Mopo Simops
Mopo Simops
Mopo Simops
Construction Activitie s
Confine d Space Entry
Pre Commissioning
Working at he ight
Normal Activitie s
Othe r Activitie s
Commissioning
Sampling (LPG)
Pre ssure Te st
Hydrote sting
Ship loading
N2 purging
N2 purging
Coldwork
Excavation
Be rthing
Normal Activities
Ship loading A C N A N N C N A N N C N C N C C C A A N C C C C C C C A A C C N N N C A A A A
Sampling (LPG) A A A C C A A A A A C A A C A A A A A A C A A A A C C C A A A A A
Other Activities
N2 purging C C C A A A C A A A C A A A A A A C A A A A A A A A A A A A
Radiography Work C C A C C C C A C C C C C C A C C C C C A C C C A A C C
Coldwork A C C A A A C A A A A C C A C A A A A A C C A A C C
berthing A A A A A A A A A A A A A A A A A A A A A A A A A
Working at height C C C A C C A C A C A A C A C A A A A A A A A A
Pressure Test C A C A A A A A A A A A A A A A A A A A A A
Generator operation C A A A A C A A A A A A N C C C N C C C
Construction Activities
Excavation C A A A C C C C C A A A A A A A A
Pressurre Testing A A A A A A A A A A A A A A
Pre Commissioning
Hydrotesting C A A C C
Commissioning
Electrical energising A A A
N2 purging A