Hot Work (Grinding,We lding,Oxy-cutting,Blasting)

Proce ss Start-up, Purging Shutdown Ope rations

Isolation and De pre ssurisation of Proce ss Eqpt

Mate rial de live ry & re turn to main storage are a


Routine Visual Che ck / Equipme nt Inspe ction

Blocking Vital Acce ss/ Egre ss Route s/ Roads

Cle aning - incl. air blowing, wate r flushing


Static te sting incl.loop che cking, e le ctical

Dynamic te sting - proce ss e ne rgising


Ope rate Plant / Proce ss Equipme nt

Ve hicle move me nts within the site

He avy e quipme nt transportation


He avy Lifts not Ove r Live Syste ms
Vapour pushing of transfe r line

Pre ssurising with proce ss fluid


Function Te sting of ESD Syste m
Loading arm use by third party

Non De structive Te sting (NDT)


Unloding cargo from the ship

He avy Lifts Ove r Live Syste ms


Sphe re to sphe re transfe r
Matrix of Simultaneous Operations(SIMOPS)

Work in Hydrocarbon are a

Low pre ssure le ak te sting


Crane Ope rational/ Lifting
Loading bowse rs in gantry

Construction Activitie s
Confine d Space Entry

Ge ne rator ope ration

Tie -Ins to live syste m

He avy manual works

Pre Commissioning

Ele ctrical e ne rgising


Draining & Trucking

Pre ssurre Te sting


Radiography Work

Working at he ight
Normal Activitie s

Othe r Activitie s

Commissioning
Sampling (LPG)

Pre ssure Te st

Hydrote sting
Ship loading

N2 purging

N2 purging
Coldwork

Excavation
Be rthing
Normal Activities

Operate Plant / Process Equipment


A A A A A A C A A A A A A C N A A A A C A A N C C C C C C N A A C C N N N C A A A A

Unloding cargo from the ship N A C N A N N C N A N N C N C N C C C A A N C C C C C C C A A C C N N N C A A A A

Ship loading A C N A N N C N A N N C N C N C C C A A N C C C C C C C A A C C N N N C A A A A

Loading bowsers in gantry A A A N N A A A A C C N C A C C C A A N C C C C C C N A A C C N N N C A A A A

Sphere to sphere transfer A A N N A A A A C C N C A C C C A A N C C C C C C C A A C C N N N C A A A A

Loading arm use by third party A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A

Routine Visual Check / Equipment Inspection A A A A A A C C A A A A A A A A C A A A A A A A A A A A A A A A A A A A

Function Testing of ESD System N C N A N C C A A A A C C A A A A A A A A A A A A A A A N N N A N N N

Process Start-up, Purging, Shutdown Operations C N A A C C C C A A C C A A C A C C A C C C A A A A A A N C A A A N

Sampling (LPG) A A A C C A A A A A C A A C A A A A A A C A A A A C C C A A A A A

Vapour pushing of transfer line A A C C C C A C C C A A N C C C C C C C A A C A C C C C A A A A

Vehicle movements within the site A C C A A A A A A A A C A C C A A A N A A A A C A A A A A A A

Other Activities

N2 purging C C C A A A C A A A C A A A A A A C A A A A A A A A A A A A

Non Destructive Testing (NDT) C C C A C C C C A C C C C C C A C C C C C A C C C A A C C

Radiography Work C C A C C C C A C C C C C C A C C C C C A C C C A A C C

Confined Space Entry C A A C C C A C C A C C C C A C A A C C C C C A C C C

Coldwork A C C A A A C A A A A C C A C A A A A A C C A A C C

berthing A A A A A A A A A A A A A A A A A A A A A A A A A

Working at height C C C A C C A C A C A A C A C A A A A A A A A A

Isolation and Depressurisation of Process Eqpt C A A C A A A A C A A A A A A A C C C A C C N

Pressure Test C A C A A A A A A A A A A A A A A A A A A A

Draining & Trucking A C A C A A A A C A A A A A A A A A A A A

Generator operation C A A A A C A A A A A A N C C C N C C C

Construction Activities

Heavy Lifts Over Live Systems C C C A C C C C C C C A C C A A C A C

Heavy Lifts not Over Live Systems C C A A A C A A A A A A A A A A A A

Excavation C A A A C C C C C A A A A A A A A

Crane Operation/ Lifting A C A C C C C C A A A A A A A C

Hot Work (Grinding,Welding,Oxy-cutting,Blasting) A A A A A A A A A A A A A A A

Pressurre Testing A A A A A A A A A A A A A A

Tie-Ins to live system A A A A A A A A A A A A A

Blocking Vital Access/ Egress Routes/ Roads A C N N A A A A A A A A

Heavy manual works A A A A A A A A A A A

Work in Hydrocarbon area C A A A A A A A A A

Heavy equipment transpotation C A A A A A A A A

Material delivery & return to main storage area A A A A A A A A

Pre Commissioning

Static testing incl.loop checking, electical A A A A A A A

Cleaning - incl. air blowing, water flushing C C A A A C

Hydrotesting C A A C C

Low pressure leak testing A A A A

Commissioning

Electrical energising A A A

Dynamic testing - process energising A A

N2 purging A

Pressurising with process fluid

You might also like