90 150 Kva

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

0 1 2 3 4 5 6 7 8 9

KOD LISTESI / CODE LIST


2.1 2.1 2.1 2.2 2.4 2.2 2.3 2.3 1.7 2.6 2.7 2.7 2.7 1.5

C1 : ISITICI TERMOSTAT / HEATER THERMOSTAT 25 26 27 2 391 33 34 35 N 401 42 43 44 N


F1,9 : SIGORTA / FUSE 2.7 2.8 2.8

G1 : AKU 12V / BATTERY 12V 41 N 19


G2 : SARJ ALTERNATORU / CHARGE ALTERNATOR 11 11
R3 R4
H1 : ISITICI / HEATER .7 .8
K0 : MARS SELENOIDI / STARTER SOLENOID
14 14

K2 : SEBEKE KONTAKTORU / MAINS CONTACTOR

K3 : JENERATOR KONTAKTORU / GENERATOR CONTACTOR


25 26 27 2 33 34 35 N 42 43 44 N
L N
R1 : ROLE / RELAY
L1I L2I L3I COM L1 L2 L3 N L1 L2 L3 N
S1 : ACIL STOP / EMERGENCY STOP
U2
S2 : SU HARARET ANAHTARI / COOLANT TEMP. SWITCH GENERATOR VOLTAGE MAINS (BUS) VOLTAGE
U1
S3 : YAG BASINC ANAHTARI / OIL PRESSURE SWITCH
COMAP AMF 25
B+ B-
S4 : SU SEVIYE SIVISI / COOLANT LEVEL SWITCH CONTROL MODULE
S5 : YAKIT SELENOIDI / FUEL SOLENOID
AI2 AI1
S6 : DUSUK YAKIT / LOW FUEL SWITCH B01 B02 + START (-) D+ COM TEMP OIL BI3 FUEL BI1 BI2 BI4 B03 B04
S7 : LAMBA ANAHTARI / LAMP SWITCH

T1,3: AKIM TRAFOSU / CURRENT TRANSFORMER


1 4 3 7 9 10 17 6 114 115 14 21 22 N 19
U1 : COMAP AMF 25 OTO.KONTROL MODUL / CONTROL MODULE

U2 : AKU SARJ CIHAZI / BATTERY CHARGER

1
1.8/ S1

GCB FEED BACK

MCB FEED BACK


R3 R4

F1

R1

114 115 1
16A YAKIT 2.3 2.6 1.3
FUEL
+ +

3 7 9 10 6 14 N 19

F10
3A
4

X1 1 X1 3 X1 2 X1 5 X1 7 X1 8 X1 4 X1 6 X2 1 X2 3

K0 C1

S7 S2 S3 S4
D+
S5 L H1
+ B+

L1 M G2 *
G1

PE PE PE

KABIN AYDINLATMA. JENERATOR SASESI TOPRAKLANMALIDIR.


CANOPY LAMP
BATTERY NEGATIVE MUST BE GROUNDED DIESEL MOTOR - ENGINE

11 14 .4 11 14 .6
*200kVA VE UZERI GRUPLARDA KULLANILIR 12 14 2.7
*FOR 200kVA AND BIGGER
22 24 2.8
32 34 2.8
Rev No
Scale Drawing T.SARAC
COMAP AMF MOTOR BAGLANTI SEMASI Rev Date

Drawing Nr. 90-275kVA Desing U.KUCUKSU 90-275kVA ELECTRICAL DIAGRAM Page Nr 1


Date 17.Jan.2005 Approved M.ALTUNISIK KONTROL PANOSU/CONTROL PANEL Total Page Nr 2
0 1 2 3 4 5 6 7 8 9

YUK-LOAD

L1

L2

L3

N
N X1 N N

U U T1 R

G
V V S
3 ~ T2

W W T3 T

SEBEKE / MAINS
ALTERNATOR

R S T 15 N
X3 7 X3 6 X3 5 X3 8 X3 1 X3 2 X3 3 X3 4

K2 K3

JEN.KONTAKTORU SEBEKE KONTAKTORU


U V W N
GEN.CONTACTOR MAINS CONTACTOR

F9

F2 F3 F4 F5 F6 F7 F8
6A 6A 6A 39 40 6A 6A 6A 6A
22 22
10A
K3 K2
13 16
24 24

12 22 32
46 R3 R3
1.7 1.7
14 24 34
391

114 391 401 115

25 26 27 2 33 34 35 N 114 391 401 115 42 43 44 41 19 N

25 26 27 2 33 34 35 N 114 391 401 115 42 43 44 41 19 N N


1.3 1.3 1.3 1.4 1.4 1.4 1.4 2.9 1.6 1.4 1.6 1.6 1.6 1.6 1.7 1.2 1.9 1.2 2.3

22 24 .4

Rev No
Scale Drawing T.SARAC
COMAP AMF TRANSFER BAGLANTI SEMASI Rev Date

Drawing Nr. 90-275kVA Desing U.KUCUKSU 90-275kVA TRANSFER ELECTRICAL DIAGRAM Page Nr 2
Date 17.Jan.2005 Approved M.ALTUNISIK KONTROL PANOSU/CONTROL PANEL Total Page Nr 2

You might also like