Project Gantt Chart

The document outlines the production timeline for a SecoRMU 24kV- Mirat PV Plant RMU from GEPC. It shows that procurement began in week 11 and continued through week 19. Key milestones included gas tank design from weeks 12-13, panel design from weeks 13-14, and component assembly, panel assembly and wiring from weeks 15-17. Factory acceptance testing was scheduled for week 18 with the expected shipment date of April 24, 2019 if no issues were found during FAT.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views1 page

Project Gantt Chart

The document outlines the production timeline for a SecoRMU 24kV- Mirat PV Plant RMU from GEPC. It shows that procurement began in week 11 and continued through week 19. Key milestones included gas tank design from weeks 12-13, panel design from weeks 13-14, and component assembly, panel assembly and wiring from weeks 15-17. Factory acceptance testing was scheduled for week 18 with the expected shipment date of April 24, 2019 if no issues were found during FAT.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SecoRMU 24kV- Mirat PV Plant: RMU - GEPC

EXW 24/05/2019 if no punch list at FAT

3/11/2019

3/12/2019

3/17/2019

3/18/2019

3/19/2019

3/21/2019

3/22/2019

3/24/2019

3/27/2019

3/31/2019

4/14/2019

4/17/2019

4/18/2019

4/21/2019

4/24/2019

4/25/2019

4/28/2019

5/10/2019

5/11/2019

5/12/2019
4/3/2019

4/7/2019

4/8/2019

5/1/2019

5/2/2019

5/5/2019
WK 11 WK 12 WK 13 WK 14 WK 15 WK 16 WK 17 WK 18 WK 19
WEEKS
SLD/Check list/Schematic drawings ready
BOM initiation and order release to vendors
Gas Tank design and drawings initiation
Panel design and drawings initation
Procurement
Gas tank body machine
Gas tank components assembling
Kiosk Procurement
Panel Framework
Panel Assembly & Wiring
Factory Routine test
FAT