By: Engr. Ronald John R. Cajilla

The document provides instructions for calculating the materials needed for column and beam forms, as well as scaffolding. It includes steps to determine the lumber, plywood, and nails required based on inputs for number of columns, dimensions, and heights. Tables are given to calculate lumber quantities for vertical and horizontal supports, braces, and flooring of scaffolding based on the number and heights of columns and beams.

Uploaded by

reynold
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
147 views3 pages

By: Engr. Ronald John R. Cajilla

The document provides instructions for calculating the materials needed for column and beam forms, as well as scaffolding. It includes steps to determine the lumber, plywood, and nails required based on inputs for number of columns, dimensions, and heights. Tables are given to calculate lumber quantities for vertical and horizontal supports, braces, and flooring of scaffolding based on the number and heights of columns and beams.

Uploaded by

reynold
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

BY: ENGR. RONALD JOHN R.

CAJILLA
FORMS
DETERMINING THE TOTAL MATERIALS USED FOR SQUARES & RECTANGULAR COLUMN FORMS

Enter Column Height M 2.35


Column Dimension A M 0.25
Column Dimension B M 0.25
Enter Number of Columns Units 38.00
1.20 109.44
Column Height

Note: One form per column - (Resusable form)


Total # of Bd.ft of frame required: 1,127.46 Bd.ft
4' OR 2.4M

Enter desired lumber dimension : W1 (in) W2 (in) L (ft)


2 2 10
Total Number of Lumber: 339.00 PCS
Total Number of Plywood required: 38.00 Sheet(s)
Total Number of #2 1/2 CWNails: 8.80 KGS
Total Number of #1 Finishing Nails: 3.70 Kgs

DETERMINING THE TOTAL MATERIALS USED FOR BEAMS & GIRDER FORMS

Enter Beam Length M 85.00


Beam Dimension D M 0.20
Beam Dimension B M 0.30
Enter Number of Beams Units 1.00
0.80 68.00

Total Beam Length


Total # of Bd.ft of frame required: 672.00 Bd.ft
W1 (in) W2 (in) L (ft)
2 2 10
Total Number of Lumber: 202.00 PCS
D Total Number of Plywood required: 24.00 Sheet(s)
Total Number of #2 1/2 CWNails: 5.50 KGS
Total Number of #1 Finishing Nails: 2.30 Kgs

B
BY: ENGR. RONALD JOHN R. CAJILLA
SCAFFOLDINGS
PARTS OF SCAFFOLDINGS
1. Vertical Support
2. Base of Vertical Support
3. Horizontal Member
4. Diagonal Braces
5. Block and Wedges
6. Nails & Bolts
BY: ENGR. RONALD JOHN R. CAJILLA

COLUMN BEAM
Enter Column Height M 3.00 Enter Beam Length M 3.50
Enter # of Columns Units 10.00 Enter # of Beams Units 6.00
Total Column Height: 30.00 M. Ht. Total Beam Length: 21.00 M. Ht.

FLOORING
Enter Floor Area SQ.M. 80.00

QUANTITY OF LUMBER FOR SCAFFOLDING OR STAGING


Lumber Column Beam
Flooring
Size Vertical Horizontal Brace Vertical Horizontal
2" x 2" 141.00 630.00 351.00 84.00 98.70 488.00
2" x 3" 210.00 950.10 525.00 126.00 147.00 728.00
2" x 4" 280.50 1,267.50 700.50 168.00 196.35 968.00

Enter total # of Bd.ft of Lumber required: 224.40 Bd.ft


W1 (in) W2 (in) L (ft)
2 4 8
Total Number of Lumber: 43.00 PCS
Total Number of #4 CWNails: 22.00 KGS