discipline you should have deep knowledge of specialist
bodies.
PE 1.4: The proper research direction skill and knowledge development in your specific engineering
discipline.
PE 1.5: : Knowledge of all the dependent factors which have impact on your engineering field
PE 2.1: The designing of such methods which leads to solving of complex engineering problems.
PE 2.2: The fast eloquent tools and techniques in specific engineering field.
PE 2.4: The efficient application systematic approach which gives conductance to management in engineering projects.
Continuing Professional Development (CPD) refers to the process of tracking How To Write A CPD For Engineers Australia?
and documenting the skills, knowledge and experience gained both formally and
informally. CPD is one of the most essential parts of CDR which you cannot Proceeding with Professional Development (CPD) is principally a
afford to neglect. Details like tertiary courses, workshops, private studies, record or documentation of the expert experience, for example,
learning at workplace, synopsis participated by the candidates in the last three knowledge, surveys, skills, etc. and so on picked up by the
years must be included while preparing CPD to make it more attractive. The Engineer in the appropriate field of Engineering. CPD is a
main purpose is to see whether the engineer is updated with the new procedure that is generally attempted to record and to follow the
developments in engineering field or not. The assessors are taking a gander at formal just as intimate knowledge, surveys, skills and experience.
the endeavors you have been taking to remain receptive to the consistent This technique incorporates the preparation just as the starting
changes in the space and how refreshed you are and how you endeavor to fit in phase of the work and ability of the Engineer. A viable CPD should
according to their prerequisites. Our professional team can help the candidates comprise of these basic components. It is basic to incorporate a
to prepare CPD based on your category of profession. wide range of engineering related CPDs in the Competency
Demonstration Report (CDR)
Your CV ought to be close to three A4 pages. Regularly, it will involve a scanned document in
PDF group including basic confirmation.Each phase of your CV must be checked by a capable
Engineer, ideally a Member or Fellow of Engineers Australia. The accompanying articulation
must be added to the CV and signed by the Verifier:“I verify that this is a true statement of the
career history of (candidate’s name) during the period (date) to (date).” This statement must be
joined by the printed name, address, telephone number and status of the Verifier, with their
enrollment number if pertinent. The verification might be affirmed by Engineers Australia. In the
event that you can't give a verified CV because of abroad work, a reference letter from your past
employer is worthy. Such letters ought to plainly demonstrate work period, position held, and
fundamental obligations. On the off chance that the letter isn't in English, if it's not too much
trouble give duplicates of both the English interpretation and original document
CDR Reviewing Service for Engineers Australia's Migration Skills Assessment Process from WriteMyCDR.com is a standout. When you have arranged your CPD,
composed all the three Career Episodes, and have arranged a Summary Statement, you may feel sure about sending your CDR to the Engineers Australia. Be
that as it may, as a general rule, engineers turn up with practically nothing with regards to the outcomes. Because of this, you may be approached to present
your CDR once more, or there will be consequences, be put into an alternate classification for migration. Indeed, even in the wake of editing and proofreading,
you should need to have your CDR reviewed on to make sure about the nature of your CDR and keep dismissal in any respect from Engineers Australia. Upheld
by our long periods of involvement in preparing the CDR of thousands of customers, our group at WriteMyCDR.com gives professional looking CDR to stay away
from dismissal from EA.
There are numerous reasons why a CDR may get dismissed by the EA. The reasons of CDR rejection incorporates yet isn't just constrained to the utilization of
irregular tables, calculations, copying of text from pre-published resources and skipping minute details of company, missing the project objectives or
misrepresenting the engineering activities in the career episode. While reviewing on the CDR for our customers we focus on every one of these aspects and
guarantee that there is no stones left unturned to make your CDR of the most elevated amount. Our exceedingly experienced writers who have arranged
various winning CDR Reports are prepared to check your officially arranged Career Episodes, Summary Statement and Continuing Professional Documents
(CPD) and give you a CDR Reviewing Report by the procedures
You can generally take help of an expert Proofreader in such assignments. There are master editors and editors for CDR reports on the web and disconnected. A
speedy web search uncovers a great deal of such experts. Pick a Proofreader admirably dependent on their experience, claims, and different perceptions.
Procuring an expert guarantees better outcomes in view of their skill and experience. They may likewise deliver you with tips to make your CDR report even
better.Proofreading CDR is a crucial task in closing your report. You can do Proofreading yourself however be careful and take tips from individuals around you.
Or then again you can employ experts and loosen up a bit.
Word Limit needs to be strictly adhered to. For example – As per MSA (Migration Skills Assessment) booklet, career episodes need to be from 1000 – 2500
words.
Understanding that career episode is all about demonstrating how you as an individual have applied engineering abilities in the work. Therefore care must be taken
that you show your contribution and use phrases like “I designed”, “I investigated” rather than the team effort. This is in-fact the most common mistake we see
whenever we are carrying out a CDR Review.
Ensuring that each career episode highlights one competency unit and its subsequent elements in detail. Lot of times while reviewing CDRs, our team has
observed that applicants try to cramp in too much in each career episode and they write CE points as bullet points and not in the paragraphs.
CPD (Continuing Professional Development) needs to be restricted to One A4 Size Page. Applicants often extend it to even 3 pages in order to include all
certifications.
Another associated mistake (to the above point) which a lot of people do is putting in too much technical details (graphs, tables, calculation, photos, etc.) in the
career episode. While the intention of doing so might be correct (to display technical prowess) but it causes a hindrance in assessing the contribution. Therefore
fine balance needs to be maintained while writing career episodes.
CDR represent competency demonstration report is one of the crucial very mandatory report for those who are hoping to migrate to Australia. Despite the fact every
individuals are very conscious about the CDR report writing, there might be chances for CDR report to get rejected. There are some of the reasons CDR report
rejections which is listed below:-
• Plagiarism content
• Career episodes too technical
• Word count & not including problem statement
• Selections of absurd project
• Vague Summary statement
• Misguided CPD writing
Professional engineers who are willing to migrate to Australia have to go through the submission of competency submission report. So it is very crucial report
as per the guidelines of Engineers Australia. The main reason for CDR Report Assessment is to be familiar with:-
The CDR Report has Three Different Sections: Continuing Professional Development, Three Career Episodes and a Summary Statement. The total rules on
composing this report in displayed here to assist you with your CDR Writing. We additionally give CDR Writing, CDR Reviewing and CDR Tutoring Services.
Consideration for CPD writing as per the standard of Engineers Australia (EA) is listed below:-
Each Career Episodes must be partitioned in four Sections and they are Introduction, Background, Personal Engineering Activity and Summary. Every one of
these segments ought to be composed distinctively and should content explicit details.
Summary Statement is the most significant and troublesome piece of any CDR. In this area, you have to dissect that you have outlined all the competency
components for the assigned word related classification as depicted in the ANZSCO code. In the outline proclamation, you have to give the cross references of the
sections that you have written in each vocation scene. Just a single Summary Statement (SS) is required for every one of the three scenes.
Industrial Engineers with a Bachelor Degree or higher can survey their engineering capability. Modern Engineers are the engineers who are worried about
reorganization of complex procedures, structure, or associations by creating, improving and actualizing coordinated structures of individuals, cash, knowledge, data,
equipment, energy and materials. It is a standout amongst the most fundamental and basic engineering subjects. Industrial Engineers are in intense interest by a
few presumed specialized associations in Australia. They require Industrial engineers with high abilities and capability from Australia just as different countries over
the world.
CDR sample for Industrial Engineers includes all the required reports such as Curriculum Vitae (CV), Continuing Professional Development (CPD), three Career
Episodes (CE),and Summary Statement. The content of the CDR Report Samples is given below:
Continuing Professional Development (CPD): The sample of CPD clarifies the Engineering Knowledge of the applicant – 350 words.
Industrial Engineer Career Episode Sample 1: “COMBAT ROBOT COMPONENT DESIGN AND FABRICATION” -2056 words.
Industrial Engineer Career Episode Sample 2: “EVALUATING BENDING PROCESS PARAMETERS USING ABACUS 6.1 SOFTWARE”
Summary Statement Sample: Detailed explanation of all the competency element – 2000 words.
Demographics: This project was done during the final year of author bachelor’s degree in industrial engineering from “University name”, Malaysia. This project
was accomplished successfully by the proper support and guidance of “supervisor/tutor name” from January 2015 to April 2015, a period of four months.
Limited Motor Power.During project author performed the calculation to determine the required efficiency and specifications of the motor and used it for the
selection of the most suitable motor. He selected the 24V Magmotor S28-400 and procured it from the vendor. It had less weight and operated with the low
power of 24V but gave the desired torque. The testing part of the project proved that the performance of the combat robot was enhanced after incorporating the
newly selected motor.
Structural strength of the robot He used SolidWorks software and developed a defensive structure in such a way that it could protect its parts and also help the
weapon reach the further spot. He modelled the frame protecting the components of the robot such as belts, motors, gears, etc. and also provided the extra
defensive structures with an appropriate thickness to withstand in the fight.
Demographics: This project was done during the author bachelor’s degree in industrial engineering from “University name” Malaysia. This project was
accomplished successfully by the proper support and guidance of “supervisor/tutor name” from August 2014 to November 2014, a period of four month
To go through the literature review about the overall process of bending, materials required and design.
To prepare the project methodology to dictate the systematic flow of the tasks.
To do the necessary calculations of the variables before proceeding further in the project.
To take into account various parameters as well as materials to perform the design of the V-bending process.
To investigate the effect of V-bending process, e. spring back on mild steel having 1mm thickness.
To verify the accuracy of the bending force with the help of simulation software ABAQUS.
To perform the simulation test and analyze the output to conclude and tabulate the results.
To organize meetings with the supervisor, prepare progress reports and submit the report to the department.
Selection of parameters for the software Author obtained the values of the parameters from the manufacturer and used the proper bending shape and angle.
He chose the V-shape bending process and 90 degrees as the angle. He also chose work piece material like mild steel with 1mm of thickness with the
standard composition.
Analyzing the model in the software ABAQUS. He conducted various studies in the lab and tested the parameters with the help of lab equipment which was
based on the manufacturing principles and the rules of elasticity and plasticity, he obtained the parameters. He provided the correct values of yield stress,
poison’s ratio, %elongation, etc. and performed the simulation which was similar to the manufacturer’s experimental data.
Demographics: This project was done during the final year of bachelor’s degree in industrial engineering from “University name”. This project was
accomplished successfully by the proper support and guidance of “Tutor/professor name” from August 2015 to November 2015, a period of four months.
Firstly, conduct the literature survey on facility layouts, simulation software, optimization and other project related topics and got familiar with them.
To plan the project requirements, prepare a Gantt chart scheduling the activities and allocate the tasks among all team members.
To carry out the time study at each processing stage using a stopwatch and record the readings in time study sheet in order to complete the design layout.
To perform a simulation of design layout in FLEXSIM software and obtain various results.
To collect the simulation results, analyze them and made necessary changes as per requirement.
To revise the plant layout design, perform simulation, analyze it and come up with necessary conclusions.
To organize meetings with the supervisor, prepare progress reports and submit the report to the department.
Random flow of materials making the layout inflexible.The author selected the simulation software FLEXSIM which conclusively determined a good layout
among different available methods. The FLEXSIM software intelligently proposed the layout design for the inputted workstations, machines, production
lines, spaces, etc.
Bottleneck in welding workstations restricting the number of components.He decided to propose for adding another tack welding workstation. This idea
not only removed this issue of restricting the number of components but also increased the throughput.
Since the economy of Australia is developing exponentially with the dynamite financial blast in civil engineering part, there is a more
prominent need of Civil Engineers with applicable global experience. So as to take out the basic shortages of civil engineering to conquer
the delay in projects, the skilled migration visas are opened for Civil Engineers by Australian Government. The required capability for
entering this occupation is a four year certification or higher, alongside applicable experiences at period
CDR sample for Civil Engineers incorporates all the required reports, for example,such as Curriculum Vitae (CV), Continuing Professional
Development (CPD), three Career Episodes (CE), and Summary Statement. The substance of the CDR Report Samples is given underneath:
Continuing Professional Development (CPD): The example of CPD explains the Engineering Knowledge of the applicant – 250 words.
Civil Engineer Career Episode Sample 1:" DESIGN AND TESTING OF HIGH-PERFORMANCE CONCRETE” – 1806 words.
Civil Engineer Career Episode Sample 2: “DEMOLITION FORMER CATLEX DEPORT” – 1788 words.
Civil Engineer Career Episode Sample 3: “DESIGN OF CAMPUS LOCAL STRUCTURE PLAN” – 1801 words.
Civil Engineer Summary Statement Sample: Detail clarification of all the competency component – 1771 words.
Testing phase of concrete which showed low work ability.The author prepared a new mix-plan with a higher water to binder ratio to use. Prepared the next
mix by increasing the amount of water. He performed slump test again to analyzed result and finally concluded that the problem had been solved.
Premature cracking of the specimen during compression testing phase.He prepared a linear method to translate the alignment from vertical to the horizontal
direction. Executed the realignment plan of the cylindrical specimen and then moved towards the successful conduction of the test again.
Demographics: This project was done while the author was a designated Civil Engineer for Industrial Environment Services (IES), Australia under the Civil
Engineering department. This project was accomplished successfully by the proper support and guidance of “supervisor name “from March 2018 to April
2018.
To collect all the relevant information for the demolition of the depot in a safe manner.
To develop the project methodology and workflow diagram to execute the work in accordance with the time frame.
Demographics: In the first Career Episode, the author explains the project he carried out for the fulfillment of the degree of civil engineering. This project was
done while he was a designated research assistant for “University name” under the Civil Engineering department. This project was accomplished
successfully by the proper support and guidance of “Tutor/professor name “from August 2015 to November 2015, a period of four months in University Lab.
To carry out necessary studies, research and investigations to fix the nature and scope of the project.
To prepare the list of tasks to be done for completing the project.
To select and conduct tests of the concrete ingredients.
To carry out the mix design of the high-performance concrete following all the standards and specifications.
To conduct the slump test and compression test of cylindrical and cubical specimens prepared from the mix design concrete.
To analyze the test results and finalize the reports through interpretation of the data.
To generate the demolition and remediation management plan for a safe working environment and to draw site mapping by using AutoCAD
software.
To perform the mathematical calculations for estimating the project budget and analyzing its economic feasibility.
To use tracking equipment for tracking the resources implied in the demolition site.
To monitor and supervise the project work to ensure its completion in accordance with pre-determined time.
Problem & Solutions:
Health Hazard at the site.The author supervised the demolition procedure in such a way that the removal of tanks underground were exhibited as well as
transferred/hauled as a "perilous waste". He discharged it to a known provision of TSD by using the service of a Risky Transporter of Waste who was licensed
and subjected to every administration applied by the state government.
Hazard-prone demolition.He utilized another method to minimize hazardous demolition. He supervised the cleaning of the tanks on site, and further employed
Marine Chemist to verify the cleaning process as free of vapor, clean and safe/secured for hot work. He further checked the transportation of those cleaned
tanks with their subsequent verifications for the process of the materials salvaging or recycling.
Demographics: This project was done while the author was a civil engineering student for “university name” under the Civil Engineering department. This
project was accomplished successfully by the proper support and guidance of “Senior/professor “from August 2014 to November 2014.
To perform a site survey of the area for understanding its complex aspects.
To lineate the task flow of the project through the development of methodology.
To carry out the orientation of street which was based on loosely defined north-south grid across the subject land and designed subdivisions for
Wall construction.
To prepare the design of the landscape.
To designing the walking and cycling networks.
Furthermore, to undertakek the design of public transport.
To design the connector streets for the neighborhood.
Likewise carried out integrated water management.
To tabulate the results of the project in a report.
The author analyze the design and found that during heavy rainfall, there was a high chance of water collection in the land. It could result in blockage of
pathways for transportation as well as pedestrians. He discussed the issue with the project supervisor. According to his suggestions, he increased the
longitudinal slope of the drainage system at the corner of the footpath by increasing its inclination. The test check revealed that the flow of the water was
more immediate thereby eliminating the problem of water collection.
Another problem he faced was regarding the waste produced. Due to the heavy work at construction sites, there was a generation of many wastes in
various parts of the site. So, to overcome the situation, he initialized a strategy namely Reduce-Reuse-Recycle. He devised a protocol with the provision of
waste collection, distribution according to their nature and finally the recycling process for them. This protocol helped in maintaining all the wastes in
addition to reusing the waste in the project for usage again. Hence, the problem was solved eventually.
With the technological advancement, there is increment in the requirement of Mechanical Engineers in Australia. Now, engineers all around the world are
eager for Australia Immigration and seeking a space to make an outstanding career availing jobs in Australia. For this, you can prepare a CDR report for
Mechanical Engineer according to the Migration Skills booklet prepared by Engineers Australia. The engineers with four years of Bachelor’s degree in
Mechanical Engineering can apply for the post of Mechanical Engineers.
CDR sample for Mechanical Engineers includes all the required reports such as Curriculum Vitae (CV), Continuing Professional Development (CPD), three
Career Episodes (CE), and Summary Statement. The content of the CDR Report Samples is given below:
Continuing Professional Development (CPD): The sample of CPD clarifies the Engineering Knowledge of the applicant – 220 words.
Mechanical Engineer Career Episode Sample 1: “DEVELOPMENT OF DIESEL ENGINE TESTING PLATFORM INSTALLING AN ELECTRIC
DYNAMOMETER” – 2389 words
Mechanical Engineer Career Episode Sample 2: “INDUSTRIAL VISIT IN KHANNA PAPER MILLS” – 2255 words
Mechanical Engineer Career Episode Sample 3: “DESIGNING AND ANALYZING THE INTERMEDIATE SHAFT AND STEERING GEAR IN RACK-
AND-PINION STEERING SYSTEM” – 2476 words
Mechanical Engineer Summary Statement Sample: Detailed explanation of all the competency element – 2213 words.
For More info visit us at https://writemycdr.com/
call us : +61 488 838 789
web: https://writemycdr.com
email : [email protected]
Mechanical Engineering Career Episode 1
Project Name: DEVELOPMENT OF DIESEL ENGINE TESTING PLATFORM INSTALLING AN ELECTRIC
DYNAMOMETER
Project Type: Academic Based Career Episode Project
Demographics: This project was done during the final year of the author’s bachelor’s degree in mechanical engineering from “Name of the organization”.
This project was accomplished successfully by the proper support and guidance of Mr. from August 2015 to November 2015, a period of four months.
To perform a comprehensive study on the engine and dynamometer and collect all the essential data on the project from the literature study, research
books and supervisor.
To select the suitable dynamometer for this project by comparing the features of different dynamometers which were available in the internet sources
as well as different engineering books.
To select the proper specification of the engine for the test setup and model the 3D design of all the components and system such as motor casing,
dynamometer shaft, bearings etc. in Autodesk.
To execute the selection process for the electric motor and also develop the required modifications for the dynamometer with the help of my project
supervisor and the lab technician.
To construct the complete test bench for the diesel engine by installing all the required components and selected electric dynamometer to the test
bench and setup.
To perform the calibration of all the instrumentation, actuators and dynamometers in order to evaluate their performance in the system.
To connect the components with the use of cable and wires so that no short-circuit would occur during the operation.
To execute the engine performance and engine indicating test for the constructed the system.
To coordinate with my team members and supervisor while working in the venture.
Torsional oscillation problem during the engine testing.The author selected the driveshaft in such a way that the dynamometers would have the proper
stiffness and it also should have the adequate damping which would allow the engine to operate at the critical speed. Moreover, the author aligned the
dynamometer and the engine in an accurate way for better results and performance.
Flowing of gas in the exhaust system of the engine.For this, the author installed a smoke probe along the centerline in a vertical part of the exhaust system.
Furthermore, the author positioned the probe at least 5 pipe diameters far from the closet bend in the system to prevent the flowing of the smoke in the
exhaust system.
Problem regarding the vibration produced by the test engine which affected the performance.The author mounted the throttle actuator to the test bed and
directly below the test stand of the engine as the actuator used in the system was quite heavier. This helped to minimize the vibration level, and on testing, it
was found that the level of the vibration was reduced from earlier during the testing process.
Demographics: This carrier episode explains the author’s role and industrial visit in the “Name of the organization”. The author completed his bachelor in
mechanical engineering from “Name of the university”. The author performed industrial visit during 15-06-14 to 15-12-14, and the author was coordinated by
"supervisor name".
To gather the information about the working of the “Name of the organization” from the website.
To visit the raw material yard and analyze the basic process of the deinking plant.
To investigate the KPM-1 pulp mill (filler layer), and understand the working of the filler layer, and establish the flow chart.
To visit the KPM-2 pulp mill (bottom layer) and analyze the working of the paper cutting machine.
To go to the mechanical workshop, and observe the performance of the lathe, shaper, milling machine etc. and study the pretreatment procedure.
To work in the bearing maintenance program and find the cause for the damaged bearing.
Performance of CNC Machine.During cutting of the A4 paper through automatic CNC machine, the minimum diameter for the machine to accept for cutting was
220 cm up to 1200 cm, and the machine should be stopped working when the diameter up to 197 cm, but it stopped when the diameter was 200 cm. The
technical staff of the CNC department came, and checked the performance of the CNC to find out is there any obstruction during the cutting or not. There was
no obstruction, and they checked the programming of the CNC and noticed some wrong data in the programming, and corrected the CNC stopping time. The
cutting process was restarted and it stopped when the roller diameter reached to 197 cm as required.
Imperfect Lubrication.When the author checked the ball bearing in the paper mills, the author saw the brown ball tracks over the bearing and asked the
technician about the source of the cause. He told him the cause was imperfect lubrication. Due to the imperfect lubrication, high temperature caused such
marks in the bearing. The author discussed with the technical manager and planned to increase the amount of the lubricant during lubrication. The author
increased the amount of the lubricant, and the lubricant was chosen having high viscosity. After a few weeks, the author checked the bearing and did not saw
brown ball track in the bearing.
Demographics: This project was conducted while the author was studying mechanical engineering from “Name of the university”. The designing and analysis
work was conducted with the guidance of Assistant Professor from January 2015 to May 2015.
To study about the Rack-and-Pinion Steering System in a different research paper to find about the components, calculation involved and working
mechanism of the system.
To make initial consideration of different parameters required for the designing of the rack-and-pinion system
To examine the strength of gear tooth and analyzing stress for the shaft of steering of Steering Pinion Gear.
To analyze the contact stress of the Pinion gear and steering rack and determine boundary condition, contact stress, and compare Von-Mises strain and
stress.
To perform analysis of stress in steering rack and housing of rack and determine material required for designing along with their properties.
To complete the analysis of fatigue and stress produced in the shaft of steering by using ANSYS software.
During the simulation of the Pinion and shaft, the author found that the shaft was not moved when the pinion is moved. The author searched the reason behind
this cause and found that there was no clearance gap between the pinion and the shaft. The author then reduced the diameter of the pinion to adjust the
clearance gap and adjusted the pinion such that appropriate clearance is formed between pinion and shaft. After the adjustment of the pinion, the author
performed simulation again and found the movement of the shaft while helped to solve the issue.
The author found that the huge amount of stress was produced in the pinion and rack while the author was simulating the Rack-and-Pinion Steering system. The
author searched for the reason behind it and found that the author had made use of aluminium alloy for designing piston and rack which produce more strain.
The author researched the way to eliminate the strain and found use of Steel AISI 4340 helps to reduce the strain. The author then remodelled the pinion end
rack using AISI 4340 steel and performed simulation again and found that the strain was reduced making system efficient.
Electrical Engineering is considered as the primary field of engineering that comprises the study and applications of electromagnetism and electric power. The
Electrical Engineers from overseas with a wish to enhance their career in Australia are required to go through a CDR assessment by EA to get selected in the
employment code: ANZSCO 233311. The engineers with four years of Bachelor’s degree in Electrical Engineering can apply for the post of Electrical Engineers
CDR sample for Electrical Engineers includes all the required reports such as Curriculum Vitae (CV), Continuing Professional Development (CPD), three Career
Episodes (CE),and Summary Statement. The content of the CDR Report Samples is given below:
Continuing Professional Development (CPD): The sample of CPD clarifies the Engineering Knowledge of the applicant – 270 words.
Electrical Engineer Career Episode Sample 1: “DESIGN OF BRIDGELESS POWER FACTOR CORRECTION BOOST CONVERTER” – 1948 words
Electrical Engineer Career Episode Sample 2: “DESIGN AND INSTALLATION OF ELECTRICAL COMPONENTS FOR FIVE STOREY FULLY EQUIPPED
HOSPITAL” – 2152 words
Electrical Engineer Career Episode Sample 3: “CONSTRUCTION OF AL-NAKHEEL MADINAH 110kv/13.8kv” – 2044 words
Electrical Engineer Summary Statement Sample: Detailed explanation of all the competency element – 1884 words.
Demographics: This project was done during the final year of the author’s bachelor’s degree in electrical engineering from “Name of the university”. This project
was accomplished successfully by the proper support and guidance of Mr Professor from July 2015 to December 2015, a period of six months.
Some of the major problem that was encountered during the DESIGN OF BRIDGELESS POWER FACTOR CORRECTION BOOST CONVERTER along with their
solutions are shown below:-
Circuit isolation processThe author used a resistor based current sensing in the circuit for solving the problem. It provided the necessary isolation between the
power and the control circuit.
Problem 2 for Career Episode 1 and its solution
Output insufficient to drive the power from MOSFET gates.The author designed a drive circuit to provide the required signal for switching the MOSFET on or off
as per the requirement. Moreover, the author used optoisolator in the driver circuit to prevent the circuit from the shock hazards.
Demographics: This project from the company named ”Name of the company”. The head office of the company is located in “Name of the place”. The author
carried out this project as electrical site engineer. This project was accomplished successfully by the proper support and guidance of Mr. from July 2015 to
December 2015, a period of six months.
Engineering Activities of Electrical Engineering:
Installation of cable trayThe author first reviewed the overall design. The author consulted the HVAC engineer to find out that path of cable tray was
inappropriate according to the HVAC requirements. Keeping that view in mind, the author performed the cable tray load calculations and successively changed
the cable tray path.
Designing part of lighting in switchgear roomThe author went back to the calculation part of the project regarding the lighting system. After reviewing the
variables involved in the project, the author decided to calculate and redesign the lighting system using dialux software. The author noted down that after the
redesign and calculation, the standardized illumination was achieved.
Demographics: This project was done during the author’s work tenure at “Name of the organization”. The site location of the project was at “Name of the place”.
This was a group project, and the author was assigned as the QA/QC Engineer for this project. The author worked on this from July 2015 to December 2015, a
period of six months.
Engineering Activities of Electrical Engineering:
To acquire the detailed level of understanding related to the theoretical framework of the project and then move towards the survey phase.
To perform necessary calculations for the design.
To design the necessary battery banks, charger and circuit breaker.
To perform the pre-inspection of the materials.
To install and inspect the GIS, the switchgear and the power transformer.
To inspect the tasks performed to prepare the technical specification for achieving quality outputs.
To prepare the documentation of the project in the form of a final report.
Cable sealing end foundation.The author coordinated with the civil team on site to prepare new coring for the sleeves present in line with the cable sealing end
foundation. This ensured that a considerable reduction could be achieved in bending stress for cables. Thus, the application of this strategy helped to bring the high
voltage cable sleeves in line with the sealing end foundation.
Vertical arrangement of the capacitor bankThe author prepared a selection and design plan based on using the vertical framework of the capacitor bank to increase
the area. The author contacted the supplier for manufacturing the capacitor banks in vertical stacking arrangement as per the substation.
CDR report comprises of Career episodes, summary statement and continuing professional development which have individual guidelines which is described
below:-
Career Episodes
Career episode writing attribute to the quality CDR report and determines whether the report is as per the Engineers Australia report or not. It determines about
your engineering skills and experiences or any training you were involved in. There are altogether three career episodes which define your final year project or
internship or any work related project. Three career episodes should define three different projects where you were involved. Format of career episodes include
introduction, background, personal engineering activity and summary.
In introductions objective and nature of projects should be mentioned with word limits of 100. Dates and durations of the projects should be clearly mentioned in
chronological order. Nature of the engineering project you carried out and objective of the project should be subjected to background segments. Here, the word limits
is about 200-500. Similarly, in personal engineering activity applicant need to define his/her role in the team and about task accomplishment. Any technical problem
faced by the applicants and how he/she got rid of that particular problem should be clearly mentioned in this sections. At last in summary there should be the
overview of the project and define whether the objectives and goals is achieved or not.
Summary Statement is the most significant and troublesome piece of any CDR. In this area, you have to dissect that you have outlined all the competency
components for the assigned word related classification as depicted in the ANZSCO code. In the outline proclamation, you have to give the cross references of
the sections that you have written in each vocation scene. Just a single Summary Statement (SS) is required for every one of the three scenes.
It is the report which comprise of improvement to depict that you are exceptional in your engineering field. CPD works are generally ordered into two sections.
They are preparing based and improvement based. Here, training stands and goes about as a formal and straight procedure. Preparing sort of CPD design
typically manages the investigation of something specific or explicit that are connected and connected with aptitude and competency identified with
Engineering field. It manages the capacity and competency of the Engineer. Generally, Continuing Professional Development Writing assumes a main job in
giving and portraying scopes such as management, leadership, academics, projects, writing, communication and other skills.
Despite all these guidelines if you are still in dilemma about the quality of CDR report, there are number of CDR report writing service provider which are there at
your service for CDR reviewing. Writemycdr.com is one of the well-know and trust worthy online service provider who assist in writing and reviewing CDR
reports.